How to cite this paper
Ramnath, B., Elanchezhian, C & Kesavan, R. (2011). A multi attribute decision making method for selection of optimal assembly line.Management Science Letters , 1(1), 65-72.
Refrences
Azim, A. (1999). Using simulation to design a lean material delivery system in an automotive body shop. SAE Technical paper series, 1999-01-1643, 1-5.
Barker, R. C. (1999). Production systems without MRP: A lean time based design. International Journal of Management Science, 22(4), 349-360.
Bicheno J., Holweg M. & Niessmann J. (2001). Constraint batch sizing in a lean environment. International Journal of Production Economics, 73, 41-49.
Ben Naylor, Nair, M. & Berry, D. (1999). Integrating the lean and agile manufacturing paradigms in the total supply chain. International Journal of Production Economics, 62, 107-118.
Brynzor, H., & Johansson, M. I. (1995). Design and performance of kitting and order picking system. International Journal of Production Economics, 4, 115- 125.
Chrisrmansson, M. & Medbo, L. (2002). A case study of principally new way of materials kitting an evaluation of time consumption and physical work load. International Journal of Industrial Ergonomics,30, 49-65.
Frank, C. & Garcia, (2000). Using value stream mapping as a strategic planning and implementation tool. European Management Journal, 16, 327-224.
Grajo, S. (1996). Strategic layout planning and simulation for lean manufacturing - A layout tutorial. Proceedings of the 1996 Winter Simulation Conference, 561-568.
Gunther, H.O., Gronalt, M. & Piller, F. (1996). Compact kitting in semi-automated printed circuit board assembly. International Journal of Production Economics, 43, 213-226.
Karthik, V.N. (2006). An integrated supplier selection methodology for designing robust supply chains. IEEE International conference on Management of Innovation and Technology, 906-910.
Tamaki, K., & Nof, Y. (1991). Design method of robot kitting system for flexible assembly. Robotics and Autonomous Systems, 8, 255 – 273.
Kull J. & Talluri S. (2008). A supply risk reduction model using integrated multi criteria decision making. IEEE Transactions on Engineering Management, 2008, 55(3), 409-419.
Luis, M., Sanche, Z. & Nagi, R., (2001). A review of agile manufacturing system. International Journal of production Research, 39(16),3651-3600.
Houshmand, M. & Jamshidnezhad, B. (2006). An Extended Model of design process of lean production systems by means of process variables. Robotics and computer Integrated Manufacturing, 22, 1-16.
Medbo, L. (2003). Assembly work execution and materials kit functionality in parallel flow assembly systems. International Journal of Industrial Ergonomics, 31, 263 - 281.
Oliver, N., Delbridge, R. & Barton, H. (2002). Lean production and manufacturing performance improvement in Japan, The UK and US. ESRC Business Research, University of Cambridge.
Panizzolo. R. (1998) Applying the lessons learned from 27 lean manufacturers, the relevance of relationship management. International Journal of Production Economics, 55, 223-240.
Rao Tummala, V.M., Chin, K.S. & Ho, S.H. (1997). Assessing success factors for implementing CE: A case study in Hong Kong electronics industry by AHP. International Journal of Production Economics, 49, 265-283.
Saaty, L. (1999). Fundamentals of the Analytic Network process. ISAHP, 1-14.
Saaty, L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83-98.
Salomon A. P., Marins A. S. & Duduch A. (2007). Multiple decision making applied to the supplier selection for assembly line equipments in an automotive Industry. ISAHP, 1-5.
Sullivan, G., McDonald, N. & Aken, E. V., (2007). Equipment replacement decisions and lean manufacturing. Robotics and Computer Integrated Manufacturing, 18, 255-265.
Barker, R. C. (1999). Production systems without MRP: A lean time based design. International Journal of Management Science, 22(4), 349-360.
Bicheno J., Holweg M. & Niessmann J. (2001). Constraint batch sizing in a lean environment. International Journal of Production Economics, 73, 41-49.
Ben Naylor, Nair, M. & Berry, D. (1999). Integrating the lean and agile manufacturing paradigms in the total supply chain. International Journal of Production Economics, 62, 107-118.
Brynzor, H., & Johansson, M. I. (1995). Design and performance of kitting and order picking system. International Journal of Production Economics, 4, 115- 125.
Chrisrmansson, M. & Medbo, L. (2002). A case study of principally new way of materials kitting an evaluation of time consumption and physical work load. International Journal of Industrial Ergonomics,30, 49-65.
Frank, C. & Garcia, (2000). Using value stream mapping as a strategic planning and implementation tool. European Management Journal, 16, 327-224.
Grajo, S. (1996). Strategic layout planning and simulation for lean manufacturing - A layout tutorial. Proceedings of the 1996 Winter Simulation Conference, 561-568.
Gunther, H.O., Gronalt, M. & Piller, F. (1996). Compact kitting in semi-automated printed circuit board assembly. International Journal of Production Economics, 43, 213-226.
Karthik, V.N. (2006). An integrated supplier selection methodology for designing robust supply chains. IEEE International conference on Management of Innovation and Technology, 906-910.
Tamaki, K., & Nof, Y. (1991). Design method of robot kitting system for flexible assembly. Robotics and Autonomous Systems, 8, 255 – 273.
Kull J. & Talluri S. (2008). A supply risk reduction model using integrated multi criteria decision making. IEEE Transactions on Engineering Management, 2008, 55(3), 409-419.
Luis, M., Sanche, Z. & Nagi, R., (2001). A review of agile manufacturing system. International Journal of production Research, 39(16),3651-3600.
Houshmand, M. & Jamshidnezhad, B. (2006). An Extended Model of design process of lean production systems by means of process variables. Robotics and computer Integrated Manufacturing, 22, 1-16.
Medbo, L. (2003). Assembly work execution and materials kit functionality in parallel flow assembly systems. International Journal of Industrial Ergonomics, 31, 263 - 281.
Oliver, N., Delbridge, R. & Barton, H. (2002). Lean production and manufacturing performance improvement in Japan, The UK and US. ESRC Business Research, University of Cambridge.
Panizzolo. R. (1998) Applying the lessons learned from 27 lean manufacturers, the relevance of relationship management. International Journal of Production Economics, 55, 223-240.
Rao Tummala, V.M., Chin, K.S. & Ho, S.H. (1997). Assessing success factors for implementing CE: A case study in Hong Kong electronics industry by AHP. International Journal of Production Economics, 49, 265-283.
Saaty, L. (1999). Fundamentals of the Analytic Network process. ISAHP, 1-14.
Saaty, L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83-98.
Salomon A. P., Marins A. S. & Duduch A. (2007). Multiple decision making applied to the supplier selection for assembly line equipments in an automotive Industry. ISAHP, 1-5.
Sullivan, G., McDonald, N. & Aken, E. V., (2007). Equipment replacement decisions and lean manufacturing. Robotics and Computer Integrated Manufacturing, 18, 255-265.