Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Management Science Letters » Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

MSL Volumes

    • ▼ Volume 16 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 15 (24)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (9)
    • ▼ Volume 14 (22)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 13 (27)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (5)
      • Issue 4 (7)
    • ▼ Volume 12 (33)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (13)
    • ▼ Volume 11 (251)
      • Issue 1 (36)
      • Issue 2 (39)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (29)
      • Issue 6 (27)
      • Issue 7 (20)
      • Issue 8 (12)
      • Issue 9 (8)
    • ▼ Volume 10 (448)
      • Issue 1 (24)
      • Issue 2 (25)
      • Issue 3 (24)
      • Issue 4 (25)
      • Issue 5 (26)
      • Issue 6 (26)
      • Issue 7 (25)
      • Issue 8 (27)
      • Issue 9 (27)
      • Issue 10 (30)
      • Issue 11 (33)
      • Issue 12 (30)
      • Issue 13 (30)
      • Issue 14 (30)
      • Issue 15 (30)
      • Issue 16 (36)
    • ▼ Volume 9 (208)
      • Issue 1 (16)
      • Issue 2 (14)
      • Issue 3 (11)
      • Issue 4 (12)
      • Issue 5 (12)
      • Issue 6 (16)
      • Issue 7 (16)
      • Issue 8 (16)
      • Issue 9 (16)
      • Issue 10 (16)
      • Issue 11 (19)
      • Issue 12 (20)
      • Issue 13 (24)
    • ▼ Volume 8 (119)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (22)
      • Issue 6 (20)
      • Issue 7 (6)
      • Issue 8 (6)
      • Issue 9 (8)
      • Issue 10 (10)
      • Issue 11 (11)
      • Issue 12 (16)
    • ▼ Volume 7 (54)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (5)
      • Issue 6 (5)
      • Issue 7 (4)
      • Issue 8 (4)
      • Issue 9 (4)
      • Issue 10 (4)
      • Issue 11 (4)
      • Issue 12 (4)
    • ▼ Volume 6 (74)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (7)
      • Issue 5 (6)
      • Issue 6 (6)
      • Issue 7 (8)
      • Issue 8 (6)
      • Issue 9 (5)
      • Issue 10 (5)
      • Issue 11 (5)
      • Issue 12 (5)
    • ▼ Volume 5 (129)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (10)
      • Issue 4 (12)
      • Issue 5 (14)
      • Issue 6 (14)
      • Issue 7 (8)
      • Issue 8 (8)
      • Issue 9 (11)
      • Issue 10 (8)
      • Issue 11 (9)
      • Issue 12 (10)
    • ▼ Volume 4 (387)
      • Issue 1 (34)
      • Issue 2 (30)
      • Issue 3 (34)
      • Issue 4 (42)
      • Issue 5 (33)
      • Issue 6 (43)
      • Issue 7 (42)
      • Issue 8 (40)
      • Issue 9 (39)
      • Issue 10 (20)
      • Issue 11 (18)
      • Issue 12 (12)
    • ▼ Volume 3 (426)
      • Issue 1 (40)
      • Issue 2 (47)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (27)
      • Issue 6 (50)
      • Issue 7 (51)
      • Issue 8 (30)
      • Issue 9 (24)
      • Issue 10 (25)
      • Issue 11 (25)
      • Issue 12 (27)
    • ▼ Volume 2 (365)
      • Issue 1 (51)
      • Issue 2 (32)
      • Issue 3 (40)
      • Issue 4 (44)
      • Issue 5 (42)
      • Issue 6 (52)
      • Issue 7 (53)
      • Issue 8 (51)
    • ▼ Volume 1 (70)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (25)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Management Science Letters
ISSN 1923-9343 (Online) - ISSN 1923-9335 (Print)
Quarterly Publication
Volume 8 Issue 6 pp. 543-554, 2018

Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS Pages 543-554 PDF Download PDF

Authors: K. Prakash Babu, V. Vijaya Babu, Nageswara Rao Medikondu

📋 Author Affiliations:
K. Prakash Babu1, V. Vijaya Babu2, N.R. Medikondu ORCID 3
1 Mechanical Department, College of Engineering, Andhra University, Visakhapatnam, 530 003, India, Mechanical Department, VRSEC, Vijayawada, 520007, India
2 Mechanical Department, College of Engineering, Andhra University, Visakhapatnam, 530 003, India
3 Mechanical Department, KLEF, Guntur, 522502, India
doi 10.5267/j.msl.2018.5.001
26 Source: Scopus
Crossref 26 Source: CrossRef

🔑 Keywords: Flexible manufacturing system, Heuristic algorithms, Makespan, AGVs

Abstract: Flexible Manufacturing System (FMS) is a compound system containing essentials like workplac-es, computerized storing and recovery systems, and material control devices such as automatons and automated guided vehicles (AGVs). In this paper, an attempt is made to study concurrently the machine and vehicle planning features in an FMS for minimization of the makespan. Planning is concerned with the distribution of partial resources to tasks over time and it is a resolution making procedure. It associates the processes, time, cost and overall purposes of the company. In this work, Nawaz-Enscore-Ham (NEH) heuristic algorithm is implemented to solve the scheduling problems in FMS. Eighty two problems and their existing solutions with different approaches are examined. The preliminary results indicate that the NEH heuristic algorithm provides better solu-tions with less computational time.

How to cite this paper
APA: Babu, K., Babu, V & Medikondu, N. (2018). Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS. Management Science Letters, 8(6), 543-554.
Chicago/Turabian: Babu, K., Babu, V & Medikondu, N. 2018. "Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS." Management Science Letters 8, no. 6 (2018): 543-554.
AMA: Babu, K., Babu, V & Medikondu, N. Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS. Management Science Letters. 2018;8(6):543-554.

References
Bilge, U., & Ulusoy, G. (1995). A time window approach to simultaneous scheduling of machines and material handling system in a FMS. Operations Research, 43(6), 1058–1070.
Biskup, D., & Herrmann, J. (2008). Single-machine scheduling against due dates with past-sequence dependent setup times. European Journal of Operational Research, 191(2), 587–592.
Campbell, H.G, Dudek, R.A., & Smith M.L. (1970). A heuristic algorithm for the n job m machine se-quencing problem. Management Science, 16, B630–B637.
Chawla, V., Chanda, A., & Angra, S. (2018). Automatic guided vehicles fleet size optimization for flexible manufacturing system by grey wolf optimization algorithm. Management Science Let-ters, 8(2), 79-90.
Cheng, T. C. E., & Lin, B. M. T. (2009). Johnson’s rule, composite jobs and the relocation problem. European Journal of Operational Research, 192, 1008–10013.
Dannenbring, D. G. (1977). An evaluation of flow shop sequencing heuristics. Management Science, 23(11), 1174-1182.
Eren, T., & Güner, E. (2008). A bicriterion flowshop scheduling with a learning effect. Applied Mathe-matical Modeling, 32, 1719–1733.
Gupta, J. N. D. (1971). A functional heuristic algorithm for the f1owshop scheduling problem. Opera-tional Research, 22, 39-47.
He, Y., & Hui, C. W. (2008). A rule-based genetic algorithm for the scheduling of single-stage multi-product batch plants with parallel units. Computers and Chemical Engineering, 32, 3067–3083.
Johnson, S.M. (1954). Optimal two-and-three-stage production schedules with set-up times included. Naval Research Logistic, 1, 61–68.
Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. (2005). An evaluation of se-quencing heuristics for flexible flowshop scheduling problems with unrelated parallel machines and dual criteria. Otto-von-Guericke-Universitat Magdeburg, 28(05), 1–23.
Li, X., Wang, Q., & Wu, C. (2009). Efficient composite heuristics for total flow time minimization in permutation flow shops. OMEGA, the International Journal of Management Science, 37(1), 155–164.
Modrak, V., Semanco, P., & Kulpa, W. (2013). Performance Measurement of Selected Heuristic Algo-rithms for Solving Scheduling Problems. In: 11th International Symposium on Applied Machine In-telligence and Informatics, 205–209.
Mosheiov, G., & Sarig, A. (2009). Due-Date Assignment on Uniform Machines. European Journal of Operational Research, 193(1), 49-58.
Nagar, A., Heragu, S. S., & Haddock, J. (1996). A combined branch and bound and genetic algorithm based approach for a flow shop-scheduling problem. Annals Operation Research, 63, 397–414.
Nageswararao, M., Narayanarao, K., & Rangajanardhana, G. (2017). Integrated scheduling of ma-chines and agvs in fms by using dispatching rules. Journal of Production Engineering, 20(1), 75-84.
Nawaz, M., Enscore Jr. E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA, 11(1), 91–95.
Neppalli, V. R., Chen, C. L., & Gupta, J. N. D. (1996). Genetic algorithms for the two stage criteria flowshop problem. European Journal of Operational Research, 95(2), 356–373.
Nowicki, E., & Smutnicki, C. (1996). A fast tabu search algorithm for the permutation flowshop prob-lem. European Journal of Operational Research, 91(1), 160–175.
Palmer, D.S. (1965). Sequencing jobs through a multistage process in the minimum total time: A quick method of obtaining a near-optimum. Operational Research, 16, 101–107.
Ronconi, D. P. (2004). A note on constructive heuristics for the flowshop problem with blocking. Inter-national Journal of Production Economics, 87(1), 39–48.
Stecke, K.E., & Solberg, J.J. (1981). Loading and control policies for a flexible manufacturing sys-tem. International Journal of Production Research, 19(5), 481 – 490.
Tseng, C. T., & Liao, C. J. (2008). A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. European Journal of Operational Research, 191(2), 360-373.
Wu, C.C., & Lee, W.C. (2009). A note on the total completion time problem in a permutation flow shop with a learning effect. European Journal of Operational Research, 192, 343–347.
Wu, X., & Zhou, X. (2008). Stochastic scheduling to minimize expected maximum lateness. European Journal of Operational Research, 190(1), 103–115.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Management Science Letters | 📅 Year: 2018 | 📖 Volume: 8 | 📄 Issue: 6 | 👁️ Views: 2475 | 📊 Crossref: 26

Related Articles:
  • Heuristics for no-wait flow shop scheduling problem
  • Revisiting the NEH algorithm- the power of job insertion technique for optimizing the makespan in permutation flow shop scheduling
  • Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown
  • A heuristic algorithm for scheduling in a flow shop environment to minimize makespan
  • A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems

📝 Ready to share your research?

Management Science Letters is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com