Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Makespan

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (508)
  • USCM (1092)
  • ESM (404)
  • AC (562)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(163)
Jordan(161)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
TOPSIS(80)
Job satisfaction(79)
Sustainability(79)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Genetic Algorithm(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(60)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2177)
Indonesia(1278)
Jordan(784)
India(782)
Vietnam(500)
Saudi Arabia(440)
Malaysia(438)
United Arab Emirates(220)
China(182)
Thailand(151)
United States(110)
Turkey(103)
Ukraine(102)
Egypt(97)
Canada(92)
Pakistan(84)
Peru(83)
Morocco(79)
United Kingdom(79)
Nigeria(77)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A hybrid artificial bee colony algorithm with an iterated local search mechanism for distributed no-wait flowshop problems with preventive maintenance Pages 307-322 Right click to download the paper Download PDF

Authors: Chuan-Chong Li, Yuan-Zhen Li, Lei-Lei Meng, Biao Zhang

DOI: 10.5267/j.ijiec.2025.2.003

Keywords: Distributed permutation flowshop scheduling, Makespan, No-wait, Preventive maintenance, Artificial bee colony algorim

Abstract:
In this paper, a distributed no-wait permutation flowshop scheduling problem with a preventive maintenance operation (PM/DNWPFSP) is investigated. A mixed-integer linear programming model for the PM/DNWPFSP is established. The problem characteristics and preventive maintenance characteristics of the PM/DNWPFSP are analyzed, and an accelerated calculation method of the completion time is proposed. A hybrid artificial bee colony (HABC) algorithm with an iterated local search mechanism for neighborhood search is proposed. To improve the quality of the solution, the shift, the swap and the hybrid operators are conducted in the critical factory. A local search operator based on the shift, the swap and the hybrid operators is proposed to jump out of local optima. A large number of experiments are conducted to evaluate the performance of the proposed HABC. The experimental results show that the proposed HABC algorithm has many promising advantages in solving the PM/DNWPFSP.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2025 | Volume: 16 | Issue: 2 | Views: 277 | Reviews: 0

 
2.

Joint optimization of production and maintenance scheduling for unrelated parallel machine using hybrid discrete spider monkey optimization algorithm Pages 539-554 Right click to download the paper Download PDF

Authors: Yarong Chen, Liuyan Zhong, Chunchun Shena, Jabir Mumt, Fuh-Der Chou

DOI: 10.5267/j.ijiec.2023.4.001

Keywords: Unrelated parallel machine scheduling, Hybrid discrete spider monkey optimization, Mixed integer programming model, Variable maintenance, Makespan

Abstract:
This paper considers an unrelated parallel machine scheduling problem with variable maintenance based on machine reliability to minimize the maximum completion time. To obtain the optimal solution of small-scale problems, we firstly establish a mixed integer programming model. To solve the medium and large-scale problems efficiently and effectively, we develop a hybrid discrete spider monkey optimization algorithm (HDSMO), which combines discrete spider monkey optimization (DSMO) with genetic algorithm (GA). A few additional features are embedded in the HDSMO: a three-phase constructive heuristic is proposed to generate better initial solution, and an individual updating method considering the inertia weight is used to balance the exploration and exploitation capabilities. Moreover, a problem-oriented neighborhood search method is designed to improve the search efficiency. Experiments are conducted on a set of randomly generated instances. The performance of the proposed HDSMO algorithm is investigated and compared with that of other existing algorithms. The detailed results show that the proposed HDSMO algorithm can obtain significantly better solutions than the DSMO and GA algorithms.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 3 | Views: 923 | Reviews: 0

 
3.

Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Pages 221-238 Right click to download the paper Download PDF

Authors: Yuan-Zhen Li, Kaizhou Gao, Lei-Lei Meng, Xue-Lei Jing, Biao Zhang

DOI: 10.5267/j.ijiec.2023.2.004

Keywords: Permutation flowshop scheduling, Peak power consumption, Makespan, Heuristics, Artificial bee colony algorithm, Iterated local search algorithm

Abstract:
This paper addresses the permutation flowshop scheduling problem with peak power consumption constraints (PFSPP). The real-time power consumption of the PFSPP cannot exceed a given peak power at any time. First, a mathematical model is established to describe the concerned problem. The sequence of operations is taken as a solution and the characteristics of solutions are analyzed. Based on the problem characteristics, eight heuristics are proposed, including balanced machine-job decoding method, balanced machine-job insert method, balanced job-machine insert method, balanced machine-job group insert method, balanced job-machine group insert method, greedy algorithm, beam search algorithm, and improved beam search algorithm. Similarly, the canonical artificial bee colony algorithm and iterated local search algorithm are modified based on the problem characteristics to solve the PFSPP. A large number of experiments are carried out to evaluate the performance of new proposed heuristics and metaheuristics. The results and discussion show that the proposed heuristics and metaheuristics perform well in solving the PFSPP.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 2 | Views: 1043 | Reviews: 0

 
4.

A computational evaluation of constructive heuristics for the parallel blocking flow shop problem with sequence-dependent setup times Pages 321-328 Right click to download the paper Download PDF

Authors: Imma Ribas, Ramon Companys

DOI: 10.5267/j.ijiec.2021.1.004

Keywords: Blocking, Parallel flow shop, Distributed flow shop, Dependent setup times, Makespan

Abstract:
This paper deals with the problem of scheduling jobs in a parallel flow shop environment without buffers between machines and with sequence-dependent setup times in order to minimize the maximum completion time of jobs. The blocking constraint normally leads to an increase in the maximum completion time of jobs due to the blockage of machines, which can increase even more so when setup times are considerable. Hence, the heuristic to solve this problem must take into account these specificities in order to minimize the timeout of machines. Because the procedures designed to solve the parallel flow shop scheduling problem must deal not only with the sequencing of jobs but also with their allocation to the flow shops, 36 heuristics have been tested in this paper, of which 35 combine sequencing rules with allocation methods while the last one takes a different approach that is more related to the nature of this problem. The computational evaluation of the implemented heuristics showed good performance of the heuristic designed especially for the problem (RCP0) when the setup times are considerable. Furthermore, the evaluation has also allowed us to propose a combined heuristic that leads to good solutions in a short CPU time.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 3 | Views: 1284 | Reviews: 0

 
5.

Truck-to-door sequencing in multi-door cross-docking system with dock repeat truck holding pattern Pages 201-220 Right click to download the paper Download PDF

Authors: Allahyar Ardakani, Jiangang Fei, Pedram Beldar

DOI: 10.5267/j.ijiec.2019.10.001

Keywords: Cross-docking, Dock Repeat Truck Holding Pattern, Heuristic Algorithm, Truck-to-door Sequencing, Multi-door, Makespan

Abstract:
Cross-docking is a logistics strategy that consolidates the products of different inbound trucks according to their destinations in order to reduce the inventory, order picking, and transportation costs. It requires a high level of collaboration between inbound trucks, internal operations, and outbound trucks. This article addresses the truck-to-door sequencing problem. Truck-to-door sequencing has been studied by some researchers in different titles such as scheduling and sequencing of inbound and outbound trucks of the cross-dock center. However, previous studies have not considered repeat truck holding pattern. Therefore, it is important to determine the doors and the sequence of the inbound and outbound trucks that should be assigned in a cross-dock center. This paper focuses on optimizing truck-to-door sequencing with consideration of repeat truck holding pattern in inbound trucks in order to minimize makespan. Two methods are considered to solve this problem, including mathematical modeling and a heuristic algorithm. In the first method, a mixed integer-programming model is developed to minimize the makespan. Then, GAMS software is used to solve small-scale problems. In the second approach, a heuristic algorithm is developed to find near-optimal solutions within the shortest time possible and the algorithm is used to solve large-scale problems. The results of the mathematical model and the heuristic algorithm are slightly different and show the good quality of the presented heuristic algorithm.

Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 2 | Views: 1726 | Reviews: 0

 
6.

Critical paths of non-permutation and permutation flow shop scheduling problems Pages 281-298 Right click to download the paper Download PDF

Authors: Daniel Alejandro Rossit, Fernando Tohmé, Mariano Frutos, Martín Safe, Óscar C. Vásquez

DOI: 10.5267/j.ijiec.2019.8.001

Keywords: Non-permutation flow shop, Scheduling, Makespan, Critical path

Abstract:
The literature on flow shop scheduling has extensively analyzed two classes of problems: permutation and non-permutation ones (PFS and NPFS). Most of the papers in this field have been just devoted on comparing the solutions obtained in both approaches. Our contribution consists of analyzing the structure of the critical paths determining the makespan of both kinds of schedules for the case of 2 jobs and m machines. We introduce a new characterization of the critical paths of PFS solutions as well as a decomposition procedure, yielding a representation of NPFS solutions as sequences of partial PFS ones. In structural comparisons we find cases in which NPFS solutions are dominated by PFS solutions. Numerical comparisons indicate that a wider dispersion of processing times improves the chances of obtaining optimal non-permutation schedules, in particular when this dispersion affects only a few machines.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 2 | Views: 1969 | Reviews: 0

 
7.

An improved NEH heuristic to minimize makespan for flow shop scheduling problems Pages 311-322 Right click to download the paper Download PDF

Authors: Meenakshi Sharma, Manisha Sharma, Sameer Sharma

DOI: 10.5267/j.dsl.2021.2.006

Keywords: Scheduling, Flow shop, Makespan, Heuristic, Processing time

Abstract:
Flow shop scheduling problems with rudimentary criteria of minimum makespan are the most important investigated problems in the field of scheduling. Generally during the process of generating an optimal sequence, multiple partial sequences claiming the optimal value of makespan are observed. In this paper a novel tie-breaking rule to select one of the best optimal sequences out of all possible partial sequences is developed which then applied to Nawaz-Enscore-Ham (NEH) heuristic to solve the scheduling problems in permutation flowshop without increasing the computational complexity. The performance of proposed heuristic is tested with other existing tie-breaking heuristics of similar complexity over Taillard and VRF's instances. Computational results reveal that in terms of solution quality, the proposed heuristic outperforms over the other NEH based heuristics of the same complexity reported in literature.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2021 | Volume: 10 | Issue: 3 | Views: 1746 | Reviews: 0

 
8.

Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times Pages 37-50 Right click to download the paper Download PDF

Authors: Mauricio Iwama Takano, Marcelo Seido Nagano

DOI: 10.5267/j.ijiec.2018.5.002

Keywords: Flow shop, Blocking, Zero buffer, Setup times, Makespan, Heuristics

Abstract:
This paper addresses the minimization of makespan for the permutation flow shop scheduling problem with blocking and sequence and machine dependent setup times, a problem not yet studied in previous studies. The 14 best known heuristics for the permutation flow shop problem with blocking and no setup times are pre-sented and then adapted to the problem in two different ways; resulting in 28 different heuristics. The heuristics are then compared using the Taillard database. As there is no other work that addresses the problem with blocking and sequence and ma-chine dependent setup times, a database for the setup times was created. The setup time value was uniformly distributed between 1% and 10%, 50%, 100% and 125% of the processing time value. Computational tests are then presented for each of the 28 heuristics, comparing the mean relative deviation of the makespan, the computational time and the percentage of successes of each method. Results show that the heuristics were capable of providing interesting results.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 1 | Views: 2143 | Reviews: 0

 
9.

NSGA-II simheuristic to solve a multi-objective flexible flow shop problem under stochastic machine breakdowns Pages 493-512 Right click to download the paper Download PDF

Authors: Daniel Felipe Rodríguez-Espinosa, Daniela Cruz-Vargas, Daniel Esteban Delgado-Merchán, David Hernando Gonzalez-Estupiñán, Eliana María González-Neir

DOI: 10.5267/j.jpm.2024.6.002

Keywords: Stochastic flexible flow shop, Machine breakdowns, NSGA-II, Tardy jobs, Makespan

Abstract:
This study proposes a simheuristic that hybridizes NSGA-II with Monte Carlo simulation to address a stochastic flexible flow shop problem featuring stochastic machine breakdowns. In real-world scenarios, machine breakdowns frequently occur, resulting in negative impacts such as time loss, late deliveries, decreased productivity, and order accumulation. Therefore, this study considers the times between failures and times to repair as stochastic parameters. Multiple objectives are concurrently addressed, including expected makespan, expected tardy jobs, and the standard deviation of tardy jobs. A mathematical model was formulated for the deterministic version of the problem and separately solved for the minimization of tardy jobs and the minimization of makespan in small instances. Subsequently, the proposed simheuristic was executed for both small and large instances. The results demonstrate that the NSGA-II simheuristic enhances outcomes across all objective functions compared to the simulation of optimal solutions provided by the mathematical models in small instances, yielding average GAPs of -16.64%, -21.87%, and -53.33% for expected tardy jobs, expected makespan, and standard deviation of tardy jobs, respectively. Furthermore, the simheuristic outperforms the simulation of solutions given by seven dispatching rules, showcasing average improvements of 48.01%, 48.18%, and 95.63% for the same objectives, respectively.

Details
  • 85
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 4 | Views: 618 | Reviews: 0

 
10.

Evaluating procedures in the NEH heuristic for the PFSP - SIST Pages 17-26 Right click to download the paper Download PDF

Authors: Clarissa Tararam de Laurentys, Marcelo Seido Nagano

DOI: 10.5267/j.jpm.2023.11.001

Keywords: Flow shop scheduling, Sequence-independent setup time, NEH heuristic, Makespan

Abstract:
The development and assessment of 48 heuristics for the sequence-independent setup time permutation flow shop problem (PFSP-SIST) are presented in this article. This contribution combines four tie-breaking solutions with twelve priority rules for the NEH heuristic fourth and first stage, respectively. Heuristics are evaluated on Ruiz and Allahverdi (2007) benchmark problem instances, that covers small, medium and large-size problems. The popular accelerations of Taillard were used in all tests, which were adapted to the sequence-independent setup time constraint. The aim is to reduce the longest job completion time, which is also referred to as makespan. Computation results show that using different tie-breaking strategies has a greater impact on performance than using different priority rules. The heuristics that presented the best results in relatively low computation time are those that use the FFs tie-breaking strategy procedure to the sequence-independent setup time problem.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 1 | Views: 664 | Reviews: 0

 
1 2 3
Previous Next

® 2010-2025 GrowingScience.Com