Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » AGVs

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS Pages 543-554 Right click to download the paper Download PDF

Authors: K. Prakash Babu, V. Vijaya Babu, Nageswara Rao Medikondu

DOI: 10.5267/j.msl.2018.5.001

Keywords: Flexible manufacturing system, Heuristic algorithms, Makespan, AGVs

Abstract:
Flexible Manufacturing System (FMS) is a compound system containing essentials like workplac-es, computerized storing and recovery systems, and material control devices such as automatons and automated guided vehicles (AGVs). In this paper, an attempt is made to study concurrently the machine and vehicle planning features in an FMS for minimization of the makespan. Planning is concerned with the distribution of partial resources to tasks over time and it is a resolution making procedure. It associates the processes, time, cost and overall purposes of the company. In this work, Nawaz-Enscore-Ham (NEH) heuristic algorithm is implemented to solve the scheduling problems in FMS. Eighty two problems and their existing solutions with different approaches are examined. The preliminary results indicate that the NEH heuristic algorithm provides better solu-tions with less computational time.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2018 | Volume: 8 | Issue: 6 | Views: 2235 | Reviews: 0

 
2.

Comparison and evaluation of job selection dispatching rules for integrated scheduling of multi-load automatic guided vehicles serving in variable sized flexible manufacturing system layouts: A simulation study Pages 187-200 Right click to download the paper Download PDF

Authors: S. Angra, A. K. Chanda, V. K. Chawla

DOI: 10.5267/j.msl.2018.3.002

Keywords: AGVs, Dispatching Rules, FMS, Simulation

Abstract:
This paper compares and evaluates the performance of five different conventional job selection dis-patching rules for scheduling of multi-load automatic guided vehicles (AGVs) serving for material handling operations in variable sized flexible manufacturing system (FMS) layout. Four sizes of FMS layout are considered for the performance evaluation of the five types of conventional job se-lection dispatching rules. The FMS layouts under consideration are served by the two multi-load AGVs. The multi-load AGVs cruises under machine initiated the nearest vehicle (NV) dispatching rule for the material handling activities at all work centers (WCs) for all four sizes of FMS layout. Four sizes of FMS layout produce five different types of parts and consist of three, six, nine and twelve work centers and loading-unloading centers, respectively. In the simulation test, it is found that the identical destination first (IDF) job selection rule having selection criterion based on the destination similarity of two picked up jobs outperforms all other job selection dispatching rules for an overall production rate of the FMS (parts/hr) in all four FMS layouts.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2018 | Volume: 8 | Issue: 4 | Views: 2292 | Reviews: 0

 

® 2010-2026 GrowingScience.Com