Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Management Science Letters » Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)
  • SCI (0)

MSL Volumes

    • Volume 1 (70)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (25)
    • Volume 2 (365)
      • Issue 1 (51)
      • Issue 2 (32)
      • Issue 3 (40)
      • Issue 4 (44)
      • Issue 5 (42)
      • Issue 6 (52)
      • Issue 7 (53)
      • Issue 8 (51)
    • Volume 3 (426)
      • Issue 1 (40)
      • Issue 2 (47)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (27)
      • Issue 6 (50)
      • Issue 7 (51)
      • Issue 8 (30)
      • Issue 9 (24)
      • Issue 10 (25)
      • Issue 11 (25)
      • Issue 12 (27)
    • Volume 4 (387)
      • Issue 1 (34)
      • Issue 2 (30)
      • Issue 3 (34)
      • Issue 4 (42)
      • Issue 5 (33)
      • Issue 6 (43)
      • Issue 7 (42)
      • Issue 8 (40)
      • Issue 9 (39)
      • Issue 10 (20)
      • Issue 11 (18)
      • Issue 12 (12)
    • Volume 5 (129)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (10)
      • Issue 4 (12)
      • Issue 5 (14)
      • Issue 6 (14)
      • Issue 7 (8)
      • Issue 8 (8)
      • Issue 9 (11)
      • Issue 10 (8)
      • Issue 11 (9)
      • Issue 12 (10)
    • Volume 6 (74)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (7)
      • Issue 5 (6)
      • Issue 6 (6)
      • Issue 7 (8)
      • Issue 8 (6)
      • Issue 9 (5)
      • Issue 10 (5)
      • Issue 11 (5)
      • Issue 12 (5)
    • Volume 7 (54)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (5)
      • Issue 6 (5)
      • Issue 7 (4)
      • Issue 8 (4)
      • Issue 9 (4)
      • Issue 10 (4)
      • Issue 11 (4)
      • Issue 12 (4)
    • Volume 8 (119)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (22)
      • Issue 6 (20)
      • Issue 7 (6)
      • Issue 8 (6)
      • Issue 9 (8)
      • Issue 10 (10)
      • Issue 11 (11)
      • Issue 12 (16)
    • Volume 9 (208)
      • Issue 1 (16)
      • Issue 2 (14)
      • Issue 3 (11)
      • Issue 4 (12)
      • Issue 5 (12)
      • Issue 6 (16)
      • Issue 7 (16)
      • Issue 8 (16)
      • Issue 9 (16)
      • Issue 10 (16)
      • Issue 11 (19)
      • Issue 12 (20)
      • Issue 13 (24)
    • Volume 10 (448)
      • Issue 1 (24)
      • Issue 2 (25)
      • Issue 3 (24)
      • Issue 4 (25)
      • Issue 5 (26)
      • Issue 6 (26)
      • Issue 7 (25)
      • Issue 8 (27)
      • Issue 9 (27)
      • Issue 10 (30)
      • Issue 11 (33)
      • Issue 12 (30)
      • Issue 13 (30)
      • Issue 14 (30)
      • Issue 15 (30)
      • Issue 16 (36)
    • Volume 11 (251)
      • Issue 1 (36)
      • Issue 2 (39)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (29)
      • Issue 6 (27)
      • Issue 7 (20)
      • Issue 8 (12)
      • Issue 9 (8)
    • Volume 12 (33)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (13)
    • Volume 13 (27)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (5)
      • Issue 4 (7)
    • Volume 14 (22)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 15 (24)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (9)

Keywords

Jordan(161)
Supply chain management(160)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
Job satisfaction(79)
Social media(78)
Factor analysis(78)
TOPSIS(78)
Knowledge Management(77)
Genetic Algorithm(76)
Sustainability(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Ahmad Makui(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2162)
Indonesia(1276)
Jordan(783)
India(779)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(89)
Pakistan(84)
Peru(83)
United Kingdom(77)
Nigeria(77)
Morocco(73)


» Show all countries

Management Science Letters

ISSN 1923-9343 (Online) - ISSN 1923-9335 (Print)
Quarterly Publication
Volume 2 Issue 6 pp. 2011-2018 , 2012

Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach Pages 2011-2018 Right click to download the paper Download PDF

Authors: Mostafa Kazemi, Saeed Poormoaied, Ghasem Eslami

DOI: 10.5267/j.msl.2012.06.020

Keywords: Job shop scheduling, Multi-objective problem, Quadratic assignment problem

Abstract: In this paper, we consider job shop scheduling and machine location problem, simultaneously. Processing, transportation, and setup times are defined as deterministic parameters. The purpose of this paper is to determine machine location and job scheduling such that the make span and transportation cost is minimized. Therefore, the proposed model is a multi-objective problem one, where the first objective function minimizes make span and another minimizes the transportation cost. To solve the multi-objective problem, two methods are evaluated. Considering combination of job shop scheduling problem and machine location problem makes the proposed model more complex than job shop scheduling problem, which is an NP-hard problem. Therefore, to solve the proposed model, genetic algorithm as a meta-heuristic algorithm is implemented. To show the efficiency of the proposed genetic algorithm, 6×6 job shop scheduling problems are considered.

How to cite this paper
Kazemi, M., Poormoaied, S & Eslami, G. (2012). Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach.Management Science Letters , 2(6), 2011-2018.

Refrences
Charnes, A., & Cooper W.W. (1961). Management models and industrial applications of linear programming. 1st ed., John Willey, New York.

Chou, T.Y., Hsu, C.L., Chen, M.C. (2008). A fuzzy multi criteria decision model for international tourist hotels location selection. International Journal of Hospitality Management, 27, 293–301.

Fisher H., & Thompson G. L. (1973). Probabilistic learning combinations of local job-shop scheduling rules. In Industrial Scheduling: NJ, Prentice Hall, 128-139.

Huang, R.H. (2010). Multi-objective job-shop scheduling with lot-splitting production. International Journal of Production Economics, 124, 206–213.

Keeney R.L., & Raiffa H. (1993). Decision with multiple objectives. Cambridge university press, Cambridge.

Jackson, J. R. J. (1956). An extension of Johnson’s results on job lot scheduling. Navel Research Logistics Quarterly, 3, 201-203.

Lawrence S. (1993). Resource constraint project scheduling. An experimental investigation ofhueristic scheduling techniques. Carnegie-Mellon University, 412-435.

Li, J.Q., Pan, Q.K., & Liang, Y.C. (2010). An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems. Computers & Industrial Engineering, 59, 647–662.

Niu, Q., Jiao, B., & Xingsheng, G. (2008). Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation, 205, 148–158.

Park, B.J., Choi, H.R., & Kang, M.H. (2007). Multi-agent Based Integration of Production and Distribution Planning Using Genetic Algorithm in the Supply Chain Management. Advances in Soft Computing, 41, 969-706.

Sule., D.R. (1997). Industrial Scheduling, PWS Publishing Company. 37-49.

Satake T., Morikawa K., & Nakamura N. (1994). Neural network approach for minimizing the make span of the general job shop. International Journal of Production Economics, 33, 67-74.

Sakawa, M., & Kubota, R. (2001). Two-objective fuzzy job shop scheduling through genetic algorithms. Electronics and Communications in Japan, 84 (4), 60-67.

Zeleny, M. (1973). Compromise Programming. Multiple Criteria Decision Making, 262-301.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Management Science Letters | Year: 2012 | Volume: 2 | Issue: 6 | Views: 2536 | Reviews: 0

Related Articles:
  • 5. Optimizing a multi-objectives flow shop scheduling problem by a novel ...
  • A useful empirical Bayesian method to analyse industrial data from saturate ...
  • Optimization costs of the single-machine scheduling problem with maintenanc ...
  • An improved sheep flock heredity algorithm for job shop scheduling and flow ...
  • A new mathematical model for the job shop scheduling problem with uncertain ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2025 GrowingScience.Com