Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Management Science Letters » Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

MSL Volumes

    • ▼ Volume 16 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 15 (24)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (9)
    • ▼ Volume 14 (22)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 13 (27)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (5)
      • Issue 4 (7)
    • ▼ Volume 12 (33)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (13)
    • ▼ Volume 11 (251)
      • Issue 1 (36)
      • Issue 2 (39)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (29)
      • Issue 6 (27)
      • Issue 7 (20)
      • Issue 8 (12)
      • Issue 9 (8)
    • ▼ Volume 10 (448)
      • Issue 1 (24)
      • Issue 2 (25)
      • Issue 3 (24)
      • Issue 4 (25)
      • Issue 5 (26)
      • Issue 6 (26)
      • Issue 7 (25)
      • Issue 8 (27)
      • Issue 9 (27)
      • Issue 10 (30)
      • Issue 11 (33)
      • Issue 12 (30)
      • Issue 13 (30)
      • Issue 14 (30)
      • Issue 15 (30)
      • Issue 16 (36)
    • ▼ Volume 9 (208)
      • Issue 1 (16)
      • Issue 2 (14)
      • Issue 3 (11)
      • Issue 4 (12)
      • Issue 5 (12)
      • Issue 6 (16)
      • Issue 7 (16)
      • Issue 8 (16)
      • Issue 9 (16)
      • Issue 10 (16)
      • Issue 11 (19)
      • Issue 12 (20)
      • Issue 13 (24)
    • ▼ Volume 8 (119)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (22)
      • Issue 6 (20)
      • Issue 7 (6)
      • Issue 8 (6)
      • Issue 9 (8)
      • Issue 10 (10)
      • Issue 11 (11)
      • Issue 12 (16)
    • ▼ Volume 7 (54)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (5)
      • Issue 6 (5)
      • Issue 7 (4)
      • Issue 8 (4)
      • Issue 9 (4)
      • Issue 10 (4)
      • Issue 11 (4)
      • Issue 12 (4)
    • ▼ Volume 6 (74)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (7)
      • Issue 5 (6)
      • Issue 6 (6)
      • Issue 7 (8)
      • Issue 8 (6)
      • Issue 9 (5)
      • Issue 10 (5)
      • Issue 11 (5)
      • Issue 12 (5)
    • ▼ Volume 5 (129)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (10)
      • Issue 4 (12)
      • Issue 5 (14)
      • Issue 6 (14)
      • Issue 7 (8)
      • Issue 8 (8)
      • Issue 9 (11)
      • Issue 10 (8)
      • Issue 11 (9)
      • Issue 12 (10)
    • ▼ Volume 4 (387)
      • Issue 1 (34)
      • Issue 2 (30)
      • Issue 3 (34)
      • Issue 4 (42)
      • Issue 5 (33)
      • Issue 6 (43)
      • Issue 7 (42)
      • Issue 8 (40)
      • Issue 9 (39)
      • Issue 10 (20)
      • Issue 11 (18)
      • Issue 12 (12)
    • ▼ Volume 3 (426)
      • Issue 1 (40)
      • Issue 2 (47)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (27)
      • Issue 6 (50)
      • Issue 7 (51)
      • Issue 8 (30)
      • Issue 9 (24)
      • Issue 10 (25)
      • Issue 11 (25)
      • Issue 12 (27)
    • ▼ Volume 2 (365)
      • Issue 1 (51)
      • Issue 2 (32)
      • Issue 3 (40)
      • Issue 4 (44)
      • Issue 5 (42)
      • Issue 6 (52)
      • Issue 7 (53)
      • Issue 8 (51)
    • ▼ Volume 1 (70)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (25)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Management Science Letters
ISSN 1923-9343 (Online) - ISSN 1923-9335 (Print)
Quarterly Publication
Volume 2 Issue 6 pp. 2011-2018, 2012

Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach Pages 2011-2018 PDF Download PDF

Authors: Mostafa Kazemi, Saeed Poormoaied, Ghasem Eslami

📋 Author Affiliations:
Mostafa Kazemi ORCID 1, Saeed Poormoaied2, Ghasem Eslami1
1 Department of Economic and Administrative Science, Ferdowsi University of Mashhad, Iran
2 Department of industrial engineering, Ferdowsi University of Mashhad, Iran
doi 10.5267/j.msl.2012.06.020
4 Source: Scopus
Crossref 2 Source: CrossRef

🔑 Keywords: Job shop scheduling, Multi-objective problem, Quadratic assignment problem

Abstract: In this paper, we consider job shop scheduling and machine location problem, simultaneously. Processing, transportation, and setup times are defined as deterministic parameters. The purpose of this paper is to determine machine location and job scheduling such that the make span and transportation cost is minimized. Therefore, the proposed model is a multi-objective problem one, where the first objective function minimizes make span and another minimizes the transportation cost. To solve the multi-objective problem, two methods are evaluated. Considering combination of job shop scheduling problem and machine location problem makes the proposed model more complex than job shop scheduling problem, which is an NP-hard problem. Therefore, to solve the proposed model, genetic algorithm as a meta-heuristic algorithm is implemented. To show the efficiency of the proposed genetic algorithm, 6×6 job shop scheduling problems are considered.

How to cite this paper
APA: Kazemi, M., Poormoaied, S & Eslami, G. (2012). Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach. Management Science Letters, 2(6), 2011-2018.
Chicago/Turabian: Kazemi, M., Poormoaied, S & Eslami, G. 2012. "Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach." Management Science Letters 2, no. 6 (2012): 2011-2018.
AMA: Kazemi, M., Poormoaied, S & Eslami, G. Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach. Management Science Letters. 2012;2(6):2011-2018.

References
Charnes, A., & Cooper W.W. (1961). Management models and industrial applications of linear programming. 1st ed., John Willey, New York.

Chou, T.Y., Hsu, C.L., Chen, M.C. (2008). A fuzzy multi criteria decision model for international tourist hotels location selection. International Journal of Hospitality Management, 27, 293–301.

Fisher H., & Thompson G. L. (1973). Probabilistic learning combinations of local job-shop scheduling rules. In Industrial Scheduling: NJ, Prentice Hall, 128-139.

Huang, R.H. (2010). Multi-objective job-shop scheduling with lot-splitting production. International Journal of Production Economics, 124, 206–213.

Keeney R.L., & Raiffa H. (1993). Decision with multiple objectives. Cambridge university press, Cambridge.

Jackson, J. R. J. (1956). An extension of Johnson’s results on job lot scheduling. Navel Research Logistics Quarterly, 3, 201-203.

Lawrence S. (1993). Resource constraint project scheduling. An experimental investigation ofhueristic scheduling techniques. Carnegie-Mellon University, 412-435.

Li, J.Q., Pan, Q.K., & Liang, Y.C. (2010). An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems. Computers & Industrial Engineering, 59, 647–662.

Niu, Q., Jiao, B., & Xingsheng, G. (2008). Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation, 205, 148–158.

Park, B.J., Choi, H.R., & Kang, M.H. (2007). Multi-agent Based Integration of Production and Distribution Planning Using Genetic Algorithm in the Supply Chain Management. Advances in Soft Computing, 41, 969-706.

Sule., D.R. (1997). Industrial Scheduling, PWS Publishing Company. 37-49.

Satake T., Morikawa K., & Nakamura N. (1994). Neural network approach for minimizing the make span of the general job shop. International Journal of Production Economics, 33, 67-74.

Sakawa, M., & Kubota, R. (2001). Two-objective fuzzy job shop scheduling through genetic algorithms. Electronics and Communications in Japan, 84 (4), 60-67.

Zeleny, M. (1973). Compromise Programming. Multiple Criteria Decision Making, 262-301.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Management Science Letters | 📅 Year: 2012 | 📖 Volume: 2 | 📄 Issue: 6 | 👁️ Views: 2896 | 📊 Crossref: 2

Related Articles:
  • 5. Optimizing a multi-objectives flow shop scheduling problem by a novel genetic algorithm
  • A useful empirical Bayesian method to analyse industrial data from saturated factorial designs
  • Optimization costs of the single-machine scheduling problem with maintenance activities by using genetic algorithm
  • An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems
  • A new mathematical model for the job shop scheduling problem with uncertain processing times

📝 Ready to share your research?

Management Science Letters is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com