Growing Science » Tags cloud » Makespan
Authors: K. Prakash Babu, V. Vijaya Babu, Nageswara Rao Medikondu
Keywords: Flexible manufacturing system, Heuristic algorithms, Makespan, AGVs
Journal: MSL | Year: 2018 | Volume: 8 | Issue: 6 | Views: 1834 | Reviews: 0
Authors: Edson Antonio Gonçalves de Souza, Marcelo Seido Nagano, Hugo Hissashi Miyata, Levi Ribeiro de Abreu
DOI: 10.5267/j.jpm.2022.12.001
Keywords: Blocking Flowshop, Setup Times, Makespan, Bounded Dynamic Programming
Journal: JPM | Year: 2023 | Volume: 8 | Issue: 2 | Views: 584 | Reviews: 0
Authors: Ingrid Simões Ferreira Maciel, Bruno de Athayde Prata, Marcelo Seido Nagano, Levi Ribeiro de Abreu
Keywords: Production Sequencing, Makespan, Evolutionary Algorithms, Mixed-Integer Linear Programming
Journal: JPM | Year: 2022 | Volume: 7 | Issue: 4 | Views: 1145 | Reviews: 0
Authors: Kewal Krishan Nailwal, Deepak Gupta, Kawal Jeet
DOI: 10.5267/j.ijiec.2016.2.005
Keywords: Flow shop scheduling, Makespan, Heuristic, No-wait flowshop
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 4 | Views: 2403 | Reviews: 0
Authors: Daniel Rossit, Fernando Tohmé, Mariano Frutos, Jonathan Bard, Diego Broz
DOI: 10.5267/j.ijiec.2015.11.004
Keywords: Lot Streaming, Makespan, Non-Permutation Flowshop, Scheduling
Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 3 | Views: 2714 | Reviews: 0
Authors: Aidin Delgoshaei, Mohd Khairol Mohd Ariffin, B. T. Hang Tuah Bin Baharudin, Zulkiflle Leman
DOI: 10.5267/j.ijiec.2015.5.002
Keywords: Backward Approach, Genetic Algorithm, Makespan, Project Scheduling, Resource-constrained
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 4 | Views: 2548 | Reviews: 0
Authors: André Serra e Santos, Ana Maria Madureira, Maria Leonilde R. Varela
DOI: 10.5267/j.ijiec.2015.1.001
Keywords: Makespan, MCT, MOMCT, Scheduling, Unrelated Parallel Machines
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 2 | Views: 1846 | Reviews: 0
Authors: Arun Gupta, Sant Ram Chauhan
DOI: 10.5267/j.ijiec.2014.12.002
Keywords: Benchmark Problems, Flow-shop, Heuristics, Makespan, Scheduling
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 2 | Views: 3516 | Reviews: 0
Authors: Mohsen Ziaee
DOI: 10.5267/j.ijiec.2013.11.004
Keywords: Heuristic, Job shop, Makespan, Scheduling
Journal: IJIEC | Year: 2014 | Volume: 5 | Issue: 2 | Views: 3116 | Reviews: 0
Authors: Omid Gholami, Yuri N. Sotskov
DOI: 10.5267/j.ijiec.2013.11.002
Keywords: Dispatching rules, Job-shop scheduling, Makespan, Total tardiness, Train timetabling
Journal: IJIEC | Year: 2014 | Volume: 5 | Issue: 2 | Views: 2050 | Reviews: 0
® 2010-2024 GrowingScience.Com