Processing, Please wait...

  • Publisher Home
  • Home
  • ๐Ÿ”™ Back
  • ๐Ÿ“š Journals
    • โš™๏ธ IJIEC - Industrial Engineering Computations
    • ๐ŸŒ IJDNS - Data and Network Science
    • ๐Ÿงช CCL - Current Chemistry Letters
    • ๐Ÿ’น AC - Accounting
    • ๐ŸŽฏ DSL - Decision Science Letters
    • ๐Ÿš› USCM - Uncertain Supply Chain Management
    • ๐Ÿ—๏ธ JPM - Journal of Project Management
    • ๐Ÿฅ HE - Healthcare Engineering
    • ๐Ÿ“ˆ SCI - Scientometrica
    • ๐Ÿ”ฉ ESM - Engineering Solid Mechanics
    • ๐ŸŒฟ JFS - Journal of Future Sustainability
    • ๐Ÿ’ผ MSL - Management Science Letters
  • ๐Ÿ“ Submit Article
  • ๐Ÿ“Š Statistics
  • ๐Ÿ“‹ About
    • ๐Ÿ“„ About Us
    • ๐Ÿ“ฐ Blog
    • ๐Ÿ“ข News
    • ๐Ÿ“ง Contact
  • ๐Ÿ“บ Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Total tardiness

โญ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (57)
  • SCI (53)

๐Ÿ”‘ Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

โœ๏ธ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

๐ŸŒ Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: ๐Ÿ“– Volume | ๐Ÿ“… Date | โญ Most Rates | ๐Ÿ‘๏ธ Most Views | ๐Ÿš€ Rising Stars | ๐Ÿ”— Citations (Scopus) | ๐Ÿ”ฅ Hot Papers
1.

Integrating sequence-dependent setup times and blocking in hybrid flow shop scheduling to minimize total tardiness Pages 147-158 PDF Download PDF

Authors: Atฤฑl Kurt

doi 10.5267/j.ijiec.2024.10.005

๐Ÿ”‘ Keywords: Hybrid flow shop scheduling, Iterative local search, Hybrid genetic algorithm, Total tardiness, Blocking, Sequence-dependent Setup Times

Abstract:
This study addresses the minimization of total tardiness in a hybrid flow shop scheduling problem with sequence-dependent setup times and blocking constraints. Each production stage includes multiple machines, and there are no buffers between the stages. The setup time required to process a job depends on the previously processed job. Two mixed-integer linear programming models are developed to formulate the problem. Moreover, an iterative local search algorithm and hybrid genetic algorithms are proposed to have quality solutions with minimal computational efforts. Several computational tests are conducted to tune the heuristic parameters for better performance. Computational experiments are carried out to evaluate the performance of solution methodologies in terms of quality and time. The results indicate that while mixed-integer programming models can solve small-size problem instances, they are not capable of solving large-sized instances. However, the proposed heuristic algorithms find quality solutions for all instances in a very short time.

Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2025 | Volume: 16 | Issue: 1 | Views: 1693

 
2.

A branch and bound method in a permutation flow shop with blocking and setup times Pages 255-266 PDF Download PDF

Authors: Marcelo Seido Nagano, Mauricio Iwama Takano, Joรฃo Vรญtor Silva Robazzi

doi 10.5267/j.ijiec.2021.10.003

๐Ÿ”‘ Keywords: Scheduling, Permutation flow shop, Blocking, Setup, Total flow time, Total tardiness, Branch and bound

Abstract:
In this paper it is presented an improvement of the branch and bound algorithm for the permutation flow shop problem with blocking-in-process and setup times with the objective of minimizing the total flow time and tardiness, which is known to be NP-Hard when there are two or more machines involved. With that objective in mind, a new machine-based lower bound that exploits some structural properties of the problem. A database with 27 classes of problems, varying in number of jobs (n) and number of machines (m) was used to perform the computational experiments. Results show that the algorithm can deal with most of the problems with less than 20 jobs in less than one hour. Thus, the method proposed in this work can solve the scheduling of many applications in manufacturing environments with limited buffers and separated setup times.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 2 | Views: 1754

 
3.

Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance Pages 415-426 PDF Download PDF

Authors: Tuane Tonani Yamada, Marcelo Seido Nagano, Hugo Hissashi Miyata

doi 10.5267/j.ijiec.2021.5.002

๐Ÿ”‘ Keywords: No-wait flowshop, Preventive maintenance, Total tardiness, Heuristic methods

Abstract:
Efficient business organizations must balance quality, cost, and time constraints in competitive environments. Reflecting the complexity of this task, we consider manufacturing systems including several stages of production chains requiring time measurement. When production scheduling is not prioritized in such enterprises, several negative effects may occur. A corporation may suffer financial penalties as well as negative brand exposure, and thus may find its credibility challenged. Therefore, in this study, we propose constructive methods to minimize a total tardiness criterion, considering preventative maintenance constraints to reflect the reality of industrial practice, focusing on a no-wait flowshop environment in which jobs are successively processed without operational interruptions. In addition to proposing constructive methods to solve the no-wait flowshop production scheduling problem, a metaheuristic is presented as an approach to improve results obtained by constructive methods. Computational experiments were designed and performed to compare several production scheduling algorithms. Among various constructive heuristics considered, an algorithm called HENLL using an insertion logic showed the best performance. The proposed metaheuristic is based on the iterated greedy (IG) search method, and the results obtained demonstrated significant improvement compared to the heuristics alone. It is expected that this study may be used by production planning and control (PPC) professionals to apply the proposed method to schedule production more efficiently. We show that the proposed method successfully presented a better solution in relation to total tardiness, considering the above mentioned environment.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 4 | Views: 1559

 
4.

Scheduling algorithm with controllable train speeds and departure times to decrease the total train tardiness Pages 281-294 PDF Download PDF

Authors: Omid Gholami, Yuri N. Sotskov

doi 10.5267/j.ijiec.2013.11.002

๐Ÿ”‘ Keywords: Dispatching rules, Job-shop scheduling, Makespan, Total tardiness, Train timetabling

Abstract:
The problem of generating a train schedule for a single-track railway system is addressed in this paper. A three stage scheduling is proposed to reduce the total train tardiness. We derived an appropriate job-shop scheduling algorithm called DR-algorithm. In the first stage, by determining appropriate weights of the dispatching rules, a pre-schedule is constructed. In the second stage, on the basis of the pre-schedule, the departure times of the trains are modified to reduce the number of conflicts in using railway sections by different trains. In the third stage, a train speed control helps the scheduler to change the trainsโ€™ speeds in order to reduce the train tardiness and to reach other objectives. The factual train schedule is based on the modified train speeds and on the modified departure times of the trains. The experimental running of the DR-algorithm on the benchmark instances showed this algorithm can solve train scheduling problems in a close to optimal way. In particular, the total train tardiness was reduced about 20% due to controlling train speeds and the departure times of the trains.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2014 | Volume: 5 | Issue: 2 | Views: 2616

 
5.

5. Optimizing a multi-objectives flow shop scheduling problem by a novel genetic algorithm Pages 345-354 PDF Download PDF

Authors: N. Shahsavari Pour, R. Tavakkoli-Moghaddam, H. Asadi

doi 10.5267/j.ijiec.2013.03.008

๐Ÿ”‘ Keywords: ANOVA, Flow-shop scheduling, Makespan, Multi-objective optimization Genetic algorithm, Total tardiness, Total waiting time

Abstract:
Flow-shop problems, as a typical manufacturing challenge, have become an interesting area of research. The primary concern is that the solution space is huge and, therefore, the set of feasible solutions cannot be enumerated one by one. In this paper, we present an efficient solution strategy based on a genetic algorithm (GA) to minimize the makespan, total waiting time and total tardiness in a flow shop consisting of n jobs and m machines. The primary objective is to minimize the job waiting time before performing the related operations. This is a major concern for some industries such as food and chemical for planning and production scheduling. In these industries, there is a probability of the decay and deterioration of the products prior to accomplishment of operations in workstation, due to the increase in the waiting time. We develop a model for a flowshop scheduling problem, which uses the planner-specified weights for handling a multi-objective optimization problem. These weights represent the priority of planning objectives given by managers. The results of the proposed GA and classic GA are analyzed by the analysis of variance (ANOVA) method and the results are discussed.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2013 | Volume: 4 | Issue: 3 | Views: 4052

 
6.

Effective heuristics for solving dynamic variant of single processor total tardiness problems Pages 13-22 PDF Download PDF

Authors: Saheed Akande, Ayodeji Emmanuel Oluleye, Elkanah Oyetunji

doi 10.5267/j.jpm.2017.11.001

๐Ÿ”‘ Keywords: Heuristics, Branch and Bound, Total Tardiness, Efficient solution, Effective

Abstract:
This paper considers the dynamic variant of single processor scheduling problem of minimizing total tardiness. In practice, it occurs when minimizing tardiness penalty. The problem is NP-hard; thus two heuristics were proposed. The utility of the proposed models was demonstrated through computational experiments and comparative analyses against existing solution methods and the Branch and Bound (BB) method. The results show that the proposed models yield effi-cient solutions and in most cases perform effectively better than the existing heuristics in the lit-erature.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2018 | Volume: 3 | Issue: 1 | Views: 1846

 

® 2010-2026 GrowingScience.Com