Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Hugo Hissashi Miyata

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (96)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Artificial intelligence(85)
Financial performance(84)
Sustainability(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Factor analysis(78)
Genetic Algorithm(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Sautma Ronni Basana(31)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(28)


» Show all authors

Countries

Iran(2190)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(477)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(105)
Peru(94)
Canada(92)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance Pages 415-426 Right click to download the paper Download PDF

Authors: Tuane Tonani Yamada, Marcelo Seido Nagano, Hugo Hissashi Miyata

DOI: 10.5267/j.ijiec.2021.5.002

Keywords: No-wait flowshop, Preventive maintenance, Total tardiness, Heuristic methods

Abstract:
Efficient business organizations must balance quality, cost, and time constraints in competitive environments. Reflecting the complexity of this task, we consider manufacturing systems including several stages of production chains requiring time measurement. When production scheduling is not prioritized in such enterprises, several negative effects may occur. A corporation may suffer financial penalties as well as negative brand exposure, and thus may find its credibility challenged. Therefore, in this study, we propose constructive methods to minimize a total tardiness criterion, considering preventative maintenance constraints to reflect the reality of industrial practice, focusing on a no-wait flowshop environment in which jobs are successively processed without operational interruptions. In addition to proposing constructive methods to solve the no-wait flowshop production scheduling problem, a metaheuristic is presented as an approach to improve results obtained by constructive methods. Computational experiments were designed and performed to compare several production scheduling algorithms. Among various constructive heuristics considered, an algorithm called HENLL using an insertion logic showed the best performance. The proposed metaheuristic is based on the iterated greedy (IG) search method, and the results obtained demonstrated significant improvement compared to the heuristics alone. It is expected that this study may be used by production planning and control (PPC) professionals to apply the proposed method to schedule production more efficiently. We show that the proposed method successfully presented a better solution in relation to total tardiness, considering the above mentioned environment.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 4 | Views: 1319 | Reviews: 0

 
2.

Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Pages 99-118 Right click to download the paper Download PDF

Authors: Edson Antonio Gonçalves de Souza, Marcelo Seido Nagano, Hugo Hissashi Miyata, Levi Ribeiro de Abreu

DOI: 10.5267/j.jpm.2022.12.001

Keywords: Blocking Flowshop, Setup Times, Makespan, Bounded Dynamic Programming

Abstract:
This paper aims at presenting an algorithm for solving the blocking flow shop problem with sequence dependent setup times (BFSP-SDST) with minimization of the makespan. In order to do so, we propose an adapted Bounded Dynamic Programming (BDP-SN) algorithm as solution method, since the problem itself does not present a significant number of sources in the state-of-art references and also because Dynamic Programming and its variants have been resurfacing in the flowshop literature. Therefore, we apply the modified method to two sets of problems and compare the results computationally and statistically for instances with a MILP and a B&B method for at most 20 jobs and 20 machines. The results show that BDP-SN is promising and outperforms both MILP and B&B within the established time limit. In addition, some suggestions are made in order to improve the method and employ it in parallel research regarding other branches of machine scheduling.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2023 | Volume: 8 | Issue: 2 | Views: 1762 | Reviews: 0

 

® 2010-2026 GrowingScience.Com