Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Mohd Khairol Mohd Ariffin

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1099)
  • ESM (428)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (37)
  • SCI (36)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
Sustainability(87)
Artificial intelligence(87)
optimization(87)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Knowledge Management(79)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2198)
Indonesia(1311)
Jordan(815)
India(798)
Vietnam(510)
Saudi Arabia(478)
Malaysia(447)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(115)
Turkey(114)
Ukraine(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(87)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A new method for decreasing cell-load variation in dynamic cellular manufacturing systems Pages 83-110 Right click to download the paper Download PDF

Authors: Aidin Delgoshaei, Mohd Khairol Mohd Ariffin, Btht Hang Tuah Bin Baharudin, Zulkiflle Leman

DOI: 10.5267/j.ijiec.2015.7.004

Keywords: Cell Load Variation, Cell Scheduling, Facilities planning and design, Part Routing

Abstract:
Cell load variation is considered a significant shortcoming in scheduling of cellular manufacturing systems. In this article, a new method is proposed for scheduling dynamic cellular manufacturing systems in the presence of bottleneck and parallel machines. The aim of this method is to control cell load variation during the process of determining the best trading off values between in-house manufacturing and outsourcing. A genetic algorithm (GA) is developed because of the high potential of trapping in the local optima, and results are compared with the results of LINGO® 12.0 software. The Taguchi method (an L_9 orthogonal optimization) is used to estimate parameters of GA in order to solve experiments derived from literature. An in-depth analysis is conducted on the results in consideration of various factors, and control charts are used on machine-load variation. Our findings indicate that the dynamic condition of product demands affects the routing of product parts and may induce machine-load variations that yield to cell-load diversity. An increase in product uncertainty level causes the loading level of each cell to vary, which in turn results in the development of “complex dummy sub-cells”. The effect of the complex sub-cells is measured using another mathematical index. The results showed that the proposed GA can provide solutions with limited cell-load variations.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 1 | Views: 2541 | Reviews: 0

 
2.

Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms Pages 503-520 Right click to download the paper Download PDF

Authors: Aidin Delgoshaei, Mohd Khairol Mohd Ariffin, B. T. Hang Tuah Bin Baharudin, Zulkiflle Leman

DOI: 10.5267/j.ijiec.2015.5.002

Keywords: Backward Approach, Genetic Algorithm, Makespan, Project Scheduling, Resource-constrained

Abstract:
Resource-Constrained Project Scheduling Problem (RCPSP) is considered as an important project scheduling problem. However, increasing dimensions of a project, whether in number of activities or resource availability, cause unused resources through the planning horizon. Such phenomena may increase makespan of a project and also decline resource-usage efficiency. To solve this problem, many methods have been proposed before. In this article, an effective backward-forward search method (BFSM) is proposed using Greedy algorithm that is employed as a part of a hybrid with a two-stage genetic algorithm (BFSM-GA). The proposed method is explained using some related examples from literature and the results are then compared with a forward serial programming method. In addition, the performance of the proposed method is measured using a mathematical metric. Our findings show that the proposed approach can provide schedules with good quality for both small and large scale problems.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 4 | Views: 3147 | Reviews: 0

 

® 2010-2026 GrowingScience.Com