Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Deepak Gupta

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

No idle flow shop scheduling models with separated set-up times and concept of job weightage to optimize rental cost of machines Pages 101-108 Right click to download the paper Download PDF

Authors: Shakuntala Singla, Harshleen Kaur, Deepak Gupta, Jatinder Kaur

DOI: 10.5267/j.jpm.2024.2.001

Keywords: Flowshop, Set-up time, No idle, Sequence, Scheduling, Weightage

Abstract:
The current paper investigates a two-stage flow shop scheduling model with no idle restriction, in which the time taken by machines to set-up is separately considered from the processing time. Owing to inherent usefulness as well as relevance in real-world situations, jobs' weight has additionally included. To eliminate machine idle time and cutting machine cost of rental, the reason for the conduct of the study is to provide a heuristic algorithm which, once put into practice, processes jobs in an optimal way, guarantees in smallest conceivable make span. Multiple computational examples generated in MATLAB 2019a serve as testament to the efficacy of the proposed strategy. The outcomes are contrasted with the current methods that Johnson, Palmer and NEH have demonstrated.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 2 | Views: 836 | Reviews: 0

 
2.

Heuristics for no-wait flow shop scheduling problem Pages 671-680 Right click to download the paper Download PDF

Authors: Kewal Krishan Nailwal, Deepak Gupta, Kawal Jeet

DOI: 10.5267/j.ijiec.2016.2.005

Keywords: Flow shop scheduling, Makespan, Heuristic, No-wait flowshop

Abstract:
No-wait flow shop scheduling refers to continuous flow of jobs through different machines. The job once started should have the continuous processing through the machines without wait. This situation occurs when there is a lack of an intermediate storage between the processing of jobs on two consecutive machines. The problem of no-wait with the objective of minimizing makespan in flow shop scheduling is NP-hard; therefore the heuristic algorithms are the key to solve the problem with optimal solution or to approach nearer to optimal solution in simple manner. The paper describes two heuristics, one constructive and an improvement heuristic algorithm obtained by modifying the constructive one for sequencing n-jobs through m-machines in a flow shop under no-wait constraint with the objective of minimizing makespan. The efficiency of the proposed heuristic algorithms is tested on 120 Taillard’s benchmark problems found in the literature against the NEH under no-wait and the MNEH heuristic for no-wait flow shop problem. The improvement heuristic outperforms all heuristics on the Taillard’s instances by improving the results of NEH by 27.85%, MNEH by 22.56% and that of the proposed constructive heuristic algorithm by 24.68%. To explain the computational process of the proposed algorithm, numerical illustrations are also given in the paper. Statistical tests of significance are done in order to draw the conclusions.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2016 | Volume: 7 | Issue: 4 | Views: 2799 | Reviews: 0

 

® 2010-2026 GrowingScience.Com