Growing Science » Countries » Iran
Authors: Hossein Rahimi Komijani, Mahdi Shahin, Mohammad bagher Shahin, Armin Jabbarzadeh
DOI: 10.5267/j.dsl.2016.10.002
Keywords: Condition monitoring, Erosion, Random shocks, Complete and incomplete repair
Journal: DSL | Year: 2017 | Volume: 6 | Issue: 2 | Views: 1782 | Reviews: 0
Authors: Seyed Hootan Eskafi, Emad Roghanian, Meisam Jafari-Eskandari
DOI: 10.5267/j.ijiec.2014.12.003
Keywords: Balanced scorecard, Cooperative game theory, Evolutionary game theory, Path analysis, Performance measurement, Shapely value
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 2 | Views: 3228 | Reviews: 0
Authors: Masoud Rabbani, Saeed Elahi, Babak Javadi
DOI: 10.5267/j.dsl.2016.10.001
Keywords: Cellular manufacturing system, assembly line design, Quadratic assignment problem, Feeder cells, Genetic algorithm, Memetic algorithm
Journal: DSL | Year: 2017 | Volume: 6 | Issue: 2 | Views: 1655 | Reviews: 0
Authors: Fatemeh Rezaee, Mostafa Jafari
DOI: 10.5267/j.msl.2015.12.005
Keywords: Banking industry, Dynamic capability, Structural equation modeling, Sustainable competitive advantage
Journal: MSL | Year: 2016 | Volume: 6 | Issue: 2 | Views: 2355 | Reviews: 0
Authors: Farnoush Farajpour, Amir Yousefli
DOI: 10.5267/j.uscm.2017.8.001
Keywords: Supply chain, Information flow, Fuzzy TOPSIS
Journal: USCM | Year: 2018 | Volume: 6 | Issue: 2 | Views: 1761 | Reviews: 0
Authors: Ayad Hendalianpour, Jafar Razmi
Keywords: Customer satisfaction measurement, Fuzzy neural network, Linguistic variable, Fuzzy inference system
Journal: DSL | Year: 2017 | Volume: 6 | Issue: 2 | Views: 2340 | Reviews: 0
Authors: Sarow Saeedi, Mohammad Mohammadi, S.A. Torabi
DOI: 10.5267/j.ijiec.2014.11.002
Keywords: Closed-loop supply chain (CLSC), De Novo programming, Queueing system, Robust programming, TH method
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 2 | Views: 2934 | Reviews: 0
Authors: Amir Saman Kheirkhah, Alireza Ghajari
DOI: 10.5267/j.uscm.2017.7.001
Keywords: Cellular Manufacturing System (CMS), Production Planning (PP), Production line balancing, Backorder, Heuristic algorithm
Journal: USCM | Year: 2018 | Volume: 6 | Issue: 2 | Views: 1415 | Reviews: 0
Authors: Javad Nematian, Mir Ehsan Hesam Sadati
DOI: 10.5267/j.ijiec.2014.10.004
Keywords: Fuzzy random chance-constrained programming, Fuzzy random variable, Possibility theory, Vertex p-center problem
Journal: IJIEC | Year: 2015 | Volume: 6 | Issue: 2 | Views: 1776 | Reviews: 0
Authors: Hamid Rastegar, Behrouz Arbab Shirani, S. Hamid Mirmohammadi, Esmaeil Akhondi Bajegani
DOI: 10.5267/j.jpm.2020.10.003
Keywords: Biding price, Construction projects, Scenario-based model, Robust model
Journal: JPM | Year: 2021 | Volume: 6 | Issue: 1 | Views: 1023 | Reviews: 0
® 2010-2024 GrowingScience.Com