Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)
  • SCI (11)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)

Keywords

Supply chain management(163)
Jordan(161)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
TOPSIS(80)
Job satisfaction(79)
Sustainability(79)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Genetic Algorithm(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2168)
Indonesia(1276)
Jordan(783)
India(780)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(91)
Pakistan(84)
Peru(83)
United Kingdom(78)
Nigeria(77)
Morocco(73)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Factors affecting the competition of an irrigation construction project using state budget funds Pages 171-178 Right click to download the paper Download PDF

Authors: Trong Lam Vu, Ngoc Toan Nguyen, Thi To Phuong Nguyen

DOI: 10.5267/j.jpm.2021.6.001

Keywords: Progress of completing, Irrigation construction project, Vietnam, Project delay, Project Scheduling

Abstract:
The objective of this paper is to evaluate factors affecting the progress of completing construction of irrigation projects using state budget funds. To achieve the goal, to research and conduct surveys of investors, contractors, managers of irrigation construction investment projects. Analysis results from 269 valid questionnaires using SmartPLS 3.6 software showed that all 6 factors: Investor, Peripheral, Capital, Contractors, Consultant, Convenience, all factors have a positive impact on progress of completing irrigation construction projects using state budget funds in Thai Binh province, Vietnam.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 1209 | Reviews: 0

 
2.

Causes of government construction projects’ abandonment Pages 179-190 Right click to download the paper Download PDF

Authors: Isaac Sakyi Damoah, Anthony Ayakwa, Desmond Kwadjo Kumi

DOI: 10.5267/j.jpm.2021.5.004

Keywords: Construction management, Construction sector, Culture, Developing country, Politics

Abstract:
Government construction projects are vital to the economic development of developing countries. However, although most of these projects suffer from abandonment, little evidence exists concerning the causes that account for this setback. This paper investigates the causes of government construction project abandonment in Ghana. We used a sequential data collection approach, in-depth semi-structured interviews, and questionnaire surveys to solicit the views of project management practitioners, contractors, and clients associated with Ghana government construction project implementation. Using factor analysis and structural equation modelling, we find that Ghanaian government construction project abandonment is influenced by five sets of causes: political leadership, culture, external forces, resources (including funding) and administrative/institutional bottlenecks. Three of these sets of causes – political leadership, cultural and external forces, are the primary causes, while resources (including funding) and administrative/institutional causes are secondary causes.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 2847 | Reviews: 0

 
3.

Bibliometric evaluation of research on political risks in construction projects Pages 191-208 Right click to download the paper Download PDF

Authors: Chunling Wei, Xiaopeng Deng, Tengyuan Chang, Amin Mahmoudi, Safi Ullah

DOI: 10.5267/j.jpm.2021.5.003

Keywords: Visual informetrics, Political risk, Web of Science, Overview, Bibliometric evaluation, Construction project

Abstract:
The current study aims to provide an overview of the research on political risk using the Web of Science(WoS)database as well as summarize research results and put forward some suggestions for research directions of political risk in international construction projects. It is the first time scientometric analysis of political risk research is executed. In this regard, the papers related to political risk in the WoS database have been retrieved and the literature is sorted out by visual and content analysis methods. Visual analysis is used to analyze the research overview, knowledge base, and research hotspots of this field. The content analysis method is adopted to expound the current research focus from three perspectives inducing the influence of political risk, risk assessment, and risk management measures. The results show that in the political risk context, the number of publications has experienced an increasing trend in recent years. Based on the existing literature on political risk for all companies, this overview provides some suggestions to address the political risk in international construction projects in the future. The results contribute to the scholars understanding of the research overview, research hotspots, and future research directions of political risk research in construction projects.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 2016 | Reviews: 0

 
4.

Solving open travelling salesman subset-tour problem through a hybrid genetic algorithm Pages 209-222 Right click to download the paper Download PDF

Authors: Purusotham Singamsetty, Jayanth Kumar Thenepalle, Balakrishna Uruturu

DOI: 10.5267/j.jpm.2021.5.002

Keywords: Travelling salesman problem, Open travelling salesman subset-tour problem, Genetic algorithm, Complex mutation

Abstract:
In open travelling salesman subset-tour problem (OTSSP), the salesman needs to traverse a set of k (≤n) out of n cities and after visiting the last city, the salesman does not necessarily return to the central depot. The goal is to minimize the overall traversal distance of covering k cities. The OTSSP model comprises two types of problems such as subset selection and permutation of the cities. Firstly, the problem of selection takes place as the salesman’s tours do not contain all the cities. On the other hand, the next problem is about to determine the optimal sequence of the cities from the selected subset of cities. To deal with this problem efficiently, a hybrid nearest neighbor technique based crossover-free Genetic algorithm (GA) with complex mutation strategies is proposed. To the best of the author’s knowledge, this is the first hybrid GA for the OTSSP. As there are no existing studies on OTSSP yet, benchmark instances are not available for OTSSP. For computational experiments, a set of test instances is created by using TSPLIB. The extensive computational results show that the proposed algorithm is having great potential in achieving better results for the OTSSP. Our proposed GA being the first evolutionary-based algorithm that will help as the baseline for future research on OTSSP.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 1699 | Reviews: 0

 
5.

R-method: A simple ranking method for multi-attribute decision-making in the industrial environment Pages 223-230 Right click to download the paper Download PDF

Authors: Ravipudi Venkata Rao, Jaya Lakshmi

DOI: 10.5267/j.jpm.2021.5.001

Keywords: Multi-attribute decision-making (MADM), Ranking of alternatives, Ranking of attributes, Composite scores

Abstract:
A simple multi-attribute decision-making method based on ranking of alternatives and attributes is proposed in this paper. The method ranks the alternatives with respect to each of the attributes based on the corresponding performance measures. Similarly, the ranks are assigned to the attributes based on their importance as perceived by the decision maker. The ranks assigned to the alternatives with respect to each of the attributes and the ranks assigned to the attributes are converted to appropriate weights and the final composite scores of the alternatives are computed using these weights. An interesting feature of the proposed method is that the qualitative attributes (i.e. the attributes expressed in linguistic terms) need not require the use of fuzzy logic. The proposed method is very simple and useful in situations of limited time availability, presence of qualitative attributes, imprecise/incomplete/partial data, and decision maker’s limited attention and capability to process the information. The proposed method is proved easier and better compared to the other widely used decision-making methods. The proposed method will be tested further on more realistic problems of the industrial environment and the results will be reported soon.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 3311 | Reviews: 0

 
6.

Prioritizing risk events of a large hydroelectric project using fuzzy analytic hierarchy process Pages 107-120 Right click to download the paper Download PDF

Authors: Nehal Elshaboury

DOI: 10.5267/j.jpm.2021.4.002

Keywords: Prioritization, Risk events, Service packs, Hydroelectric project, Fuzzy analytic hierarchy process, Aggregation methods

Abstract:
The existence of hydroelectric plants along Amazon River tributaries is a solution to satisfy the energy demand in Brazil. However, these plants are subjected to multiple risk events because of the geographic and socioeconomic characteristics of this region. In helping to address these escalating challenges, this paper presents a framework that assesses the risk events of service packs relevant to the plant. This framework presents a transparent approach for prioritizing risk events in large projects. The weights of importance of risk events are estimated using the fuzzy analytic hierarchy process. Chang’s extent analysis method takes into consideration the vagueness and imprecision of subjective human judgments. The convergence of decisions is evaluated using two aggregation approaches, namely the maximum-minimum method based on an arithmetic mean and a geometric mean. The performances of the original and modified extent analysis methods are compared using group Euclidean distance and distance between weights metrics. The degree of similarity between the evaluation metrics is examined using Spearman’s rank correlation coefficient and average overlap approaches. Due to the inconsistency of the reported results, the final rankings of the aggregation approaches are determined using a new aggregated multiple criteria decision making method. The results indicate that the original extent analysis method using the maximum-minimum method (arithmetic mean) is the best aggregation method. A Santo Antonio hydroelectric plant in Brazil is used to demonstrate the application of the proposed framework.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 3 | Views: 1128 | Reviews: 0

 
7.

Critical success factors for human resource management of construction project Pages 121-132 Right click to download the paper Download PDF

Authors: Sepideh Leilaee, Javad Rezaeian

DOI: 10.5267/j.jpm.2021.4.001

Keywords: Critical Success Factors, Project Management, Human Resource Management, Multi-criteria decision making

Abstract:
The characterization of project critical success factors is a multidimensional construction that relies upon numerous components. This investigation analyzes the various criteria and components that impact the accomplishment of the tasks in the human resource region of the development project. This examination utilizes a comparative method, the analytic network process method is used to recognize the significant weight of models lastly, the positioning is finished by the Technique for Order of Preference by Similarity to Ideal Solution technique, to analyze 27 critical success factors in the human resource management in project, and thinks about a wide scope of progress rules and basic achievement factors. The outcomes and assessment of specialists illustrate, select increasing trust and certainty among employees and project team managers, and it has the most effect on the accomplishment of Human Resource Management in projects. Contributing to these factors will improve the effectiveness of the activities.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 3 | Views: 1715 | Reviews: 0

 
8.

Impact of project management certification on project performance Pages 133-142 Right click to download the paper Download PDF

Authors: Ahmed Aslam, Atif Bilal

DOI: 10.5267/j.jpm.2021.3.001

Keywords: Project management certification, Project management, Professionalism, Psychological capital, Project performance

Abstract:
In general, certified project management professionals are perceived to enhance project performance. However, this narrative has quite often been challenged in previous literature. We investigate this controversy by including professionalism and psychological capital as intervening variables. The research is based on an empirical survey of certified project managers in the region of Rawalpindi/Islamabad. 373 data samples were collected and further analyzed on the basis of critical success factor theory. The impact of project management certification along with intervening variables were hypothesized and validated to have direct and indirect relationships with project performance. Responses from certified project management professionals in the region of Rawalpindi/Islamabad support the perception but reflect that professionalism plays a supporting role between certification and performance. However, the study dismisses the role of psychological capital between professionalism and performance. We conclude that project management institutes and associations should ensure professionalism in the certification process to actually enhance project performance. The findings contribute to the body of knowledge in predicting improved project management performance by employing certified project managers with strong professional skills. Consequently, the research will help professional institutes to review the conformity of the required professional skills rather than just focusing on just passing an exam.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 3 | Views: 2286 | Reviews: 0

 
9.

Modeling projects interdependencies to measure their synergic impacts on a project portfolio Pages 143-156 Right click to download the paper Download PDF

Authors: Mohammad Mahdi Nabati, Maryam Ashrafi

DOI: 10.5267/j.jpm.2021.2.003

Keywords: Project Interdependencies, Project Portfolio Selection, Resources Interdependency, Knowledge Interdependency, Technical Interdependency

Abstract:
One of the most critical factors used to evaluate the efficiency of the portfolio selection process is the ability of the model to measure interdependencies among projects. Varieties of interactions among projects lead to several kinds of synergies in the whole portfolio, such as re-sources and knowledge interdependencies. There are few studies focused on project portfolio selection accompanied by modeling and estimating the impact of synergies between projects. Hence, this paper presents a model to select the best project portfolio applying a particular model to measure the effects of several types of interdependencies between paired projects. Then, the Promethee II method is used to prioritize projects. Then, the portfolio selection model, which is a non-linear integer model, is solved to find the best set of projects. Finally, numerical examples are addressed to illustrate the method results and validity.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 3 | Views: 1265 | Reviews: 0

 
10.

An investigation into the factors causing international development project failure in developing countries: Focus on Afghanistan Pages 157-170 Right click to download the paper Download PDF

Authors: Nasir Ahmad Shafiei, K. Puttanna

DOI: 10.5267/j.jpm.2021.2.002

Keywords: International Development Projects (IDPs), Failure Factors, Relative Importance Index (RII), Developing countries

Abstract:
This study aims to identify and evaluate the perception of major stakeholders on factors causing International Development Project (IDP) failure in the context of Afghanistan. The study adopts a quantitative cross-sectional survey research design. Thirty significant IDP failure factors included in the questionnaire were identified and shortlisted through literature reviews and validated by experts and IDP management practitioners. The survey was conducted using a structured questionnaire to investigate the most significant IDP failure factors, and various statistical tools were employed to evaluate the perception of the survey respondents. RII was used to examine the relative importance index of each failure factor. The failure factors were then grouped into five categories: Financial constraints, Ineffective recruitment, External forces, Project leadership, and Project management practices using EFA. The findings of the study will help the international development community and their IDP implementing partners, INGs and project management practitioners manage IDPs proactively and mitigate the risks of project failure. It will also contribute to the IDP management body of knowledge. The research is the first of its kind to examine the possible factors causing IDP failure in Afghanistan.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 3 | Views: 3272 | Reviews: 0

 
1 2
Previous Next

® 2010-2025 GrowingScience.Com