Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • Volume 11 (46)
      • Issue 1 (24)
      • Issue 2 (22)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A state-of-art survey on project selection using MCDM techniques Pages 1-10 Right click to download the paper Download PDF

Authors: Soheil Sadi-Nezhad

DOI: 10.5267/j.jpm.2017.6.001

Keywords: Project selection, TOPSIS, AHP, ANP, VIKOR

Abstract:
Project selection is considered as the first essential part of project portfolio management. Project selection is also considered as a process to evaluate each project idea and chooses the one with the biggest priority. Project selection plays an essential role in the entire life cycle of different projects. This paper presents a survey for project selection using multiple criteria decision mak-ing techniques. The study considers 60 papers from over the period 1980-2017. The results of the survey have indicated that integration of Order of Preference by Similarity to Ideal Solution (TOPSIS) and analytical hierarchy process/analytical network process was the most popular techniques for project selection followed by VIKOR method.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 3562 | Reviews: 0

 
2.

Integrated multi-resource planning and scheduling in engineering project Pages 11-26 Right click to download the paper Download PDF

Authors: Samer Ben Issa, Yiliu Tu

DOI: 10.5267/j.jpm.2017.5.003

Keywords: Integrated planning and scheduling process, Resource constrained project scheduling problem (RCPSP), Activities splitting, Minimum Moments of Resources Required (MMORR)

Abstract:
Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR)”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 2217 | Reviews: 0

 
3.

A mathematical model for crashing projects by considering time, cost, quality and risk Pages 27-36 Right click to download the paper Download PDF

Authors: Amin Mahmoudi, Mohammad Reza Feylizadeh

DOI: 10.5267/j.jpm.2017.5.002

Keywords: Crashing, Cost of conformance, Cost of non-conformance, Costs of quality, Risk management, Integer Programming

Abstract:
Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.
Details
  • 68
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 4118 | Reviews: 0

 
4.

Modeling and analyzing the impact of lean principles on organizational performance using ISM approach Pages 37-50 Right click to download the paper Download PDF

Authors: Rajender Kumar, Vikas Kumar, Sultan Singh

DOI: 10.5267/j.jpm.2017.5.001

Keywords: Lean Principles, Wastages, ISM approach, Performance

Abstract:
Existing literature on lean principles reveals the impact of lean principles on the organizational performance. During the past few years, the Indian manufacturing context has been competing with the global competitors directly to sustain their presence. One of the big motivations behind this is the steps taken in favor of replacing the policies and regulations for the manufacturing context by the government of India. In present, the manufacturing context is still far away to get the sustainable market because of customer perception variation i.e. cost, delivery and quality re-lated issues. To overcome the uncertainties based on the attributes i.e. quality, productivity, de-livery etc., almost all the manufacturing units use the basic of lean principle i.e. apply the 5’S. Whereas the heavy industries used the VSM approach especially the automotive product manu-facturers. The work presented in this paper gives an insight on the application of lean principles in the manufacturing context and analyzes the impacts using ISM approach.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 2332 | Reviews: 0

 

® 2010-2026 GrowingScience.Com