How to cite this paper
Leilaee, S & Rezaeian, J. (2021). Critical success factors for human resource management of construction project.Journal of Project Management, 6(3), 121-132.
Refrences
Acharya, V., Pagano, M., & Volpin, P. (2016). Seeking alpha: Excess risk taking and competition for managerial tal-ent. The Review of Financial Studies, 29(10), 2565-2599.
Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative analysis of competencies and recruit-ment signals from job advertisements. Project Management Journal, 44(5), 36-54.
Hoseini, M.Yazdi, H. Yazdi, M. (2015). Identifying and prioritizing key success factors of construction projects with AHP technique (A case study of Shiraz Contractor Company). 3rd International Conference on Applied Research in Civil Engineering, Architecture and Urban Management, Iran.
Amiri, M. P. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert systems with applications, 37(9), 6218-6224.
Ammeter, A. P., & Dukerich, J. M. (2002). Leadership, team building, and team member characteristics in high perfor-mance project teams. Engineering management journal, 14(4), 3-10.
Becker, K., & Smidt, M. (2016). A risk perspective on human resource management: A review and directions for future research. Human Resource Management Review, 26(2), 149-165.
Belassi, W., & Tukel, O. I. (1996). A new framework for determining critical success/failure factors in pro-jects. International journal of project management, 14(3), 141-151.
Bossink, B. A. (2004). Effectiveness of innovation leadership styles: a manager's influence on ecological innovation in construction projects. Construction Innovation, 4(4), 211-228.
Carden, L., Kovach, J. V., & Flores, M. (2020). Enhancing human resource management in process improvement pro-jects. Organizational Dynamics, 100776.
Chan, F. T., & Kumar, N. (2007). Global supplier development considering risk factors using fuzzy extended AHP-based approach. Omega, 35(4), 417-431.
Chang, R. D., Soebarto, V., Zhao, Z. Y., & Zillante, G. (2016). Facilitating the transition to sustainable construction: Chi-na's policies. Journal of Cleaner Production, 131, 534-544.
Cheng, M. I., Dainty, A. R., & Moore, D. R. (2005). What makes a good project manager?. Human resource management journal, 15(1), 25-37.
Chu, T. C., & Lin, Y. C. (2002). Improved extensions of the TOPSIS for group decisionmaking under fuzzy environ-ment. Journal of Information and Optimization Sciences, 23(2), 273-286.
Cooke-Davies, T. (2002). The “real” success factors on projects. International journal of project management, 20(3), 185-190.
Crawford, L. (2000, June). Profiling the competent project manager. In Proceedings of PMI Research Conference (pp. 3-15). Newton Square, PA: Project Management Institute.
Dağdeviren, M., Yavuz, S., & Kılınç, N. (2009). Weapon selection using the AHP and TOPSIS methods under fuzzy envi-ronment. Expert systems with applications, 36(4), 8143-8151.
Dolfi, J., & Andrews, E. J. (2007). The subliminal characteristics of project managers: An exploratory study of optimism overcoming challenge in the project management work environment. International Journal of Project Manage-ment, 25(7), 674-682.
Elkhalifa, A. (2016). The magnitude of barriers facing the development of the construction and building materials indus-tries in developing countries, with special reference to Sudan in Africa. Habitat International, 54, 189-198.
Ertuğrul, İ., & Karakaşoğlu, N. (2009). Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods. Expert Systems with Applications, 36(1), 702-715.
Gan, X., Zuo, J., Ye, K., Skitmore, M., & Xiong, B. (2015). Why sustainable construction? Why not? An owner's perspec-tive. Habitat International, 47, 61-68.
Ghajar, I., & Najafi, A. (2012). Evaluation of harvesting methods for sustainable forest management (SFM) using the ana-lytical network process (ANP). Forest Policy and Economics, 21, 81-91.
Ghoddousi, P., & Hosseini, M. R. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and economic development of economy, 18(1), 99-116.
Giannetti, M. (2011). Serial CEO incentives and the structure of managerial contracts. Journal of Financial Intermedia-tion, 20(4), 633-662.
Grant, R. M. (2016). Contemporary strategy analysis: Text and cases edition. John Wiley & Sons.
Hafezi, F., Faezi, F. (2015). The impact of strategic human resource management on the success of development projects. The first international management conference in the 21st century, Iran.
Huemann, M., Keegan, A., & Turner, J. R. (2007). Human resource management in the project-oriented company: A re-view. International journal of project management, 25(3), 315-323.
Hwang, C.L., Yoon, K. (1981). Multiple Attribute Decision Making: Methods and Applications, a State of the Art Survey. Springer-Verlag, New York.
Ika, L. A. (2009). Project success as a topic in project management journals. Project management journal, 40(4), 6-19.
Ika, L. A., & Hodgson, D. (2014). Learning from international development projects: blending critical project studies and critical development studies. International Journal of Project Management, 32(7), 1182-1196.
Nijkerk. (2006). International Project Management Association, ICB - IPMA Competence Baseline, 3Rd edition, Interna-tional Project Management Association.
Kabak, M., & Dağdeviren, M. (2014). Prioritization of renewable energy sources for Turkey by using a hybrid MCDM methodology. Energy Conversion and Management, 79, 25-33.
Keegan, A., Ringhofer, C., & Huemann, M. (2018). Human resource management and project based organizing: Fertile ground, missed opportunities and prospects for closer connections. International Journal of Project Manage-ment, 36(1), 121-133.
Ketelhöhn, W. (1998). What is a key success factor?. European Management Journal, 16(3), 335-340.
Lehtonen, P., & Martinsuo, M. (2006). Three ways to fail in project management and the role of project management methodology. Project Perspectives, 28(1), 6-11.
Liang, R. X., Wang, J. Q., & Zhang, H. Y. (2018). Projection-based PROMETHEE methods based on hesitant fuzzy lin-guistic term sets. International Journal of Fuzzy Systems, 20(7), 2161-2174.
Lehtiranta, L., Kärnä, S., Junnonen, J. M., & Julin, P. (2012). The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), 463-475.
Junior, F. R. L., Osiro, L., & Carpinetti, L. C. R. (2014). A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Applied Soft Computing, 21, 194-209.
Liu, J., Xu, F., & Lin, S. (2017). Site selection of photovoltaic power plants in a value chain based on grey cumulative prospect theory for sustainability: A case study in Northwest China. Journal of Cleaner Production, 148, 386-397.
Mahdevari, S., Shahriar, K., & Esfahanipour, A. (2014). Human health and safety risks management in underground coal mines using fuzzy TOPSIS. Science of the Total Environment, 488, 85-99.
Mahdevari, S., Shahriar, K., & Esfahanipour, A. (2014). Human health and safety risks management in underground coal mines using fuzzy TOPSIS. Science of the Total Environment, 488, 85-99.
Morris, P. W. (2011). A brief history of project management. In The Oxford handbook of project management.
Najafinasab, F., Karbassi, A. R., & Ghoddousi, J. (2015). Fuzzy analytic network process approach to evaluate land and sea criteria for land use planning in coastal areas. Ocean & Coastal Management, 116, 368-381.
Nieminen, A., & Lehtonen, M. (2008). Organisational control in programme teams: An empirical study in change pro-gramme context. International Journal of Project Management, 26(1), 63-72.
Onu, U. P., Xie, Q., & Xu, L. (2017). A fuzzy TOPSIS model framework for ranking sustainable water supply alterna-tives. Water Resources Management, 31(9), 2579-2593.
Othman, E., & Ahmed, A. (2013). Challenges of mega construction projects in developing countries. Organization, tech-nology & management in construction: an international journal, 5(1), 730-746.
Pade, C., Mallinson, B., & Sewry, D. (2008). An elaboration of critical success factors for rural ICT project sustainability in developing countries: Exploring the Dwesa case. Journal of Information Technology Case and Application Re-search, 10(4), 32-55.
Rockart, J. F. (1980). The changing role of the information systems executive: a critical success factors perspective.
Rubin, I. M., & Seelig, W. (1967). Experience as a factor in the selection and performance of project managers. IEEE Transactions on Engineering Management, 3, 131-135.
Sakthivel, G., Ilangkumaran, M., & Gaikwad, A. (2015). A hybrid multi-criteria decision modeling approach for the best biodiesel blend selection based on ANP-TOPSIS analysis. Ain Shams Engineering Journal, 6(1), 239-256.
Samolejová, A., Wicher, P., Lampa, M., Lenort, R., Kutáč, J., & Sikorová, A. (2015). Factors of human resource planning in metallurgical company. Metalurgija, 54(1), 243-246.
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical success factors for construction pro-jects. Journal of construction engineering and management, 118(1), 94-111.
Şengül, Ü., Eren, M., Shiraz, S. E., Gezder, V., & Şengül, A. B. (2015). Fuzzy TOPSIS method for ranking renewable en-ergy supply systems in Turkey. Renewable energy, 75, 617-625.
Shenhar, J. A., & Dvir, D. (2007). Reinventing Project Management, Harvard Business School Press.
Shyur, H. J., & Shih, H. S. (2006). A hybrid MCDM model for strategic vendor selection. Mathematical and computer modelling, 44(7-8), 749-761.
Silvius, A. J., & Schipper, R. P. (2014). Sustainability in project management: A literature review and impact analy-sis. Social Business, 4(1), 63-96.
Silvius, A. J., & Schipper, R. P. (2014). Sustainability in project management: A literature review and impact analy-sis. Social Business, 4(1), 63-96.
Su, C. M., Horng, D. J., Tseng, M. L., Chiu, A. S., Wu, K. J., & Chen, H. P. (2016). Improving sustainable supply chain management using a novel hierarchical grey-DEMATEL approach. Journal of Cleaner Production, 134, 469-481.
Sydow, J., Lindkvist, L., & DeFillippi, R. (2004). Project-based organizations, embeddedness and repositories of knowledge.
Thomson, A., Strickland, A. J., & Gamble, J. E. (2001). Crafting and executing strategy. New York: McGraw-Hill, 99, 100.
Turner, J. R., & Müller, R. (2005). The project manager's leadership style as a success factor on projects: A literature re-view. Project management journal, 36(2), 49-61.
Van Marrewijk, A., Clegg, S. R., Pitsis, T. S., & Veenswijk, M. (2008). Managing public–private megaprojects: Paradox-es, complexity, and project design. International journal of project management, 26(6), 591-600.
Wang, L., Zhang, H. Y., Wang, J. Q., & Li, L. (2018). Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project. Applied Soft Computing, 64, 216-226.
Wang, J., Liu, S. Y., & Zhang, J. (2005). An extension of TOPSIS for fuzzy MCDM based on vague set theory. Journal of systems science and systems engineering, 14(1), 73-84.
Wang, J. J., & Yang, D. L. (2007). Using a hybrid multi-criteria decision aid method for information systems outsourc-ing. Computers & Operations Research, 34(12), 3691-3700.
Wang, T. C., & Chang, T. H. (2007). Application of TOPSIS in evaluating initial training aircraft under a fuzzy environ-ment. Expert Systems with Applications, 33(4), 870-880.
Wang, Y. M., & Elhag, T. M. (2006). Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment. Expert systems with applications, 31(2), 309-319.
Wu, C. S., Lin, C. T., & Lee, C. (2010). Optimal marketing strategy: A decision-making with ANP and TOP-SIS. International Journal of Production Economics, 127(1), 190-196.
Yang, Y. Q., Wang, S. Q., Dulaimi, M., & Low, S. P. (2003). A fuzzy quality function deployment system for buildable design decision-makings. Automation in construction, 12(4), 381-393.
Yeo, K. T. (1995). Planning and learning in major infrastructure development: systems perspectives. International Jour-nal of Project Management, 13(5), 287-293.
Zhang, Y., & Han, Q. (2017). Development of electric vehicles for China’s power generation portfolio: A regional eco-nomic and environmental analysis. Journal of Cleaner Production, 162, 71-85.
Zhang, L., & Fan, W. (2013). Improving performance of construction projects. Engineering, Construction and Architec-tural Management.
Zhang, X., Wu, Y., Shen, L., & Skitmore, M. (2014). A prototype system dynamic model for assessing the sustainability of construction projects. International Journal of Project Management, 32(1), 66-76.
Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative analysis of competencies and recruit-ment signals from job advertisements. Project Management Journal, 44(5), 36-54.
Hoseini, M.Yazdi, H. Yazdi, M. (2015). Identifying and prioritizing key success factors of construction projects with AHP technique (A case study of Shiraz Contractor Company). 3rd International Conference on Applied Research in Civil Engineering, Architecture and Urban Management, Iran.
Amiri, M. P. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert systems with applications, 37(9), 6218-6224.
Ammeter, A. P., & Dukerich, J. M. (2002). Leadership, team building, and team member characteristics in high perfor-mance project teams. Engineering management journal, 14(4), 3-10.
Becker, K., & Smidt, M. (2016). A risk perspective on human resource management: A review and directions for future research. Human Resource Management Review, 26(2), 149-165.
Belassi, W., & Tukel, O. I. (1996). A new framework for determining critical success/failure factors in pro-jects. International journal of project management, 14(3), 141-151.
Bossink, B. A. (2004). Effectiveness of innovation leadership styles: a manager's influence on ecological innovation in construction projects. Construction Innovation, 4(4), 211-228.
Carden, L., Kovach, J. V., & Flores, M. (2020). Enhancing human resource management in process improvement pro-jects. Organizational Dynamics, 100776.
Chan, F. T., & Kumar, N. (2007). Global supplier development considering risk factors using fuzzy extended AHP-based approach. Omega, 35(4), 417-431.
Chang, R. D., Soebarto, V., Zhao, Z. Y., & Zillante, G. (2016). Facilitating the transition to sustainable construction: Chi-na's policies. Journal of Cleaner Production, 131, 534-544.
Cheng, M. I., Dainty, A. R., & Moore, D. R. (2005). What makes a good project manager?. Human resource management journal, 15(1), 25-37.
Chu, T. C., & Lin, Y. C. (2002). Improved extensions of the TOPSIS for group decisionmaking under fuzzy environ-ment. Journal of Information and Optimization Sciences, 23(2), 273-286.
Cooke-Davies, T. (2002). The “real” success factors on projects. International journal of project management, 20(3), 185-190.
Crawford, L. (2000, June). Profiling the competent project manager. In Proceedings of PMI Research Conference (pp. 3-15). Newton Square, PA: Project Management Institute.
Dağdeviren, M., Yavuz, S., & Kılınç, N. (2009). Weapon selection using the AHP and TOPSIS methods under fuzzy envi-ronment. Expert systems with applications, 36(4), 8143-8151.
Dolfi, J., & Andrews, E. J. (2007). The subliminal characteristics of project managers: An exploratory study of optimism overcoming challenge in the project management work environment. International Journal of Project Manage-ment, 25(7), 674-682.
Elkhalifa, A. (2016). The magnitude of barriers facing the development of the construction and building materials indus-tries in developing countries, with special reference to Sudan in Africa. Habitat International, 54, 189-198.
Ertuğrul, İ., & Karakaşoğlu, N. (2009). Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods. Expert Systems with Applications, 36(1), 702-715.
Gan, X., Zuo, J., Ye, K., Skitmore, M., & Xiong, B. (2015). Why sustainable construction? Why not? An owner's perspec-tive. Habitat International, 47, 61-68.
Ghajar, I., & Najafi, A. (2012). Evaluation of harvesting methods for sustainable forest management (SFM) using the ana-lytical network process (ANP). Forest Policy and Economics, 21, 81-91.
Ghoddousi, P., & Hosseini, M. R. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and economic development of economy, 18(1), 99-116.
Giannetti, M. (2011). Serial CEO incentives and the structure of managerial contracts. Journal of Financial Intermedia-tion, 20(4), 633-662.
Grant, R. M. (2016). Contemporary strategy analysis: Text and cases edition. John Wiley & Sons.
Hafezi, F., Faezi, F. (2015). The impact of strategic human resource management on the success of development projects. The first international management conference in the 21st century, Iran.
Huemann, M., Keegan, A., & Turner, J. R. (2007). Human resource management in the project-oriented company: A re-view. International journal of project management, 25(3), 315-323.
Hwang, C.L., Yoon, K. (1981). Multiple Attribute Decision Making: Methods and Applications, a State of the Art Survey. Springer-Verlag, New York.
Ika, L. A. (2009). Project success as a topic in project management journals. Project management journal, 40(4), 6-19.
Ika, L. A., & Hodgson, D. (2014). Learning from international development projects: blending critical project studies and critical development studies. International Journal of Project Management, 32(7), 1182-1196.
Nijkerk. (2006). International Project Management Association, ICB - IPMA Competence Baseline, 3Rd edition, Interna-tional Project Management Association.
Kabak, M., & Dağdeviren, M. (2014). Prioritization of renewable energy sources for Turkey by using a hybrid MCDM methodology. Energy Conversion and Management, 79, 25-33.
Keegan, A., Ringhofer, C., & Huemann, M. (2018). Human resource management and project based organizing: Fertile ground, missed opportunities and prospects for closer connections. International Journal of Project Manage-ment, 36(1), 121-133.
Ketelhöhn, W. (1998). What is a key success factor?. European Management Journal, 16(3), 335-340.
Lehtonen, P., & Martinsuo, M. (2006). Three ways to fail in project management and the role of project management methodology. Project Perspectives, 28(1), 6-11.
Liang, R. X., Wang, J. Q., & Zhang, H. Y. (2018). Projection-based PROMETHEE methods based on hesitant fuzzy lin-guistic term sets. International Journal of Fuzzy Systems, 20(7), 2161-2174.
Lehtiranta, L., Kärnä, S., Junnonen, J. M., & Julin, P. (2012). The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), 463-475.
Junior, F. R. L., Osiro, L., & Carpinetti, L. C. R. (2014). A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Applied Soft Computing, 21, 194-209.
Liu, J., Xu, F., & Lin, S. (2017). Site selection of photovoltaic power plants in a value chain based on grey cumulative prospect theory for sustainability: A case study in Northwest China. Journal of Cleaner Production, 148, 386-397.
Mahdevari, S., Shahriar, K., & Esfahanipour, A. (2014). Human health and safety risks management in underground coal mines using fuzzy TOPSIS. Science of the Total Environment, 488, 85-99.
Mahdevari, S., Shahriar, K., & Esfahanipour, A. (2014). Human health and safety risks management in underground coal mines using fuzzy TOPSIS. Science of the Total Environment, 488, 85-99.
Morris, P. W. (2011). A brief history of project management. In The Oxford handbook of project management.
Najafinasab, F., Karbassi, A. R., & Ghoddousi, J. (2015). Fuzzy analytic network process approach to evaluate land and sea criteria for land use planning in coastal areas. Ocean & Coastal Management, 116, 368-381.
Nieminen, A., & Lehtonen, M. (2008). Organisational control in programme teams: An empirical study in change pro-gramme context. International Journal of Project Management, 26(1), 63-72.
Onu, U. P., Xie, Q., & Xu, L. (2017). A fuzzy TOPSIS model framework for ranking sustainable water supply alterna-tives. Water Resources Management, 31(9), 2579-2593.
Othman, E., & Ahmed, A. (2013). Challenges of mega construction projects in developing countries. Organization, tech-nology & management in construction: an international journal, 5(1), 730-746.
Pade, C., Mallinson, B., & Sewry, D. (2008). An elaboration of critical success factors for rural ICT project sustainability in developing countries: Exploring the Dwesa case. Journal of Information Technology Case and Application Re-search, 10(4), 32-55.
Rockart, J. F. (1980). The changing role of the information systems executive: a critical success factors perspective.
Rubin, I. M., & Seelig, W. (1967). Experience as a factor in the selection and performance of project managers. IEEE Transactions on Engineering Management, 3, 131-135.
Sakthivel, G., Ilangkumaran, M., & Gaikwad, A. (2015). A hybrid multi-criteria decision modeling approach for the best biodiesel blend selection based on ANP-TOPSIS analysis. Ain Shams Engineering Journal, 6(1), 239-256.
Samolejová, A., Wicher, P., Lampa, M., Lenort, R., Kutáč, J., & Sikorová, A. (2015). Factors of human resource planning in metallurgical company. Metalurgija, 54(1), 243-246.
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical success factors for construction pro-jects. Journal of construction engineering and management, 118(1), 94-111.
Şengül, Ü., Eren, M., Shiraz, S. E., Gezder, V., & Şengül, A. B. (2015). Fuzzy TOPSIS method for ranking renewable en-ergy supply systems in Turkey. Renewable energy, 75, 617-625.
Shenhar, J. A., & Dvir, D. (2007). Reinventing Project Management, Harvard Business School Press.
Shyur, H. J., & Shih, H. S. (2006). A hybrid MCDM model for strategic vendor selection. Mathematical and computer modelling, 44(7-8), 749-761.
Silvius, A. J., & Schipper, R. P. (2014). Sustainability in project management: A literature review and impact analy-sis. Social Business, 4(1), 63-96.
Silvius, A. J., & Schipper, R. P. (2014). Sustainability in project management: A literature review and impact analy-sis. Social Business, 4(1), 63-96.
Su, C. M., Horng, D. J., Tseng, M. L., Chiu, A. S., Wu, K. J., & Chen, H. P. (2016). Improving sustainable supply chain management using a novel hierarchical grey-DEMATEL approach. Journal of Cleaner Production, 134, 469-481.
Sydow, J., Lindkvist, L., & DeFillippi, R. (2004). Project-based organizations, embeddedness and repositories of knowledge.
Thomson, A., Strickland, A. J., & Gamble, J. E. (2001). Crafting and executing strategy. New York: McGraw-Hill, 99, 100.
Turner, J. R., & Müller, R. (2005). The project manager's leadership style as a success factor on projects: A literature re-view. Project management journal, 36(2), 49-61.
Van Marrewijk, A., Clegg, S. R., Pitsis, T. S., & Veenswijk, M. (2008). Managing public–private megaprojects: Paradox-es, complexity, and project design. International journal of project management, 26(6), 591-600.
Wang, L., Zhang, H. Y., Wang, J. Q., & Li, L. (2018). Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project. Applied Soft Computing, 64, 216-226.
Wang, J., Liu, S. Y., & Zhang, J. (2005). An extension of TOPSIS for fuzzy MCDM based on vague set theory. Journal of systems science and systems engineering, 14(1), 73-84.
Wang, J. J., & Yang, D. L. (2007). Using a hybrid multi-criteria decision aid method for information systems outsourc-ing. Computers & Operations Research, 34(12), 3691-3700.
Wang, T. C., & Chang, T. H. (2007). Application of TOPSIS in evaluating initial training aircraft under a fuzzy environ-ment. Expert Systems with Applications, 33(4), 870-880.
Wang, Y. M., & Elhag, T. M. (2006). Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment. Expert systems with applications, 31(2), 309-319.
Wu, C. S., Lin, C. T., & Lee, C. (2010). Optimal marketing strategy: A decision-making with ANP and TOP-SIS. International Journal of Production Economics, 127(1), 190-196.
Yang, Y. Q., Wang, S. Q., Dulaimi, M., & Low, S. P. (2003). A fuzzy quality function deployment system for buildable design decision-makings. Automation in construction, 12(4), 381-393.
Yeo, K. T. (1995). Planning and learning in major infrastructure development: systems perspectives. International Jour-nal of Project Management, 13(5), 287-293.
Zhang, Y., & Han, Q. (2017). Development of electric vehicles for China’s power generation portfolio: A regional eco-nomic and environmental analysis. Journal of Cleaner Production, 162, 71-85.
Zhang, L., & Fan, W. (2013). Improving performance of construction projects. Engineering, Construction and Architec-tural Management.
Zhang, X., Wu, Y., Shen, L., & Skitmore, M. (2014). A prototype system dynamic model for assessing the sustainability of construction projects. International Journal of Project Management, 32(1), 66-76.