Processing, Please wait...

  • Publisher Home
  • Home
  • ๐Ÿ”™ Back
  • ๐Ÿ“š Journals
    • โš™๏ธ IJIEC - Industrial Engineering Computations
    • ๐ŸŒ IJDNS - Data and Network Science
    • ๐Ÿงช CCL - Current Chemistry Letters
    • ๐Ÿ’น AC - Accounting
    • ๐ŸŽฏ DSL - Decision Science Letters
    • ๐Ÿš› USCM - Uncertain Supply Chain Management
    • ๐Ÿ—๏ธ JPM - Journal of Project Management
    • ๐Ÿฅ HE - Healthcare Engineering
    • ๐Ÿ“ˆ SCI - Scientometrica
    • ๐Ÿ”ฉ ESM - Engineering Solid Mechanics
    • ๐ŸŒฟ JFS - Journal of Future Sustainability
    • ๐Ÿ’ผ MSL - Management Science Letters
  • ๐Ÿ“ Submit Article
  • ๐Ÿ“Š Statistics
  • ๐Ÿ“‹ About
    • ๐Ÿ“„ About Us
    • ๐Ÿ“ฐ Blog
    • ๐Ÿ“ข News
    • ๐Ÿ“ง Contact
  • ๐Ÿ“บ Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Construction project

โญ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (101)
  • MSL (2658)
  • USCM (1104)
  • HE (51)
  • SCI (52)

๐Ÿ”‘ Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(93)
optimization(88)
Financial performance(86)
Trust(85)
TOPSIS(85)
Job satisfaction(81)
Genetic Algorithm(81)
Organizational performance(81)
Social media(80)


» Show all keywords

โœ๏ธ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

๐ŸŒ Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (8)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: ๐Ÿ“– Volume | ๐Ÿ“… Date | โญ Most Rates | ๐Ÿ‘๏ธ Most Views | ๐Ÿš€ Rising Stars | ๐Ÿ”— Citations (Scopus) | ๐Ÿ”ฅ Hot Papers
1.

Bibliometric evaluation of research on political risks in construction projects Pages 191-208 PDF Download PDF

Authors: Chunling Wei, Xiaopeng Deng, Tengyuan Chang, Amin Mahmoudi, Safi Ullah

doi 10.5267/j.jpm.2021.5.003

๐Ÿ”‘ Keywords: Visual informetrics, Political risk, Web of Science, Overview, Bibliometric evaluation, Construction project

Abstract:
The current study aims to provide an overview of the research on political risk using the Web of Science๏ผˆWoS๏ผ‰database as well as summarize research results and put forward some suggestions for research directions of political risk in international construction projects. It is the first time scientometric analysis of political risk research is executed. In this regard, the papers related to political risk in the WoS database have been retrieved and the literature is sorted out by visual and content analysis methods. Visual analysis is used to analyze the research overview, knowledge base, and research hotspots of this field. The content analysis method is adopted to expound the current research focus from three perspectives inducing the influence of political risk, risk assessment, and risk management measures. The results show that in the political risk context, the number of publications has experienced an increasing trend in recent years. Based on the existing literature on political risk for all companies, this overview provides some suggestions to address the political risk in international construction projects in the future. The results contribute to the scholars understanding of the research overview, research hotspots, and future research directions of political risk research in construction projects.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 2935

 
2.

Diagnosing the success of the construction projects during the initial phases Pages 395-406 PDF Download PDF

Authors: Mostafa Ghazimoradi, Ali Kheyroddin, Omid Rezayfar

doi 10.5267/j.dsl.2016.2.002

๐Ÿ”‘ Keywords: Anticipation of success, Construction project, Criterion, Factor, Initial phase, Neural networks

Abstract:
As construction projects are becoming more deployed and more complicated at the same time, having an instrument for anticipation of success has become a primary requirement for every stakeholder. On this basis, several models have been introduced which implement different methods for anticipation of the entire goals or a series of goals of projects. In this research, at the first step, 16 criteria as instruments of anticipation of success and 33 factors as required instruments for obtaining success were extracted through library studies, semi-structured interviews and the Delphi method. At the next step, by having 169 questionnaires filled by senior managers of construction projects, the importance and priority of each of these 16 criteria and 33 factors for the initial phases of projects were determined according to Iranโ€™s local conditions. Ultimately, through modeling of data by a propagation neural network including 35 hidden layers, the anticipator model for success of construction projects during their initial phases was developed with Performance and Regression. This model is able to anticipate the level of realization of projectsโ€™ success criteria according to the level of realization of success factors at the initial phase.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2016 | Volume: 5 | Issue: 3 | Views: 3019

 
3.

Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman Pages 87-102 PDF Download PDF

Authors: Tariq Al Amri, Manuel Marey-Pรฉrez

doi 10.5267/j.jpm.2020.1.001

๐Ÿ”‘ Keywords: Construction project, Time delay, Cost overrun, Oman

Abstract:
Every nation in the globe endeavours to achieve sustainable growth in its various industries. The construction industry has an enormous contribution to the economy primarily for the developed nations experiencing urgent demands to develop and expand their infrastructure. While this expansion is taking place through projects, it is essential to find the factors affecting completion of project premium. This paper investigates the main time delay and cost overrun causes in construction projects within Oman related to clients, contractors, and consultants. Through a comprehensive literature review, reasons for delays and cost overrun are determined and a survey targeting 100 project managers was conducted to indicate top causes among them. The findings may help the government develop better policy and construction firms to modify criteria procedures to avoid such drawbacks.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2020 | Volume: 5 | Issue: 2 | Views: 7802

 
4.

A review on weaknesses and strengths of delivering Mehr housing project in terms of achieving economical goals Pages 2521-2530 PDF Download PDF

Authors: Ali Karshenasan, Mahsa Beiranvand

doi 10.5267/j.msl.2013.08.010

๐Ÿ”‘ Keywords: Construction project, Economic assessment, Mehr housing project, Weaknesses and strengths of delivering

Abstract:
Housing is one of the most important sections of development in a country and its economic importance has put it in the center of attention. It can cause rise and depression of habitation by its extended economic aspects. Mehr Housing plan is a state run housing project in most cities started 2007 in Iran to protect and provide cheap housing for poor people and young couples. Mehr housing project by its large scale and wide dimensions can affect the societyโ€™s economy. Therefore, to investigate weaknesses and strengths of this project in terms of economic and applying necessary reformation can increase the success probability of this project. For this purpose, this study assess the weaknesses and strengths of Mehr housing of province of Khorram Abad in Iran for achieving economic goals and also presents solutions to better access to these goals. Time scope of the present study is 6 months of 2011 and the second 3 months of 2012. The methodology is applicable in terms of goal and is descriptive survey in terms of nature. In this study, a combined method of interviewing to experts and distributing a questionnaire among the applicants of Mehr housing has been used for data collecting. Among strengths of Khorram Abad in economic section, employment and urban landfill pattern reformation can be implied. In addition, among weaknesses of this project are lack of proper first design and technical justification of the project and use of only 2 shabby fabrics.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2013 | Volume: 3 | Issue: 9 | Views: 2943

 

® 2010-2026 GrowingScience.Com