Growing Science » Countries » Taiwan
Authors: Yuan-Shyi P. Chiu, Jian-Hua Lian, Victoria Chiu, Yunsen Wang, Hsiao-Chun Wu
DOI: 10.5267/j.ijiec.2021.9.003
Keywords: Mathematical modelling, Multiproduct fabrication, External supplier, Overtime, Scrap, Postponement, Rotation cycle, Batch production
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 1 | Views: 1311 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Tiffany Chiu, Fan-Yun Pai, Hua Yao Wu
DOI: 10.5267/j.ijiec.2021.5.001
Keywords: Producer-retailer incorporated problem, Multi-item EPQ model, Expedited rate, Delayed differentiation, Random scrap, Multi-delivery
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 4 | Views: 1044 | Reviews: 0
Authors: Singa Wang Chiu, Hua-Yao Wu, Tsu-Ming Yeh, Yunsen Wang
DOI: 10.5267/j.ijiec.2021.4.001
Keywords: Hybrid economic production quantity, Poisson-distributed breakdown, Random scrap, Rework, Outsourcing, Production planning
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 3 | Views: 1061 | Reviews: 0
Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2021.1.001
Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 2 | Views: 1361 | Reviews: 0
Authors: Venkateswarlu Nalluri, Thao-Trang Huynh-Cam, Hanumantha Rao Sama, Long-Sheng Chen
Keywords: E-service, E-service adoption, Decision-making model, Fuzzy DEMATEL, Fuzzy TOPSIS, Educational organizations
Journal: DSL | Year: 2023 | Volume: 12 | Issue: 2 | Views: 805 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Huei-Hsin Chang, Tiffany Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2020.9.003
Keywords: Multi-item manufacturing, Outsourcing, Delayed differentiation, Rework, Scrap, Batch fabrication
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 1 | Views: 1145 | Reviews: 0
Authors: Singa Wang Chiu, Liang-Wei You, Peng-Cheng Sung, Yunsen Wang
DOI: 10.5267/j.ijiec.2020.6.002
Keywords: Production runtime, Stochastic breakdown, Accelerated manufacturing rate, Repairable items, Multi-delivery plan
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1045 | Reviews: 0
Authors: Hong-Dar Lin, Tung-Hsin Lee, Chou-Hsien Lin, Yuan-Shyi Peter Chiu
Keywords: Quality inspection, Grade judgment, Fabrication of spectacle lenses, Distortion defect, Exponentially weighted moving average method, Fuzzy inference model
Journal: DSL | Year: 2022 | Volume: 11 | Issue: 4 | Views: 869 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Victoria Chiu, Yunsen Wang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2020.6.001
Keywords: Multiproduct replenishment decision, Postponement, Overtime, Product quality reassurance, Commonality, Common cycle time
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1557 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Singa Wang Chiu, Tiffany Chiu, Hui-Chi Wang
Keywords: Optimization, Manufacturing system, Machine failures, Runtime, Rework, Expedited-rate, External source
Journal: DSL | Year: 2022 | Volume: 11 | Issue: 4 | Views: 656 | Reviews: 0
® 2010-2024 GrowingScience.Com