Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Multi-item manufacturing

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance Pages 63-78 Right click to download the paper Download PDF

Authors: Yuan-Shyi Peter Chiu, Huei-Hsin Chang, Tiffany Chiu, Singa Wang Chiu

DOI: 10.5267/j.ijiec.2020.9.003

Keywords: Multi-item manufacturing, Outsourcing, Delayed differentiation, Rework, Scrap, Batch fabrication

Abstract:
Variety, quality, and rapid response are becoming a trend in customer requirements in the contemporary competitive markets. Thus, an increasing number of manufacturers are frequently seeking alternatives such as redesigning their fabrication scheme and outsourcing strategy to meet the client’s expectations effectively with minimum operating costs and limited in-house capacity. Inspired by the potential benefits of delay differentiation, outsourcing, and quality assurance policies in the multi-item production planning, this study explores a single-machine two-stage multi-item batch fabrication problem considering the abovementioned features. Stage one is the fabrication of all the required common parts, and stage two is manufacturing the end products. A predetermined portion of common parts is supplied by an external contractor to reduce the uptime of stage one. Both stages have imperfect in-house production processes. The defective items produced are identified, and they are either reworked or removed to ensure the quality of the finished batch. We develop a model to depict the problem explicitly. Modeling, formulation, derivation, and optimization methods assist us in deriving a cost-minimized cycle time solution. Moreover, the proposed model can analyze and expose the diverse features of the problem to help managerial decision-making. An example of this is the individual/ collective influence of postponement, outsourcing, and quality reassurance policies on the optimal cycle time solution, utilization, uptime of each stage, total system cost, and individual cost contributors.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 1 | Views: 1438 | Reviews: 0

 

® 2010-2026 GrowingScience.Com