Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Hsiao-Chun Wu

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

The joint influence of quality assurance and postponement on a hybrid multi-item manufacturing-delivery decision-making Pages 821-836 Right click to download the paper Download PDF

Authors: Yuan-Shyi P. Chiu, Hung-Yi Chen, Victoria Chiu, Singa Wang Chiu, Hsiao-Chun Wu

DOI: 10.5267/j.ijiec.2023.6.002

Keywords: Multi-item manufacturing-delivery, Postponement, Subcontracting, Quality assurance, Supply-chain, Multiple deliveries

Abstract:
The present research explores the collective influence of quality assurance and postponement on a hybrid multiproduct replenishing-delivery decision-making. Assume the required multiproduct has a standard (common) component, and our replenishing-delivery model has incorporated a two-phase postponement strategy. The first phase makes all standard components and hires an external supplier to partially provide the required parts to cut short the needed uptime. In contrast, the second phase fabricates the finished multiproduct in sequence. To ensure the desired merchandise quality, we apply a quality-assurance action to the in-house processes to screen and remove scrap items and rework the repairable defects in both stages. Upon completing each merchandise, these products are transported to the customer in n fixed-quantity shipment in fixed-time intervals. We employ math modeling and formulating approaches to gain the overall supply-chain operating expenses comprising subcontracting, fabricating, stock holding, transportation, and customer holding costs. By minimizing system operating expenses, this research determines the optimal replenishing-delivery policy. Lastly, we give a numerical example to demonstrate our study’s applicability and usefulness/capability for facilitating managerial decision-making.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 4 | Views: 947 | Reviews: 0

 
2.

Mathematical modeling for a multiproduct manufacturing system featuring postponement, external suppliers, overtime, and scrap Pages 1-12 Right click to download the paper Download PDF

Authors: Yuan-Shyi P. Chiu, Jian-Hua Lian, Victoria Chiu, Yunsen Wang, Hsiao-Chun Wu

DOI: 10.5267/j.ijiec.2021.9.003

Keywords: Mathematical modelling, Multiproduct fabrication, External supplier, Overtime, Scrap, Postponement, Rotation cycle, Batch production

Abstract:
Manufacturing firms operating in today’s competitive global markets must continuously find the appropriate manufacturing scheme and strategies to effectively meet customer needs for various types of quality of merchandise under the constraints of short order lead-time and limited in-house capacity. Inspired by the offering of a decision-making model to aid smooth manufacturers’ operations, this study builds an analytical model to expose the influence of the outsourcing of common parts, postponement policies, overtime options, and random scrapped items on the optimal replenishment decision and various crucial system performance indices of the multiproduct problem. A two-stage fabrication scheme is presented to handle the products’ commonality and the uptime-reduced strategies to satisfy the short amount of time before the due dates of customers’ orders. A screening process helps identify and remove faulty items to ensure the finished lot’s anticipated quality. Mathematical derivation assists us in finding the manufacturing relevant total cost function. The differential calculus helps optimize the cost function and determine the optimal stock-replenishing rotation cycle policy. Lastly, a simulated numerical illustration helps validate our research result’s applicability and demonstrate the model’s capability to disclose the crucial managerial insights and facilitate manufacturing-relevant decision making.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 1 | Views: 1607 | Reviews: 0

 
3.

Exploring the difficulties in learning ERP systems from students’ perspective: The case of Oracle E-Business Suite ERP Pages 1201-1214 Right click to download the paper Download PDF

Authors: Hung-Yi Chen, Yueh-Chin Chen, Hsiao-Chun Wu, Tiffany Chiu

DOI: 10.5267/j.ijdns.2022.6.013

Keywords: ERP user training, Difficulties in learning ERP, Higher education

Abstract:
This study explores and analyzes students’ difficulties in learning an ERP system to help design more appropriate teaching methods and materials. Global enterprises have widely used ERP systems to manage their operations effectively and efficiently. Hence, many business schools have offered courses on ERP systems to sharpen ERP skills for their students. To help design more appropriate teaching methods and materials for ERP learning, one must know students’ difficulties in understanding. This study analyzes students’ difficulties in learning the Oracle E-Business Suite ERP system through interviews and qualitative analysis. As a result, this study identifies five categories of problems in the various areas of the Revised Bloom’s Taxonomy. Their relevant educational objectives can guide the redesign of ERP teaching methods and materials. One of the difficulties belongs to the area of Remember Factual Knowledge. The rest of them are in Understand, Remember, Apply, and Analysis of Procedural Knowledge. Lastly, this study provides some implications for teaching ERP.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJDS | Year: 2022 | Volume: 6 | Issue: 4 | Views: 1735 | Reviews: 0

 

® 2010-2026 GrowingScience.Com