Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 12 Issue 2 pp. 143-158, 2021

A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance Pages 143-158 PDF Download PDF

Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu

📋 Author Affiliations:
Singa Wang Chiu1, Victoria Chiu2, Ming-Hon Hwang3, Yuan-Shyi Peter Chiu4
1 Department of Business Administration, Chaoyang University of Technology, Taichung, 413, Taiwan, N/A
2 Department of Accounting, Finance and Law, The State University of New York, Oswego, 13126, NY, United States, N/A
3 Department of Marketing & Logistics Management, Chaoyang University of Technology, Taiwan, N/A
4 Department of Industrial Engineering & Management, Chaoyang University of Technology, Taichung, Taiwan, N/A
doi 10.5267/j.ijiec.2021.1.001
9 Source: Scopus
Crossref 2 Source: CrossRef

🔑 Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance

Abstract: Production planners today must simultaneously face with the time and quality demands of various goods externally and meet limited capacity internally. This study presents a two-stage delayed- differentiation multiproduct model that considers the outsourcing options for common parts, overtime strategy for end products, and quality reassurance to assist in making fabrication runtime decisions that are cost-effective. Stage one produces all necessary common intermediate components for end products. To reduce stage one’s utilization/uptime, this study adopts a partial outsourcing option. Stage two uses an overtime strategy to fabricate end products that further shorten the uptime. The production processes in both phases are assumed to be imperfect. This study employs the reworking/scrapping of random faulty items to reassure product quality. The researchers build a model to depict the proposed problem’s characteristics and used the mathematical modeling, analysis, and optimization approach to determine the best rotation cycle length that minimizes the system’s expenses. Further, in this study, the researchers provide sensitivity analyses and a numerical illustration, which validate the result’s applicability and exhibit its capability. This result contributes to practical multiproduct-fabrication by (1) deriving the optimal manufacturing policy for a delayed-differentiation multiproduct system with dual uptime reduction policies and quality reassurance; and (2) offering a decisional model that allows production planners to explore the collective/separate effect of a quality-ensured and dual uptime reduction strategy on a problem’s operating policy and crucial system performance indicators, which assists in cost-effective decision-making.

How to cite this paper
APA: Chiu, S., Chiu, V., Hwang, M & Chiu, Y. (2021). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations, 12(2), 143-158.
Chicago/Turabian: Chiu, S., Chiu, V., Hwang, M & Chiu, Y. 2021. "A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance." International Journal of Industrial Engineering Computations 12, no. 2 (2021): 143-158.
AMA: Chiu, S., Chiu, V., Hwang, M & Chiu, Y. A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations. 2021;12(2):143-158.

References
Akkermans, H., Van Oppen, W., Wynstra, F., & Voss, C. (2019). Contracting outsourced services with collaborative key performance indicators. Journal of Operations Management, 65(1), 22-47.
Aouam, T., & Kumar, K. (2019). On the effect of overtime and subcontracting on supply chain safety stocks. Omega, 89, 1-20.
Arun, P., Lincon, S.A., & Prabhakaran, N. (2019). An automated method for the analysis of bearing vibration based on spectrogram pattern matching. Journal of Applied Research and Technology, 17(2), 126-136.
Blecker, T., & Abdelkafi, N. (2006). Complexity and variety in mass customization systems: Analysis and recommendations. Management Decision, 44(7), 908-929.
Cerdá, J., Cafaro, V.G., Cafaro, D.C. (2020). Synchronizing Operations in Multiproduct Batch Facilities Producing Semifinished and Final Products. Industrial and Engineering Chemistry Research, 59 (29), 13113-13131.
Chakraborty, D., Jana, D.K., & Roy, T.K. (2020). Multi-warehouse partial backlogging inventory system with inflation for non-instantaneous deteriorating multi-item under imprecise environment. Soft Computing, 24(19), 14471-14490.
Chiu, Y-S.P., Chen, H-C., Chang, H-H., & Hwang, M-H. (2019a). Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework. International Journal of Industrial Engineering Computations, 10(4), 505-520.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, Y-S.P., Chiu, V., Wang, Y., & Hwang, M-H. (2020a). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. International Journal of Industrial Engineering Computations, 11(4), 509-524.
Chiu, Y.-S.P., Zhao, Z.-Y., Chiu, S.W., & Chiu, V. (2020b). A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments. International Journal of Industrial Engineering Computations, 11(3), 341-358.
Chiu, Y-S.P., Sung, P-C., & Chiu, V. (2020c) A two-phase solution approach for a manufacturing- distribution problem with rework, outsourcing, and multi-shipment policy. Journal of Applied Engineering Science, 18(4), 505-509.
Chiu, Y-S.P., Chang, H-H., Chiu, T., & Chiu, S.W. (2021). A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance. International Journal of Industrial Engineering Computations, 12(1), 64-78.
Dellaer, N.P., & Melo, M.T. (1998). Make-to-order policies for a stochastic lot-sizing problem using overtime. International Journal of Production Economics, 56–57, 79-97.
Hamers, H., Klijn, F., & Slikker, M. (2019). Implementation of optimal schedules in outsourcing with identical suppliers. Mathematical Methods of Operations Research, 89(2), 173-187.
Jabbarzadeh, A., Haughton, M., & Pourmehdi, F. (2019). A robust optimization model for efficient and green supply chain planning with postponement strategy. International Journal of Production Economics, 214, 266-283.
Jaramillo, F., & Erkoc, M. (2017). Minimizing total weighted tardiness and overtime costs for single machine preemptive scheduling. Computers and Industrial Engineering, 107, 109-119.
Jha, K.K., Thakkar, J.J., &Thanki, S.J. (2020). Cycle time reduction in outsourcing process: case of an Indian aerospace industry. International Journal of Advanced Manufacturing Technology, 106(9-10), 4355-4373.
Jimmy, J., Roesyadi, A., Suprapto, S., Kurniawansyah, F., Anggraini, W., & Rahmawati, R. (2020). Activated carbon from bamboo waste: Effect of activation sequences and iron-cobalt impregnation to material properties and catalyst performance. Journal of Applied Engineering Science, 18(1), 1-9.
Jirjahn, U. (2008). On the determinants of shift work and overtime work: Evidence from German establishment data. British Journal of Industrial Relations, 46(1), 133-168.
Kamien, M.I., Li, L., & Samet, D. (1989). Bertrand competition with subcontracting. RAND Journal of Economics, 20, 553-567.
Kenyon, G.N., Meixell, M.J., & Westfall, P.H. (2016). Production outsourcing and operational performance: An empirical study using secondary data. International Journal of Production Economics, 171(3), 336-349.
Kikuchi, H., Odagiri, Y., Ohya, Y., Nakanishi, Y., Shimomitsu, T., Theorell, T., & Inoue, S. (2020). Association of overtime work hours with various stress responses in 59,021 Japanese workers: Retrospective cross-sectional study. PLoS ONE, 15(3), Art. No. e0229506.
Kim, J.-S., Shin, K.-C., & Park, S.-K. (2000). An optimal algorithm for repairable-item inventory system with depot spares. Journal of the Operational Research Society, 51(3), 350-357.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
Lin, H-D., Chen, Y-R., Chiu, V., & Chiu, Y-S.P. (2019). A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option. Journal of Applied Engineering Science 17(3), 362-371.
Mabude, K., Malela-Majika, J.-C., & Shongwe, S.C. (2020). A new distribution-free generally weighted moving average monitoring scheme for detecting unknown shifts in the process location. International Journal of Industrial Engineering Computations, 11(2), 235-254.
Mojeed, H.A., Bajeh, A.O., Balogun, A.O., & Adeleke, H.O. (2019). Memetic approach for multi-objective overtime planning in software engineering projects. Journal of Engineering Science and Technology, 14(6), 3213-3233.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nachiappan, S.P., Jawahar, N., & Kumar, N.K. (2008). Operating parameters for a single-vendor multiple-buyers Vendor Managed Inventory System with Outsourcing. International Journal of Operational Research, 3(3), 336-361.
Ouaddi, K., Mhada, F.-Z., & Benadada, Y. (2020). Memetic algorithm for multi-tours dynamic vehicle routing problem with overtime (Mdvrpot). International Journal of Industrial Engineering Computations, 11(4), 643-662.
Roy, A., Maity, K., Kar, S., & Maiti, M. (2009). A production–inventory model with remanufacturing for defective and usable items in fuzzy-environment. Computers & Industrial Engineering, 56(1), 87-96.
Seth, D., & Panigrahi, A. (2015). Application and evaluation of packaging postponement strategy to boost supply chain responsiveness: A case study. Production Planning and Control, 26, 1069-1089.
Sonntag, D., & Kiesmüller, G.P. (2018). Disposal versus rework – Inventory control in a production system with random yield. European Journal of Operational Research, 267(1), 138-149.
Uniyal, N., Pant, S., & Kumar, A. (2020). An overview of few nature inspired optimization techniques and its reliability applications. International Journal of Mathematical, Engineering and Management Sciences, 5(4), 732-743.
Van Hoek, R.I. (1999). Postponement and the reconfiguration challenge for food supply chains. Supply Chain Management, 4(1), 18-34.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2021 | 📖 Volume: 12 | 📄 Issue: 2 | 👁️ Views: 2004 | 📊 Crossref: 2

Related Articles:
  • A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance
  • A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance
  • A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments
  • Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework
  • Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com