Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Decision Science Letters » The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

DSL Volumes

    • ▼ Volume 15 (110)
      • Issue 1 (19)
      • Issue 2 (22)
      • Issue 3 (32)
      • Issue 4 (37)
    • ▼ Volume 14 (87)
      • Issue 1 (21)
      • Issue 2 (23)
      • Issue 3 (25)
      • Issue 4 (18)
    • ▼ Volume 13 (78)
      • Issue 1 (21)
      • Issue 2 (18)
      • Issue 3 (19)
      • Issue 4 (20)
    • ▼ Volume 12 (64)
      • Issue 1 (12)
      • Issue 2 (24)
      • Issue 3 (13)
      • Issue 4 (15)
    • ▼ Volume 11 (49)
      • Issue 1 (9)
      • Issue 2 (9)
      • Issue 3 (14)
      • Issue 4 (17)
    • ▼ Volume 10 (43)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (20)
      • Issue 4 (8)
    • ▼ Volume 9 (39)
      • Issue 1 (8)
      • Issue 2 (9)
      • Issue 3 (14)
      • Issue 4 (8)
    • ▼ Volume 8 (38)
      • Issue 1 (8)
      • Issue 2 (6)
      • Issue 3 (14)
      • Issue 4 (10)
    • ▼ Volume 7 (41)
      • Issue 1 (8)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (17)
    • ▼ Volume 6 (30)
      • Issue 1 (8)
      • Issue 2 (6)
      • Issue 3 (9)
      • Issue 4 (7)
    • ▼ Volume 5 (39)
      • Issue 1 (12)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (9)
    • ▼ Volume 4 (48)
      • Issue 1 (10)
      • Issue 2 (12)
      • Issue 3 (14)
      • Issue 4 (12)
    • ▼ Volume 3 (53)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (19)
      • Issue 4 (9)
    • ▼ Volume 2 (30)
      • Issue 1 (5)
      • Issue 2 (6)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 1 (10)
      • Issue 1 (5)
      • Issue 2 (5)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Decision Science Letters
ISSN 1929-5812 (Online) - ISSN 1929-5804 (Print)
Quarterly Publication
Volume 11 Issue 4 pp. 529-544, 2022

The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning Pages 529-544 PDF Download PDF

Authors: Yuan-Shyi Peter Chiu, Singa Wang Chiu, Tiffany Chiu, Hui-Chi Wang

📋 Author Affiliations:
Y.-S.P. Chiu1, S.W. Chiu2, T. Chiu3, H.-C. Wang ORCID 4
1 Department of Industrial Engineering and Management, Chaoyang University of Technology, Taiwan
2 Department of Business Administration, Chaoyang University of Technology, Taiwan
3 School of Business, State University of New York at New Paltz, New York, United States
4 Department of Social Work, Chaoyang University of Technology, Taiwan
doi 10.5267/j.dsl.2022.5.003
2 Source: Scopus
Crossref 1 Source: CrossRef

🔑 Keywords: Optimization, Manufacturing system, Machine failures, Runtime, Rework, Expedited-rate, External source

Abstract: Production managers face the growing trend of rapid-response orders and inevitable production defects and failures; they must carefully measure these factors’ effects to minimize operating expenditures and operational disruption. Inspired by assisting producers decide the optimal runtime policy under these real situations, this work investigates the collective impact of rework, expedited-rate, external source, and machine failures on such a specific fabrication system. A partial outsourcing and expedited manufacturing rate are considered in the studied system to reduce the batch fabricating time. Additionally, defects rework and repair failure machines are implemented to retain the quality and avoid production disruption. Our research scheme consists of (1) developing a model for the mentioned manufacturing characteristics; and (2) analytical and optimization techniques for deciding the best batch runtime decision by minimizing the system’s overall expenses. Lastly, we provide numerical examples to demonstrate the model’s applicability and disclose important, in-depth characteristics that facilitate managerial decision-making.


How to cite this paper
APA: Chiu, Y., Chiu, S., Chiu, T & Wang, H. (2022). The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning. Decision Science Letters, 11(4), 529-544.
Chicago/Turabian: Chiu, Y., Chiu, S., Chiu, T & Wang, H. 2022. "The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning." Decision Science Letters 11, no. 4 (2022): 529-544.
AMA: Chiu, Y., Chiu, S., Chiu, T & Wang, H. The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning. Decision Science Letters. 2022;11(4):529-544.

References
Ayed, S., Dellagi, S., & Rezg, N. (2011). Optimal integrated maintenance production strategy with variable production rate for random demand and subcontracting constraint. IFAC Proceedings, 44(1), 5207-5212.
Chiu, S.W. (2007). Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research, 66(12), 979- 988.
Chiu, S.W., Huang, Y-J., Chiu, Y-S.P., & Chiu, T. (2019). Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps. International Journal of Industrial Engineering Computations, 10(3), 443-452.
Chiu, S.W., Chen, H-C., Wu, H-Y., & Chiu, Y-S.P. (2020). A hybrid finite production rate system featuring random breakdown and rework. Operations Research Perspectives, 7, Art. No. 100142, 1-10
Dey, B.K., Sarkar, B., & Pareek, S. (2019). A two-echelon supply chain management with setup time and cost reduction, quality improvement and variable production rate. Mathematics, 2019, 7(4), Art. No. 328, 1-25.
Grossman, G.M., & Helpman, E. (2002). Integration versus outsourcing in industry equilibrium. The Quarterly Journal of Economics, 117(1), 85-120.
Hazrati, H., Barzegarinegad, A., & Siaby-Serajehlo, H. (2021). A hybrid mathematical and decision-making model to determine the amount of economic order considering the discount. Mathematical Problems in Engineering, 2021, Art. No. 5229949.
Jabal Ameli, M.S., Arkat, J., & Barzinpour, F. (2008). Modelling the effects of machine breakdowns in the generalized cell formation problem. International Journal of Advanced Manufacturing Technology, 39(7-8), 838-850.
Karim, R., & Nakade, K. (2021). Stochastic analysis of an imperfect production-inventory system with consideration of random machine breakdown, rework, inspection, and environmental emissions. International Journal of Industrial and Systems Engineering, 39(1), 71-122.
Kershaw, J., Yu, R., Zhang, Y., & Wang, P. (2021). Hybrid machine learning-enabled adaptive welding speed control. Journal of Manufacturing Processes, 71, 374-383.
Kumar, R., Tiwari, M.K., & Allada, V. (2004). Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability. International Journal of Production Research, 42(21), 4431-4455.
Maggio, N., Matta, A., Gershwin, S.B., & Tolio, T. (2009). A decomposition approximation for three-machine closed-loop production systems with unreliable machines, finite buffers and a fixed population. IIE Transactions, 41(6), 562-574.
Mendelson, H., & Parlaktürk, A.K. (2008). Product-line competition: Customization vs. proliferation. Management Science, 54(12), 2039-2053.
Neidigh, R.O., & Harrison, T.P. (2017). Optimising lot sizing with nonlinear production rates in a multi-product multi-machine environment. International Journal of Production Research, 55(4), 939-959.
Öztürk, H. (2021). Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs. Operational Research, 21(1), 167-204.
Pan, J.C-H., & Yang, M-F. (2008). Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain. International Journal of Production Research, 46(3), 753-770.
Ramasubbu, N., Shang, J., May, J.H., Tjader, Y., & Vargas, L. (2019). Task interdependence and firm performance in outsourced service operations. Manufacturing and Service Operations Management, 21(3), 658-673.
Rostami, B., Kämmerling, N., Buchheim, C., & Clausen, U. (2018). Reliable single allocation hub location problem under hub breakdowns. Computers and Operations Research, 96, 15-29.
Shy, O., & Stenbacka, R. (2012). Efficient organization of production: Nested versus horizontal outsourcing. Economics Letters, 116(3), 593-596.
Ullah, M., & Kang, C.W. (2014). Effect of rework, rejects and inspection on lot size with work-in-process inventory. International Journal of Production Research, 52(8), 2448-2460.
Yamada, T.T., Nagano, M.S., & Miyata, H.H. (2021). Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, 12(4), 415-426.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Decision Science Letters | 📅 Year: 2022 | 📖 Volume: 11 | 📄 Issue: 4 | 👁️ Views: 1069 | 📊 Crossref: 1

Related Articles:
  • Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown
  • Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy
  • An integrated production inventory model of deteriorating items subject to random machine breakdown with a stochastic repair time
  • A production inventory model with exponential demand rate and reverse logistic
  • Multi products single machine EPQ model with immediate rework process

📝 Ready to share your research?

Decision Science Letters is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com