How to cite this paper
Chiu, Y., Chiu, V., Wang, Y & Hwang, M. (2020). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance.International Journal of Industrial Engineering Computations , 11(4), 509-524.
Refrences
Abashar, M.E.E. (2018). Ultra-clean hydrogen production by ammonia decomposition. Journal of King Saud University - Engineering Sciences, 30(1), 2-11.
Alfredsson, P. (1997). Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities. European Journal of Operational Research, 99(3), 584-595.
Akkan, C. (1996). Overtime scheduling: an application in finite-capacity real-time scheduling. Journal of the Operational Research Society, 47, 1137-1149.
Ahranjani, L.Z., & Matin, R.K. (2018). Technical measure of capacity utilization in two-stage production systems: A data envelopment analysis approach. Economic Computation and Economic Cybernetics Studies and Research, 52(2), 235-249.
Aringhieri, R., Duma, D., & Fragnelli, V. (2018). Modeling the rational behavior of individuals on an e-commerce system. Operations Research Perspectives, 5, 22-31.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21(3), Art. No. 38, 1-17.
Chiu, Y-S.P., Lin, H-D., Wu, M-F., & Chiu, S.W. (2018a). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations, 9(2), 235-248.
Chiu, S.W., Wu, H.Y., Chiu, Y.-S.P., & Hwang, M.-H. (2018b). Exploration of finite production rate model with overtime and rework of nonconforming products. Journal of King Saud University - Engineering Sciences, 30(3), 224-231.
Chiu, S.W., Lin, H.-D., Chou, C.-L., & Chiu, Y.-S.P. (2018c). Mathematical modeling for exploring the effects of overtime option, rework, and discontinuous inventory issuing policy on EMQ model. International Journal of Industrial Engineering Computations, 9(4), 479-490.
Chiu, S.W., Kuo, J-S., Chiu, Y-S.P., & Chang, H-H. (2019a). Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme. Jordan Journal of Mechanical & Industrial Engineering, 13(2), 105-115.
Chiu, S.W., Huang, Y-J., Chiu, Y-S.P., & Chiu, T. (2019b). Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps. International Journal of Industrial Engineering Computations, 10(3), 443-452.
Iqbal, A., Ahmad, S.A., & Ojasvi (2019). Appropriate selections of distillation column control variable to improve integrating material recycle response. Journal of King Saud University - Engineering Sciences, 31(2), 106-113.
Istotskiy, V., & Protasev, V. (2019). Design and manufacture of hob mills for the formation of straight slots using the principles of screw backing. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 936-945.
Jirjahn, U. (2008). On the determinants of shift work and overtime work: Evidence from German establishment data. British Journal of Industrial Relations, 46(1), 133-168.
Khanna, A., Gautam, P., & Jaggi, C.K. (2017). Inventory modeling for deteriorating imperfect quality items with selling price dependent demand and shortage backordering under credit financing. International Journal of Mathematical, Engineering and Management Sciences, 2(2), 110-124.
Ko, J., & Jack Hu, S. (2008). Balancing of manufacturing systems with complex configurations for delayed product differentiation. International Journal of Production Research, 46(15), 4285-4308.
Lagodimos, A.G., & Mihiotis, A.N. (2006). Overtime vs. regular shift planning decisions in packing shops. International Journal of Production Economics, 101(2), 246-258.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
MohanDas, C.D., Ayyanar, A., Susaiyappan, S., & Kalimuthu, R. (2017). Analysis of the effects of fabrication parameters on the mechanical properties of Areca fine fiber-reinforced phenol formaldehyde composite using Taguchi technique. Journal of Applied Research and Technology, 15 (4), 365-370.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Noman, M.A., Nasr, E.S.A., Al-Shayea, A., & Kaid, H. (2019). Overview of predictive condition based maintenance research using bibliometric indicators. Journal of King Saud University - Engineering Sciences, 31(4), 355-367.
Oladapo, B.I., Balogun, V.A., Adeoye, A.O.M., Olubunmi, I.E., & Afolabi, S.O. (2017). Experimental analysis of electro-pneumatic optimization of hot stamping machine control systems with on-delay timer. Journal of Applied Research and Technology, 15(4), 356-364.
Omar, Y.M., Minoufekr, M., & Plapper, P. (2019). Business analytics in manufacturing: Current trends, challenges and pathway to market leadership. Operations Research Perspectives, 6, Art. No.100127, 1-15.
Ortiz-Servin, J.J., Castillo, A., & Talavera, F. (2019). A new methodology to optimize operation cycles in a bwr using heuristic techniques. Journal of Applied Research and Technology, 17(3), 155-162.
Palos-Sanchez, P., Saura, J.R., & Martin-Velicia, F. (2019). A study of the effects of programmatic advertising on users’ concerns about privacy overtime. Journal of Business Research, 96, 61-72.
Parnianifard, A., Azfanizam, A.S., Ariffin, M.K.A., & Ismail, M.I.S. (2019). Trade-off in robustness, cost and performance by a multi-objective robust production optimization method. International Journal of Industrial Engineering Computations, 10(1), 133-148.
Pearce, A., Pons, D., & Neitzert, T. (2018). Implementing lean - outcomes from SME case studies. Operations Research Perspectives, 5, 94-104.
Rao, A.S., & Singh, A.K. (2018). Failure analysis of stainless steel lanyard wire rope. Journal of Applied Research and Technology, 16(1), 35-40.
Reimann, M. (2012). Accurate response by postponement, European Journal of Operational Research, 220(3), 619-628.
Roul, J.N., Maity, K., Kar, S., & Maiti, M. (2015). Multi-item reliability dependent imperfect production inventory optimal control models with dynamic demand under uncertain resource constraint. International Journal of Production Research 53(16), 4993-5016.
Sheikh, S., Komaki, G.M., Kayvanfar, V., & Teymourian, E. (2019). Multi-Stage assembly flow shop with setup time and release time. Operations Research Perspectives, 6 (2019), Art. No. 100111, 1-15.
Taş, D., Gendreau, M., Jabali, O., & Jans, R. (2019). A capacitated lot sizing problem with stochastic setup times and overtime. European Journal of Operational Research, 273 (1), 146-159.
Van Mieghem, J.A., & Dada, M. (1999). Price versus production postponement: capacity and competition. Management Science, 45(12), 1631-1649.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.
Wenbin, Z., Frenkel, I., Guixiang, S., Bolvashenkov, I., Kammermann, J., Herzog, H.-G., & Khvatskin, L. (2019). Markov reward approach and reliability associated cost model for machine tools maintenance-planning optimization. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 824-840.
Yu, S.B., & Efstathiou, J. (2006). Complexity in rework cells: Theory, analysis and comparison. Journal of the Operational Research Society, 57(5), 593-602.
Zinn, W. (1990). Developing heuristics to estimate the impact of postponement on safety stock. The International Journal of Logistics Management, 1(2), 11-16.
Alfredsson, P. (1997). Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities. European Journal of Operational Research, 99(3), 584-595.
Akkan, C. (1996). Overtime scheduling: an application in finite-capacity real-time scheduling. Journal of the Operational Research Society, 47, 1137-1149.
Ahranjani, L.Z., & Matin, R.K. (2018). Technical measure of capacity utilization in two-stage production systems: A data envelopment analysis approach. Economic Computation and Economic Cybernetics Studies and Research, 52(2), 235-249.
Aringhieri, R., Duma, D., & Fragnelli, V. (2018). Modeling the rational behavior of individuals on an e-commerce system. Operations Research Perspectives, 5, 22-31.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21(3), Art. No. 38, 1-17.
Chiu, Y-S.P., Lin, H-D., Wu, M-F., & Chiu, S.W. (2018a). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations, 9(2), 235-248.
Chiu, S.W., Wu, H.Y., Chiu, Y.-S.P., & Hwang, M.-H. (2018b). Exploration of finite production rate model with overtime and rework of nonconforming products. Journal of King Saud University - Engineering Sciences, 30(3), 224-231.
Chiu, S.W., Lin, H.-D., Chou, C.-L., & Chiu, Y.-S.P. (2018c). Mathematical modeling for exploring the effects of overtime option, rework, and discontinuous inventory issuing policy on EMQ model. International Journal of Industrial Engineering Computations, 9(4), 479-490.
Chiu, S.W., Kuo, J-S., Chiu, Y-S.P., & Chang, H-H. (2019a). Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme. Jordan Journal of Mechanical & Industrial Engineering, 13(2), 105-115.
Chiu, S.W., Huang, Y-J., Chiu, Y-S.P., & Chiu, T. (2019b). Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps. International Journal of Industrial Engineering Computations, 10(3), 443-452.
Iqbal, A., Ahmad, S.A., & Ojasvi (2019). Appropriate selections of distillation column control variable to improve integrating material recycle response. Journal of King Saud University - Engineering Sciences, 31(2), 106-113.
Istotskiy, V., & Protasev, V. (2019). Design and manufacture of hob mills for the formation of straight slots using the principles of screw backing. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 936-945.
Jirjahn, U. (2008). On the determinants of shift work and overtime work: Evidence from German establishment data. British Journal of Industrial Relations, 46(1), 133-168.
Khanna, A., Gautam, P., & Jaggi, C.K. (2017). Inventory modeling for deteriorating imperfect quality items with selling price dependent demand and shortage backordering under credit financing. International Journal of Mathematical, Engineering and Management Sciences, 2(2), 110-124.
Ko, J., & Jack Hu, S. (2008). Balancing of manufacturing systems with complex configurations for delayed product differentiation. International Journal of Production Research, 46(15), 4285-4308.
Lagodimos, A.G., & Mihiotis, A.N. (2006). Overtime vs. regular shift planning decisions in packing shops. International Journal of Production Economics, 101(2), 246-258.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
MohanDas, C.D., Ayyanar, A., Susaiyappan, S., & Kalimuthu, R. (2017). Analysis of the effects of fabrication parameters on the mechanical properties of Areca fine fiber-reinforced phenol formaldehyde composite using Taguchi technique. Journal of Applied Research and Technology, 15 (4), 365-370.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Noman, M.A., Nasr, E.S.A., Al-Shayea, A., & Kaid, H. (2019). Overview of predictive condition based maintenance research using bibliometric indicators. Journal of King Saud University - Engineering Sciences, 31(4), 355-367.
Oladapo, B.I., Balogun, V.A., Adeoye, A.O.M., Olubunmi, I.E., & Afolabi, S.O. (2017). Experimental analysis of electro-pneumatic optimization of hot stamping machine control systems with on-delay timer. Journal of Applied Research and Technology, 15(4), 356-364.
Omar, Y.M., Minoufekr, M., & Plapper, P. (2019). Business analytics in manufacturing: Current trends, challenges and pathway to market leadership. Operations Research Perspectives, 6, Art. No.100127, 1-15.
Ortiz-Servin, J.J., Castillo, A., & Talavera, F. (2019). A new methodology to optimize operation cycles in a bwr using heuristic techniques. Journal of Applied Research and Technology, 17(3), 155-162.
Palos-Sanchez, P., Saura, J.R., & Martin-Velicia, F. (2019). A study of the effects of programmatic advertising on users’ concerns about privacy overtime. Journal of Business Research, 96, 61-72.
Parnianifard, A., Azfanizam, A.S., Ariffin, M.K.A., & Ismail, M.I.S. (2019). Trade-off in robustness, cost and performance by a multi-objective robust production optimization method. International Journal of Industrial Engineering Computations, 10(1), 133-148.
Pearce, A., Pons, D., & Neitzert, T. (2018). Implementing lean - outcomes from SME case studies. Operations Research Perspectives, 5, 94-104.
Rao, A.S., & Singh, A.K. (2018). Failure analysis of stainless steel lanyard wire rope. Journal of Applied Research and Technology, 16(1), 35-40.
Reimann, M. (2012). Accurate response by postponement, European Journal of Operational Research, 220(3), 619-628.
Roul, J.N., Maity, K., Kar, S., & Maiti, M. (2015). Multi-item reliability dependent imperfect production inventory optimal control models with dynamic demand under uncertain resource constraint. International Journal of Production Research 53(16), 4993-5016.
Sheikh, S., Komaki, G.M., Kayvanfar, V., & Teymourian, E. (2019). Multi-Stage assembly flow shop with setup time and release time. Operations Research Perspectives, 6 (2019), Art. No. 100111, 1-15.
Taş, D., Gendreau, M., Jabali, O., & Jans, R. (2019). A capacitated lot sizing problem with stochastic setup times and overtime. European Journal of Operational Research, 273 (1), 146-159.
Van Mieghem, J.A., & Dada, M. (1999). Price versus production postponement: capacity and competition. Management Science, 45(12), 1631-1649.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.
Wenbin, Z., Frenkel, I., Guixiang, S., Bolvashenkov, I., Kammermann, J., Herzog, H.-G., & Khvatskin, L. (2019). Markov reward approach and reliability associated cost model for machine tools maintenance-planning optimization. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 824-840.
Yu, S.B., & Efstathiou, J. (2006). Complexity in rework cells: Theory, analysis and comparison. Journal of the Operational Research Society, 57(5), 593-602.
Zinn, W. (1990). Developing heuristics to estimate the impact of postponement on safety stock. The International Journal of Logistics Management, 1(2), 11-16.