Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Authors » Peng-Cheng Sung

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy Pages 491-508 PDF Download PDF

Authors: Singa Wang Chiu, Liang-Wei You, Peng-Cheng Sung, Yunsen Wang

doi 10.5267/j.ijiec.2020.6.002

🔑 Keywords: Production runtime, Stochastic breakdown, Accelerated manufacturing rate, Repairable items, Multi-delivery plan

Abstract:
This study explores the optimal fabrication runtime for a buyer-vendor incorporated system featuring repairable items, stochastic breakdown, accelerated rate, and multi-delivery strategy. Operating in today’s competitive global market, transnational production firms make every effort to meet client requirements in terms of the due date and quality goods. Further, they also must handle all inevitable events incurred in the manufacturing process, such as unanticipated equipment breakdowns and defective products, with caution to avoid production schedule delay and cost overrun. To examine such a vendor-buyer incorporated system, we build a model to characterize the aforementioned features in the system. The function of total system cost is derived through formulation and analyses. The optimization method and a recursive algorithm are employed to help in deriving the optimal (i.e., cost minimization) fabrication runtime for our problem. An example numerically illustrates how our model, method, and algorithm work. It also reveals the capability of our model in analyzing the impact of each and/or joint feature(s) (e.g., the breakdown, accelerated rate, rework, multi-delivery strategy) on the system’s utilization, optimal runtime, total expenses, and individual cost contributor to assist in managerial decision making, and hence, enabling the firm to gain competitive advantage.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1482

 
2.

Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement Pages 353-364 PDF Download PDF

Authors: Peng-Cheng Sung, Chia-Ming Lai, Yunsen Wang, Yuan-Shyi P. Chiu

doi 10.5267/j.uscm.2022.1.003

🔑 Keywords: Multiproduct fabrication, Supply chain, Commonality, External provider, Postponement

Abstract:
This study presents a multiproduct fabrication cost-minimization model featuring external providers, commonality, rework, and postponement in the supply chain environment. Customers’ requirements simultaneously emphasize quality, variety, and fast response time in current markets. To satisfy customer needs, most manufacturers in various industries (e.g., clothing, household goods, automotive, etc.) plan their multiproduct fabrication by incorporating a postponement strategy, rework process, and an outsourcing option. Motivated by the viewpoints above, this study offers a decision support system to address customers’ external expectations while optimizing internal operating expenses and machine utilization. We propose a single-machine, two-stage delayed differentiation system under a rotation cycle policy. All needed common parts are made in stage one, and stage two fabricates different end products. An external provider is hired to supply partially needed common parts to shorten uptime. The defective items are inevitably produced in both stages. They are categorized and reworked to maintain the desired product quality. Finally, we derive an optimal cost-minimization rotation cycle for our model and use a numerical example to investigate the collective and individual influences of reworking, postponement, and outsourcing to external providers on the multiproduct fabrication problem. In summary, this study can offer an optimization solution for production planning in various modern industries.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: USCM | Year: 2022 | Volume: 10 | Issue: 2 | Views: 1521

 

® 2010-2026 GrowingScience.Com