How to cite this paper
Chiu, S., Wu, H., Yeh, T & Wang, Y. (2021). Solving a hybrid batch production problem with unreliable equipment and quality reassurance.International Journal of Industrial Engineering Computations , 12(3), 235-248.
Refrences
Assid, M., Gharbi, A., & Dhouib, K. (2015). Joint production and subcontracting planning of unreliable multi-facility multi-product production systems. Omega, 50, 54–69.
Bettis, R.A., Bradley, S.P., Hamel, G. (1992). Outsourcing and Industrial Decline. The Executive, 6(1), 7-22.
Barak, S., & Javanmard, S. (2020). Outsourcing modelling using a novel interval-valued fuzzy quantitative strategic planning matrix (QSPM) and multiple criteria decision-making (MCDMs). International Journal of Production Economics, 222, Art. No. 107494.
Brandes, H., Lilliecreutz, J., & Brege, S. (1997). Outsourcing—success or failure?: Findings from five case studies. European Journal of Purchasing & Supply Management, 3(2), 63-75.
Bukljaš, M., Pavić, I., Vidan, P., & Vukša, S. (2020). Aerial foggy image rejection using single neuron. Journal of Applied Engineering Science, 18(2), 301-304.
Bui, Q., Leo, E., & Adelakun, O. (2019). Exploring complexity and contradiction in information technology outsourcing: A set-theoretical approach. The Journal of Strategic Information Systems 28(3), 330-355.
Chiu, S.W., Chen, H-C., Wu, H-Y., & Chiu, Y-S.P. (2020a). A hybrid finite production rate system featuring random breakdown and rework. Operations Research Perspectives, 7, Art. No. 100142, 1-10.
Chiu, Y-S.P., Sung, P-C., & Chiu, V. (2020b). A two-phase solution approach for a manufacturing- distribution problem with rework, outsourcing, and multi-shipment policy. Journal of Applied Engineering Science 18(4), 505-509.
Chiu, Y-S.P., Jhan, J-H., Chiu, V., & Chou, C-L. (2020c). Incorporating outsourcing, stochastic failure, and scrap into batch fabrication planning. Alexandria Engineering Journal, 59(6), 5273-5284.
Gera, A.E. (2021). The Reliability of a System Involving Change Points. International Journal of Mathematical, Engineering and Management Sciences, 6(1), 296-308.
Giri, B.C., & Chakraborty, A. (2011). Supply chain coordination for a deteriorating product under stock- dependent consumption rate and unreliable production process. International Journal of Industrial Engineering Computations, 2(2), 263-272.
Hagstrom, J.N., & Mak, K-T. (1987). System reliability analysis in the presence of dependent component failures. Probability in the Engineering and Informational Sciences, 1(4), 425-440.
Haoues, M. Dahane, M., & Mouss, N.K. (2019). Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints. Journal of Intelligent Manufacturing, 30(2), 701-725.
Iqbal, J., Ahmad, R.B., Khan, M., Fazal-E-Amin, Alyahya, S., Nasir, M.H.N., Akhunzada, A., & Shoaib, M. (2020). Requirements engineering issues causing software development outsourcing failure. PLoS ONE, 15(4), Art. No. e0229785.
Khandelwal, D.N., Sharma, J., & Ray, L.M. (1979). Optimal periodic maintenance policy for machines subject to deterioration and random breakdown. IEEE Transactions on Reliability, R-28(4), 328-330.
Jat, A., & Tiwari, R. (2020). Multi-objective optimization of spherical roller bearings based on fatigue and wear using evolutionary algorithm. Journal of King Saud University - Engineering Sciences, 32(1), 58-68.
Lee, H.L. (1992). Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science, 38(9), 1314-1328.
Lee-Mortimer, A. (2006). Improved product design as an alternative to outsourcing manufacture and assembly. Assembly Automation, 26(2), 121-126.
Moini, A., & Murthy, D.N.P. (2000). Optimal lot sizing with unreliable production system. Mathematical and Computer Modelling, 31(10-12), 245-250.
Mustajib, M.I., Ciptomulyono, U., & Kurniati, N. (2019). Determining factors of quality uncertainty and its control analysis in remanufacturing system. International Journal of Applied Science and Engineering, 16(1), 35-45.
Nahas, N., Nourelfath, M., & Ait-Kadi, D. (2009). Selecting machines and buffers in unreliable series-parallel production lines. International Journal of Production Research, 47(14), 3741-3774.
Nissas, W., & Gasmi, S. (2021). On the Maintenance Modeling of a Hybrid Model with Exponential Repair Efficiency. International Journal of Mathematical, Engineering and Management Sciences, 6(1), 254-267.
Ortiz-Servin, J.J., Castillo, A., & Talavera, F. (2019). A new methodology to optimize operation cycles in a bwr using heuristic techniques. Journal of Applied Research and Technology, 17(3), 155-162.
Pinto, G., Silva, F.J.G., Fernandes, N.O., Casais, R., Baptista, A., & Carvalho, C. (2020). Implementing a maintenance strategic plan using TPM methodology. International Journal of Industrial Engineering and Management, 11(3), 192-204.
Poursoltan, L., Seyedhosseini, S.M., & Jabbarzadeh, A. (2020). An extension to the economic production quantity problem with deteriorating products considering random machine breakdown and stochastic repair time. International Journal of Engineering, Transactions B: Applications, 33(8), 1567-1578.
Sha, D.Y., Hsieh, L., & Chen, K. (2001). Wafer rework strategies at the photolithography stage. International Journal of Industrial Engineering: Theory Applications and Practice, 8(2), 122-130.
Shanthikumar, J.G., & Tien, C.C. (1983). Algorithmic solution to two-stage transfer lines with possible scrapping of units. Management Science, 29(7), 1069-1086.
Srinivasa Rao, M., & Naikan, V.N.A. (2014). Reliability analysis of repairable systems using system dynamics modeling and simulation. Journal of Industrial Engineering International, 10(3), art. no. 69.
Taft, E.W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
Wein, A.S. (1992). Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research, 40(3), 551-563.
Bettis, R.A., Bradley, S.P., Hamel, G. (1992). Outsourcing and Industrial Decline. The Executive, 6(1), 7-22.
Barak, S., & Javanmard, S. (2020). Outsourcing modelling using a novel interval-valued fuzzy quantitative strategic planning matrix (QSPM) and multiple criteria decision-making (MCDMs). International Journal of Production Economics, 222, Art. No. 107494.
Brandes, H., Lilliecreutz, J., & Brege, S. (1997). Outsourcing—success or failure?: Findings from five case studies. European Journal of Purchasing & Supply Management, 3(2), 63-75.
Bukljaš, M., Pavić, I., Vidan, P., & Vukša, S. (2020). Aerial foggy image rejection using single neuron. Journal of Applied Engineering Science, 18(2), 301-304.
Bui, Q., Leo, E., & Adelakun, O. (2019). Exploring complexity and contradiction in information technology outsourcing: A set-theoretical approach. The Journal of Strategic Information Systems 28(3), 330-355.
Chiu, S.W., Chen, H-C., Wu, H-Y., & Chiu, Y-S.P. (2020a). A hybrid finite production rate system featuring random breakdown and rework. Operations Research Perspectives, 7, Art. No. 100142, 1-10.
Chiu, Y-S.P., Sung, P-C., & Chiu, V. (2020b). A two-phase solution approach for a manufacturing- distribution problem with rework, outsourcing, and multi-shipment policy. Journal of Applied Engineering Science 18(4), 505-509.
Chiu, Y-S.P., Jhan, J-H., Chiu, V., & Chou, C-L. (2020c). Incorporating outsourcing, stochastic failure, and scrap into batch fabrication planning. Alexandria Engineering Journal, 59(6), 5273-5284.
Gera, A.E. (2021). The Reliability of a System Involving Change Points. International Journal of Mathematical, Engineering and Management Sciences, 6(1), 296-308.
Giri, B.C., & Chakraborty, A. (2011). Supply chain coordination for a deteriorating product under stock- dependent consumption rate and unreliable production process. International Journal of Industrial Engineering Computations, 2(2), 263-272.
Hagstrom, J.N., & Mak, K-T. (1987). System reliability analysis in the presence of dependent component failures. Probability in the Engineering and Informational Sciences, 1(4), 425-440.
Haoues, M. Dahane, M., & Mouss, N.K. (2019). Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints. Journal of Intelligent Manufacturing, 30(2), 701-725.
Iqbal, J., Ahmad, R.B., Khan, M., Fazal-E-Amin, Alyahya, S., Nasir, M.H.N., Akhunzada, A., & Shoaib, M. (2020). Requirements engineering issues causing software development outsourcing failure. PLoS ONE, 15(4), Art. No. e0229785.
Khandelwal, D.N., Sharma, J., & Ray, L.M. (1979). Optimal periodic maintenance policy for machines subject to deterioration and random breakdown. IEEE Transactions on Reliability, R-28(4), 328-330.
Jat, A., & Tiwari, R. (2020). Multi-objective optimization of spherical roller bearings based on fatigue and wear using evolutionary algorithm. Journal of King Saud University - Engineering Sciences, 32(1), 58-68.
Lee, H.L. (1992). Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science, 38(9), 1314-1328.
Lee-Mortimer, A. (2006). Improved product design as an alternative to outsourcing manufacture and assembly. Assembly Automation, 26(2), 121-126.
Moini, A., & Murthy, D.N.P. (2000). Optimal lot sizing with unreliable production system. Mathematical and Computer Modelling, 31(10-12), 245-250.
Mustajib, M.I., Ciptomulyono, U., & Kurniati, N. (2019). Determining factors of quality uncertainty and its control analysis in remanufacturing system. International Journal of Applied Science and Engineering, 16(1), 35-45.
Nahas, N., Nourelfath, M., & Ait-Kadi, D. (2009). Selecting machines and buffers in unreliable series-parallel production lines. International Journal of Production Research, 47(14), 3741-3774.
Nissas, W., & Gasmi, S. (2021). On the Maintenance Modeling of a Hybrid Model with Exponential Repair Efficiency. International Journal of Mathematical, Engineering and Management Sciences, 6(1), 254-267.
Ortiz-Servin, J.J., Castillo, A., & Talavera, F. (2019). A new methodology to optimize operation cycles in a bwr using heuristic techniques. Journal of Applied Research and Technology, 17(3), 155-162.
Pinto, G., Silva, F.J.G., Fernandes, N.O., Casais, R., Baptista, A., & Carvalho, C. (2020). Implementing a maintenance strategic plan using TPM methodology. International Journal of Industrial Engineering and Management, 11(3), 192-204.
Poursoltan, L., Seyedhosseini, S.M., & Jabbarzadeh, A. (2020). An extension to the economic production quantity problem with deteriorating products considering random machine breakdown and stochastic repair time. International Journal of Engineering, Transactions B: Applications, 33(8), 1567-1578.
Sha, D.Y., Hsieh, L., & Chen, K. (2001). Wafer rework strategies at the photolithography stage. International Journal of Industrial Engineering: Theory Applications and Practice, 8(2), 122-130.
Shanthikumar, J.G., & Tien, C.C. (1983). Algorithmic solution to two-stage transfer lines with possible scrapping of units. Management Science, 29(7), 1069-1086.
Srinivasa Rao, M., & Naikan, V.N.A. (2014). Reliability analysis of repairable systems using system dynamics modeling and simulation. Journal of Industrial Engineering International, 10(3), art. no. 69.
Taft, E.W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
Wein, A.S. (1992). Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research, 40(3), 551-563.