Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Liang-Wei You

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
Financial performance(83)
Sustainability(81)
TOPSIS(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Genetic Algorithm(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(62)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2181)
Indonesia(1289)
Jordan(786)
India(786)
Vietnam(504)
Saudi Arabia(452)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(110)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system Pages 329-342 Right click to download the paper Download PDF

Authors: Yuan-Shyi Peter Chiu, Liang-Wei You, Tiffany Chiu, Fan-Yun Pai

DOI: 10.5267/j.ijiec.2022.2.003

Keywords: Multiproduct manufacturing, Rework, Overtime, Fabrication-shipment decision, Postponement

Abstract:
The study examines the combined effect of rework, multiple shipments, postponement, and overtime producing common-component on a multiproduct vendor-client incorporated system. Clients’ product demand trend turns to diversity, quality, and rapid response in the current supply-chain environment. Under such a stiff competitive environment, today’s manufacturers must effectively plan their multi-item fabrication to boost utilization and product quality, minimize total relevant costs, and meet short given order lead time. By considering the commonality of the finished goods, required quality, and completion lead time, this study presents an exact model featuring rework of defects, multiple shipments, postponement, overtime producing the mutual component, and satisfying the market needs. Through the techniques of explicitly modeling, formulating, and system cost minimization, this study simultaneously derives the optimal cycle-time and shipping frequency for the studied problem. A numerical example helps show how our model works for any given parameter values and how the variation in single and multiple factors of the problem affects the crucial system performances (e.g., total uptimes, each relevant cost, utilization, total cost, etc.) A wide variety of today’s industries (e.g., automotive, household goods, etc.) and their related supply chains can utilize our decisional model to reveal in-depth managerial insights for planning their fabrication and shipments.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 3 | Views: 1381 | Reviews: 0

 
2.

Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy Pages 491-508 Right click to download the paper Download PDF

Authors: Singa Wang Chiu, Liang-Wei You, Peng-Cheng Sung, Yunsen Wang

DOI: 10.5267/j.ijiec.2020.6.002

Keywords: Production runtime, Stochastic breakdown, Accelerated manufacturing rate, Repairable items, Multi-delivery plan

Abstract:
This study explores the optimal fabrication runtime for a buyer-vendor incorporated system featuring repairable items, stochastic breakdown, accelerated rate, and multi-delivery strategy. Operating in today’s competitive global market, transnational production firms make every effort to meet client requirements in terms of the due date and quality goods. Further, they also must handle all inevitable events incurred in the manufacturing process, such as unanticipated equipment breakdowns and defective products, with caution to avoid production schedule delay and cost overrun. To examine such a vendor-buyer incorporated system, we build a model to characterize the aforementioned features in the system. The function of total system cost is derived through formulation and analyses. The optimization method and a recursive algorithm are employed to help in deriving the optimal (i.e., cost minimization) fabrication runtime for our problem. An example numerically illustrates how our model, method, and algorithm work. It also reveals the capability of our model in analyzing the impact of each and/or joint feature(s) (e.g., the breakdown, accelerated rate, rework, multi-delivery strategy) on the system’s utilization, optimal runtime, total expenses, and individual cost contributor to assist in managerial decision making, and hence, enabling the firm to gain competitive advantage.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1274 | Reviews: 0

 

® 2010-2026 GrowingScience.Com