Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Quality reassurance

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance Pages 143-158 Right click to download the paper Download PDF

Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu

DOI: 10.5267/j.ijiec.2021.1.001

Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance

Abstract:
Production planners today must simultaneously face with the time and quality demands of various goods externally and meet limited capacity internally. This study presents a two-stage delayed- differentiation multiproduct model that considers the outsourcing options for common parts, overtime strategy for end products, and quality reassurance to assist in making fabrication runtime decisions that are cost-effective. Stage one produces all necessary common intermediate components for end products. To reduce stage one’s utilization/uptime, this study adopts a partial outsourcing option. Stage two uses an overtime strategy to fabricate end products that further shorten the uptime. The production processes in both phases are assumed to be imperfect. This study employs the reworking/scrapping of random faulty items to reassure product quality. The researchers build a model to depict the proposed problem’s characteristics and used the mathematical modeling, analysis, and optimization approach to determine the best rotation cycle length that minimizes the system’s expenses. Further, in this study, the researchers provide sensitivity analyses and a numerical illustration, which validate the result’s applicability and exhibit its capability. This result contributes to practical multiproduct-fabrication by (1) deriving the optimal manufacturing policy for a delayed-differentiation multiproduct system with dual uptime reduction policies and quality reassurance; and (2) offering a decisional model that allows production planners to explore the collective/separate effect of a quality-ensured and dual uptime reduction strategy on a problem’s operating policy and crucial system performance indicators, which assists in cost-effective decision-making.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 2 | Views: 1722 | Reviews: 0

 

® 2010-2026 GrowingScience.Com