How to cite this paper
Chiu, Y., Chang, H., Chiu, T & Chiu, S. (2021). A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance.International Journal of Industrial Engineering Computations , 12(1), 63-78.
Refrences
Abashar, M.E.E. (2018). Ultra-clean hydrogen production by ammonia decomposition. Journal of King Saud University - Engineering Sciences, 30(1), 2-11.
Alvarez, L.H.R., & Stenbacka, R. (2007). Partial outsourcing: A real options perspective. International Journal of Industrial Organization, 25(1), 91-102.
Aringhieri, R., Duma, D., & Fragnelli, V. (2018). Modeling the rational behavior of individuals on an e-commerce system. Operations Research Perspectives, 5, 22-31.
Babu, K.V., Anuradha, B. (2020). Design of multi-band minkowski MIMO antenna to reduce the mutual coupling. Journal of King Saud University - Engineering Sciences, 32(1), 51-57.
Berrade, M.D., Scarf, P.A., & Cavalcante, C.A.V. (2017). A study of postponed replacement in a delay time model. Reliability Engineering & System Safety, 168, 70-79.
Calabria, R., & Pulcini, G. (1999). Discontinuous point processes for the analysis of repairable units. International Journal of Reliability, Quality and Safety Engineering, 6(4), 361-382.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21 (3), 1-17.
Chiu, Y-S.P., Lin, H-D., Wu, M-F., & Chiu, S.W. (2018). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations, 9(2), 235-248.
Chiu, S.W., Kuo, J-S., Chiu, Y-S.P., & Chang, H-H. (2019a). Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme. Jordan Journal of Mechanical & Industrial Engineering, 13(2), 105-115.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, Y-S.P., Chen, H-C., Chang, H-H., & Hwang, M-H. (2019c). Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework. International Journal of Industrial Engineering Computations, 10(4), 505-520.
Chiu, Y-S.P., Chiu, V., Wang, Y., & Hwang, M-H. (2020). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. International Journal of Industrial Engineering Computations, 11(4), 509-524
Davis, T., & Sasser, M. (1995). Postponing product differentiation. Mechanical Engineering, 117(11), 105-107.
Hammado, N., Utomo, S., & Budiyono (2020). Characteristic lignocellulose of sago solid waste for biogas production. Journal of Applied Engineering Science, 18(2), 157-164.
Hines, P., & Rich, N. (1998). Outsourcing competitive advantage: the use of supplier associations. International Journal of Physical Distribution and Logistics Management, 28(7), 524-546.
Iqbal, A., Ahmad, S.A., & Ojasvi (2019). Appropriate selections of distillation column control variable to improve integrating material recycle response. Journal of King Saud University - Engineering Sciences, 31(2), 106-113.
Istotskiy, V., & Protasev, V. (2019). Design and manufacture of hob mills for the formation of straight slots using the principles of screw backing. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 936-945.
Kopel, M., Löffler, C., & Pfeiffer, T. (2016). Sourcing strategies of a multi-input-multi-product firm. Journal of Economic Behavior & Organization, 127, 30-45.
Labro, E. (2004). The cost effects of component commonality: A literature review through a management-accounting lens, Manufacturing and Service Operations Management, 6(4), 358-367.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
Le Pape, N., & Wang, Y. (2020). Can product differentiation mitigate conflicts of interest between principal stakeholders? A cournot-bertrand comparison. Economic Modelling, 91, 341-346.
Lee, I.S., & Sung, C.S. (2008). Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186(3), 931-952.
Lim, S.-K. (2020). Sequential batching with minimum quantity commitment in N-level non-exclusive agglomerative hierarchical clustering structures. International Journal of Industrial Engineering Computations, 11(3), 317-340.
Moshtagh, M.S., & Taleizadeh, A.A. (2017). Stochastic integrated manufacturing and remanufacturing model with shortage, rework and quality based return rate in a closed loop supply chain. Journal of Cleaner Production, 141(10), 1548-1573.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Ngniatedema, T., Kamga, T.R.D., Fono, L.A., & Mbondo, G.D., Li, S. (2012). Postponement and international transfer in global supply chains, Journal of Operations Management, 30, 167-179.
Noman, M.A., Nasr, E.S.A., Al-Shayea, A., & Kaid, H. (2019). Overview of predictive condition based maintenance research using bibliometric indicators. Journal of King Saud University - Engineering Sciences, 31(4), 355-367.
Ortiz-Servin, J.J., Castillo, A., & Talavera, F. (2019). A new methodology to optimize operation cycles in a bwr using heuristic techniques. Journal of Applied Research and Technology, 17(3), 155-162.
Pearce, A., Pons, D., & Neitzert, T. (2018). Implementing lean - outcomes from SME case studies. Operations Research Perspectives, 5, 94-104.
Rao, A.S., & Singh, A.K. (2018). Failure analysis of stainless steel lanyard wire rope. Journal of Applied Research and Technology, 16(1), 35-40.
Sarker, B.R., Jamal, A.M.M., & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 184(3), 915-929.
Sheikh, S., Komaki, G.M., Kayvanfar, V., & Teymourian, E. (2019). Multi-Stage assembly flow shop with setup time and release time. Operations Research Perspectives, 6, Art. No. 100111, 1-15.
Sonntag, D., & Kiesmüller, G.P. (2018). Disposal versus rework– Inventory control in a production system with random yield. European Journal of Operational Research, 267(1), 138-149.
Tannady, H., Gunawan, E., Nurprihatin, F., & Wilujeng, F.R. (2019). Process improvement to reduce waste in the biggest instant noodle manufacturing company in South East Asia. Journal of Applied Engineering Science, 17(2), 203-212.
Vaid, M.K., & Arora, G. (2019). Quintic B-spline technique for numerical treatment of third order singular perturbed delay differential equation. International Journal of Mathematical, Engineering and Management Sciences, 4(6), 1471-1482.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.
Westphal, P., & Sohal, A. (2016). Outsourcing decision-making: does the process matter? Production Planning & Control, 27 (11), 894-908.
Zammori, F., Bertolini, M., & Mezzogori, D. (2020). A constructive algorithm to maximize the useful life of a mechanical system subjected to ageing, with non-resuppliable spares parts. International Journal of Industrial Engineering Computations, 11(1), 17-34.
Alvarez, L.H.R., & Stenbacka, R. (2007). Partial outsourcing: A real options perspective. International Journal of Industrial Organization, 25(1), 91-102.
Aringhieri, R., Duma, D., & Fragnelli, V. (2018). Modeling the rational behavior of individuals on an e-commerce system. Operations Research Perspectives, 5, 22-31.
Babu, K.V., Anuradha, B. (2020). Design of multi-band minkowski MIMO antenna to reduce the mutual coupling. Journal of King Saud University - Engineering Sciences, 32(1), 51-57.
Berrade, M.D., Scarf, P.A., & Cavalcante, C.A.V. (2017). A study of postponed replacement in a delay time model. Reliability Engineering & System Safety, 168, 70-79.
Calabria, R., & Pulcini, G. (1999). Discontinuous point processes for the analysis of repairable units. International Journal of Reliability, Quality and Safety Engineering, 6(4), 361-382.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical and Computational Applications, 21 (3), 1-17.
Chiu, Y-S.P., Lin, H-D., Wu, M-F., & Chiu, S.W. (2018). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations, 9(2), 235-248.
Chiu, S.W., Kuo, J-S., Chiu, Y-S.P., & Chang, H-H. (2019a). Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme. Jordan Journal of Mechanical & Industrial Engineering, 13(2), 105-115.
Chiu, Y-S.P., Chiu, V., Lin, H-D., & Chang, H-H. (2019b). Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance. Operations Research Perspectives, 6, Art. No. 100112, 1-8.
Chiu, Y-S.P., Chen, H-C., Chang, H-H., & Hwang, M-H. (2019c). Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework. International Journal of Industrial Engineering Computations, 10(4), 505-520.
Chiu, Y-S.P., Chiu, V., Wang, Y., & Hwang, M-H. (2020). A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. International Journal of Industrial Engineering Computations, 11(4), 509-524
Davis, T., & Sasser, M. (1995). Postponing product differentiation. Mechanical Engineering, 117(11), 105-107.
Hammado, N., Utomo, S., & Budiyono (2020). Characteristic lignocellulose of sago solid waste for biogas production. Journal of Applied Engineering Science, 18(2), 157-164.
Hines, P., & Rich, N. (1998). Outsourcing competitive advantage: the use of supplier associations. International Journal of Physical Distribution and Logistics Management, 28(7), 524-546.
Iqbal, A., Ahmad, S.A., & Ojasvi (2019). Appropriate selections of distillation column control variable to improve integrating material recycle response. Journal of King Saud University - Engineering Sciences, 31(2), 106-113.
Istotskiy, V., & Protasev, V. (2019). Design and manufacture of hob mills for the formation of straight slots using the principles of screw backing. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 936-945.
Kopel, M., Löffler, C., & Pfeiffer, T. (2016). Sourcing strategies of a multi-input-multi-product firm. Journal of Economic Behavior & Organization, 127, 30-45.
Labro, E. (2004). The cost effects of component commonality: A literature review through a management-accounting lens, Manufacturing and Service Operations Management, 6(4), 358-367.
Larkin, E.V., & Privalov, A.N. (2019). Engineering method of fault -tolerant system simulations. Journal of Applied Engineering Science, 17(3), 295-303.
Le Pape, N., & Wang, Y. (2020). Can product differentiation mitigate conflicts of interest between principal stakeholders? A cournot-bertrand comparison. Economic Modelling, 91, 341-346.
Lee, I.S., & Sung, C.S. (2008). Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186(3), 931-952.
Lim, S.-K. (2020). Sequential batching with minimum quantity commitment in N-level non-exclusive agglomerative hierarchical clustering structures. International Journal of Industrial Engineering Computations, 11(3), 317-340.
Moshtagh, M.S., & Taleizadeh, A.A. (2017). Stochastic integrated manufacturing and remanufacturing model with shortage, rework and quality based return rate in a closed loop supply chain. Journal of Cleaner Production, 141(10), 1548-1573.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Ngniatedema, T., Kamga, T.R.D., Fono, L.A., & Mbondo, G.D., Li, S. (2012). Postponement and international transfer in global supply chains, Journal of Operations Management, 30, 167-179.
Noman, M.A., Nasr, E.S.A., Al-Shayea, A., & Kaid, H. (2019). Overview of predictive condition based maintenance research using bibliometric indicators. Journal of King Saud University - Engineering Sciences, 31(4), 355-367.
Ortiz-Servin, J.J., Castillo, A., & Talavera, F. (2019). A new methodology to optimize operation cycles in a bwr using heuristic techniques. Journal of Applied Research and Technology, 17(3), 155-162.
Pearce, A., Pons, D., & Neitzert, T. (2018). Implementing lean - outcomes from SME case studies. Operations Research Perspectives, 5, 94-104.
Rao, A.S., & Singh, A.K. (2018). Failure analysis of stainless steel lanyard wire rope. Journal of Applied Research and Technology, 16(1), 35-40.
Sarker, B.R., Jamal, A.M.M., & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 184(3), 915-929.
Sheikh, S., Komaki, G.M., Kayvanfar, V., & Teymourian, E. (2019). Multi-Stage assembly flow shop with setup time and release time. Operations Research Perspectives, 6, Art. No. 100111, 1-15.
Sonntag, D., & Kiesmüller, G.P. (2018). Disposal versus rework– Inventory control in a production system with random yield. European Journal of Operational Research, 267(1), 138-149.
Tannady, H., Gunawan, E., Nurprihatin, F., & Wilujeng, F.R. (2019). Process improvement to reduce waste in the biggest instant noodle manufacturing company in South East Asia. Journal of Applied Engineering Science, 17(2), 203-212.
Vaid, M.K., & Arora, G. (2019). Quintic B-spline technique for numerical treatment of third order singular perturbed delay differential equation. International Journal of Mathematical, Engineering and Management Sciences, 4(6), 1471-1482.
Van Mieghem, J.A. (1999). Coordinating investment, production and subcontracting. Management Science, 45, 954-971.
Westphal, P., & Sohal, A. (2016). Outsourcing decision-making: does the process matter? Production Planning & Control, 27 (11), 894-908.
Zammori, F., Bertolini, M., & Mezzogori, D. (2020). A constructive algorithm to maximize the useful life of a mechanical system subjected to ageing, with non-resuppliable spares parts. International Journal of Industrial Engineering Computations, 11(1), 17-34.