Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Mauricio Iwama Takano

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (26)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
Financial performance(83)
Sustainability(81)
TOPSIS(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Genetic Algorithm(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(62)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2181)
Indonesia(1289)
Jordan(786)
India(786)
Vietnam(504)
Saudi Arabia(452)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(110)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A branch and bound method in a permutation flow shop with blocking and setup times Pages 255-266 Right click to download the paper Download PDF

Authors: Marcelo Seido Nagano, Mauricio Iwama Takano, João Vítor Silva Robazzi

DOI: 10.5267/j.ijiec.2021.10.003

Keywords: Scheduling, Permutation flow shop, Blocking, Setup, Total flow time, Total tardiness, Branch and bound

Abstract:
In this paper it is presented an improvement of the branch and bound algorithm for the permutation flow shop problem with blocking-in-process and setup times with the objective of minimizing the total flow time and tardiness, which is known to be NP-Hard when there are two or more machines involved. With that objective in mind, a new machine-based lower bound that exploits some structural properties of the problem. A database with 27 classes of problems, varying in number of jobs (n) and number of machines (m) was used to perform the computational experiments. Results show that the algorithm can deal with most of the problems with less than 20 jobs in less than one hour. Thus, the method proposed in this work can solve the scheduling of many applications in manufacturing environments with limited buffers and separated setup times.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 2 | Views: 1378 | Reviews: 0

 
2.

Solving the permutation flow shop problem with blocking and setup time constraints Pages 469-480 Right click to download the paper Download PDF

Authors: Mauricio Iwama Takano, Marcelo Seido Nagano

DOI: 10.5267/j.ijiec.2019.11.002

Keywords: Scheduling, Flow shop, Blocking, Setup time constraints, Mixed-integer programming model, Iterated Greedy

Abstract:
In this paper, the flow shop with blocking and sequence and machine dependent setup time problem aiming to minimize the makespan is studied. Two mixed-integer programming models are proposed (TNZBS1 and TNZBS2) and two other mixed-integer programming models, originally proposed for the no setup problem, are adapted to the problem. Furthermore, an Iterated Greedy algorithm is proposed for the problem. The permutation flow shop with blocking and sequence and machine dependent setup time is an underexplored problem and the authors did not find the use of mixed-integer programming models for the problem in any other work. To compare the models, a database of 80 problems was generated, which vary in number of machines and jobs. For the small sized problems, the adapted MILP model obtained the best results. However, for bigger problems, both proposed MILP models obtained significantly better results compared to the adapted models, proving the efficiency of the new models. When comparing the Iterated Greedy algorithm with the MILP models, the former outperformed the latter.

Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1598 | Reviews: 0

 
3.

Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times Pages 37-50 Right click to download the paper Download PDF

Authors: Mauricio Iwama Takano, Marcelo Seido Nagano

DOI: 10.5267/j.ijiec.2018.5.002

Keywords: Flow shop, Blocking, Zero buffer, Setup times, Makespan, Heuristics

Abstract:
This paper addresses the minimization of makespan for the permutation flow shop scheduling problem with blocking and sequence and machine dependent setup times, a problem not yet studied in previous studies. The 14 best known heuristics for the permutation flow shop problem with blocking and no setup times are pre-sented and then adapted to the problem in two different ways; resulting in 28 different heuristics. The heuristics are then compared using the Taillard database. As there is no other work that addresses the problem with blocking and sequence and ma-chine dependent setup times, a database for the setup times was created. The setup time value was uniformly distributed between 1% and 10%, 50%, 100% and 125% of the processing time value. Computational tests are then presented for each of the 28 heuristics, comparing the mean relative deviation of the makespan, the computational time and the percentage of successes of each method. Results show that the heuristics were capable of providing interesting results.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 1 | Views: 2172 | Reviews: 0

 

® 2010-2026 GrowingScience.Com