Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Critical path

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Critical paths of non-permutation and permutation flow shop scheduling problems Pages 281-298 Right click to download the paper Download PDF

Authors: Daniel Alejandro Rossit, Fernando Tohmé, Mariano Frutos, Martín Safe, Óscar C. Vásquez

DOI: 10.5267/j.ijiec.2019.8.001

Keywords: Non-permutation flow shop, Scheduling, Makespan, Critical path

Abstract:
The literature on flow shop scheduling has extensively analyzed two classes of problems: permutation and non-permutation ones (PFS and NPFS). Most of the papers in this field have been just devoted on comparing the solutions obtained in both approaches. Our contribution consists of analyzing the structure of the critical paths determining the makespan of both kinds of schedules for the case of 2 jobs and m machines. We introduce a new characterization of the critical paths of PFS solutions as well as a decomposition procedure, yielding a representation of NPFS solutions as sequences of partial PFS ones. In structural comparisons we find cases in which NPFS solutions are dominated by PFS solutions. Numerical comparisons indicate that a wider dispersion of processing times improves the chances of obtaining optimal non-permutation schedules, in particular when this dispersion affects only a few machines.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 2 | Views: 2141 | Reviews: 0

 

® 2010-2026 GrowingScience.Com