Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Meenakshi Sharma

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

An improved NEH heuristic to minimize makespan for flow shop scheduling problems Pages 311-322 Right click to download the paper Download PDF

Authors: Meenakshi Sharma, Manisha Sharma, Sameer Sharma

DOI: 10.5267/j.dsl.2021.2.006

Keywords: Scheduling, Flow shop, Makespan, Heuristic, Processing time

Abstract:
Flow shop scheduling problems with rudimentary criteria of minimum makespan are the most important investigated problems in the field of scheduling. Generally during the process of generating an optimal sequence, multiple partial sequences claiming the optimal value of makespan are observed. In this paper a novel tie-breaking rule to select one of the best optimal sequences out of all possible partial sequences is developed which then applied to Nawaz-Enscore-Ham (NEH) heuristic to solve the scheduling problems in permutation flowshop without increasing the computational complexity. The performance of proposed heuristic is tested with other existing tie-breaking heuristics of similar complexity over Taillard and VRF's instances. Computational results reveal that in terms of solution quality, the proposed heuristic outperforms over the other NEH based heuristics of the same complexity reported in literature.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: DSL | Year: 2021 | Volume: 10 | Issue: 3 | Views: 2004 | Reviews: 0

 

® 2010-2026 GrowingScience.Com