Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations

Journals

  • IJIEC (697)
  • MSL (2637)
  • DSL (631)
  • CCL (482)
  • USCM (1092)
  • ESM (398)
  • AC (547)
  • JPM (228)
  • IJDS (809)
  • JFS (81)

IJIEC Volumes

    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 3 (76)
      • Issue 1 (9)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 16 (46)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)

Keywords

Supply chain management(158)
Jordan(154)
Vietnam(147)
Customer satisfaction(119)
Performance(112)
Supply chain(106)
Service quality(95)
Tehran Stock Exchange(94)
Competitive advantage(92)
SMEs(85)
optimization(83)
Financial performance(81)
Job satisfaction(78)
Factor analysis(78)
Trust(78)
Knowledge Management(76)
Genetic Algorithm(75)
Sustainability(73)
Social media(73)
TOPSIS(73)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(53)
Endri Endri(44)
Muhammad Alshurideh(40)
Hotlan Siagian(36)
Jumadil Saputra(35)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Dmaithan Almajali(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Ahmad Makui(30)
Basrowi Basrowi(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Prasadja Ricardianto(28)
Sulieman Ibraheem Shelash Al-Hawary(27)
Haitham M. Alzoubi(27)
Ali Harounabadi(26)


» Show all authors

Countries

Iran(2155)
Indonesia(1217)
India(768)
Jordan(731)
Vietnam(494)
Malaysia(418)
Saudi Arabia(411)
United Arab Emirates(210)
China(151)
Thailand(149)
United States(103)
Turkey(98)
Ukraine(97)
Egypt(90)
Canada(83)
Pakistan(81)
Peru(75)
United Kingdom(73)
Nigeria(73)
Morocco(67)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

A hybrid genetic-gravitational search algorithm for a multi-objective flow shop scheduling problem Pages 331-348 Right click to download the paper Download PDF

Authors: T.S. Lee, Y.T. Loong, S.C. Tan

DOI: 10.5267/j.ijiec.2019.2.004

Keywords: Dispatching rules, Multi-objective flow shop scheduling, Genetic algorithm, Gravitational Search algorithm

Abstract:
Many real-world problems in manufacturing system, for instance, the scheduling problems, are formulated by defining several objectives for problem solving and decision making. Recently, research on dispatching rules allocation has attracted substantial attention. Although many dispatching rules methods have been developed, multi-objective scheduling problems remain inherently difficult to solve by any single rule. In this paper, a hybrid genetic-based gravitational search algorithm (GSA) in weighted dispatching rule is proposed to tackle a scheduling problem by achieving both time and job-related objectives. Genetic algorithm (GA) is used to select two appropriate dispatching rules to combine as a weighted multi-attribute function, while the GSA is used to optimize the contribution weightage of each rule in each stage of the flow shop. The results show that the proposed algorithm is significantly better than the traditional dispatching rules and the rules allocation algorithm. The proposed algorithm not only improved the quality of the schedule in multi-objective problems but also maintained the advantages of traditional dispatching rules in terms of ease of implementation.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 1873 | Reviews: 0

 
2.

Firefly algorithm based upon slicing structure encoding for unequal facility layout problem Pages 349-360 Right click to download the paper Download PDF

Authors: G. La Scalia, R. Micale, A. Giallanza, G. Marannano

DOI: 10.5267/j.ijiec.2019.2.003

Keywords: Unequal Area-Facility Layout Problem, Firefly Algorithm, Slicing Structure

Abstract:
Finding the locations of departments or machines in a workspace is classified as a Facility Layout Problem. Good placement of departments has a relevant influence on manufacturing costs, work in process, lead times and production efficiency. This paper analyses the problem of allocating departments with restrictions in terms of unequal area and rectangular shape within a facility, in order to minimize the sum of material handling costs taking into account the satisfaction of the aspect ratio requested. In particular, we propose for the first time a Firefly Algorithm based on the slicing structure encoding. The proposed method was tested comparing the results obtained from other authors on the same literature instance. The results confirm the effectiveness of the Firefly Algorithm in solving the Facility Layout Problem by generating the best solutions with respect to those provided by previous researches.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 1680 | Reviews: 0

 
3.

A hybrid algorithm for the multi-depot vehicle scheduling problem arising in public transportation Pages 361-374 Right click to download the paper Download PDF

Authors: César Augusto Marín Moreno, Luis Miguel Escobar Falcón, Rubén Iván Bolaños, Anand Subramanian, Antonio Hernando Escobar Zuluaga, Mauricio Granada Echeverri

DOI: 10.5267/j.ijiec.2019.2.002

Keywords: Vehicle Scheduling, Matheuristics, Set Partitioning, Tactical Planning, Bus Rapid Transit

Abstract:
In this article, a hybrid algorithm is proposed to solve the Vehicle Scheduling Problem with Multiple Depots. The proposed methodology uses a genetic algorithm, initialized with three specialized constructive procedures. The solution generated by this first approach is then refined by means of a Set Partitioning (SP) model, whose variables (columns) correspond to the current itineraries of the final population. The SP approach possibly improves the incumbent solution which is then provided as an initial point to a well-known MDVSP model. Both the SP and MDVSP models are solved with the help of a mixed integer programming (MIP) solver. The algorithm is tested in benchmark instances consisting of 2, 3 and 5 depots, and a service load ranging from 100 to 500. The results obtained showed that the proposed algorithm was capable of finding the optimal solution in most cases when considering a time limit of 500 seconds. The methodology is also applied to solve a real-life instance that arises in the transportation system in Colombia (2 depots and 719 services), resulting in a decrease of the required fleet size and a balanced allocation of services, thus reducing deadhead trips.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 2252 | Reviews: 0

 
4.

Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study Pages 375-392 Right click to download the paper Download PDF

Authors: Andres Muñoz-Villamizar, Javier Santos, Jairo Montoya-Torres, Maria Jesus Alvaréz

DOI: 10.5267/j.ijiec.2019.2.001

Keywords:

Abstract:
This paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing productivity. We defined a mixed-integer linear programming formulation of the parallel machine scheduling problem with four different objective functions in order to compare different scheduling configurations. Real data, from a plastic container manufacturing company located in the Basque Country (Spain), were used to validate this approach. A sensitivity analysis was performed with different production capacities and earliness/tardiness costs in order to evaluate the trade-offs between economic performance (i.e., costs) and the partial rates of OEE (i.e., quality, performance and availability). The objective of this study is to propose a guideline to help management make decisions regarding the measurement and improvement of scheduling effectiveness through contemplating earliness, tardiness and variable setup times.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 2630 | Reviews: 0

 
5.

Consolidation centers in city logistics: A cooperative approach based on the location routing problem Pages 393-404 Right click to download the paper Download PDF

Authors: Sachin Nataraj, Daniele Ferone, Carlos Quintero-Araujo, Angel A. Juan, Paola Festa

DOI: 10.5267/j.ijiec.2019.1.001

Keywords: Location Routing Problem, Vehicle Routing Problem, Metaheuristics, Urban Consolidation Center, Biased Randomization, Horizontal Cooperation

Abstract:
In the context of city logistics, freight transportation is one of the prominent causes of traffic congestion, high levels of pollution, and safety concerns. To decrease the negative impact of these issues, different methods have been traditionally implemented. On the one hand, the location of urban consolidation Centers (UCCs) near a city can be used to consolidate freight delivery services. Therefore, the number of trucks moving in urban areas can be reduced. On the other hand, Horizontal Cooperation can also help to reduce environmental impact while increasing service level. This paper combines both strategies, that is, we deal with the location of UCCs and, simultaneously, we analyze different scenarios where the players of different supply chain processes exhibit various levels of cooperation. Thus, different levels of cooperations regarding routing and UCCs-location decisions are considered in the following scenarios: (a) non-cooperative case, in which all decisions are decentralized (i.e., each enterprise solves its own vehicle routing problem); (b) low-cooperative case, where depot capacities are shared but the customers are still being served by each company's fleet of vehicles; (c) semi-cooperative case, based on centralized route planning decisions (i.e. facilities and fleets are shared among participating enterprises); and (d) fully cooperative scenario, where the routing plans and facility-location decisions are taken by consensus amongst all the participants. In order to estimate the benefits of both strategies, we propose a flexible metaheuristic algorithm to deal with the combined location and routing problem under the different cooperative scenarios. Our results show impressive benefits of the proposed approach.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 4342 | Reviews: 0

 
6.

Estimating travel times in dual shuttle AS/RSs.: A revised approach Pages 405-420 Right click to download the paper Download PDF

Authors: Maurizio Schenone, Giulio Mangano, Sabrina Grimaldi, Anna Corinna Cagliano

DOI: 10.5267/j.ijiec.2018.12.002

Keywords:

Abstract:
Automated Storage and Retrieval Systems (AS/RSs) effectively support warehouse operations in order to increase production and logistics efficiency. Literature about travel time computation in multi-shuttle AS/RSs still needs to be enhanced since most of the existing contributions rely on the same formulation, namely the Meller and Mungwattana’s equation. Based on well-established theoretical assumptions and on a simulation model, the present work puts forward a revised version of the Meller and Mungwattana’s formula for dual shuttle systems. In particular, the constant factor multiplying the travel between time is replaced by a coefficient depending on the rack configuration and on the input and output points of the storage system. The new equation is tested against widely applied models for AS/RS travel time calculation and proves to result in shorter times than the original Meller and Mungwattana’s equation. A linear regression analysis is completed in order to find a numerical formulation of the proposed coefficient. Taking into account some key physical characteristics of a warehouse while estimating travel times allows improving the design and management of storage areas. Future research will focus on deepening multi-shuttle travel time calculation by addressing crane acceleration and deceleration, different rack and crane configurations, as well as class-based storage.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 1617 | Reviews: 0

 
7.

A study of a kanban based assembly line feeding system through integration of simulation and particle swarm optimization Pages 421-442 Right click to download the paper Download PDF

Authors: Kaustav Kundu, Matteo Rossini, Alberto Portioli-Staudacher

DOI: 10.5267/j.ijiec.2018.12.001

Keywords: Kanban, Assembly line, Simulation, Optimization, Supermarket, Part feeding

Abstract:
With increase in differentiation and decreasing batch size of products, feeding the assembly line at regular intervals is considered to be a critical problem in today’s manufacturing sector. Yet no clear solution has been developed for this problem; therefore, the main focus of this research is to discuss the different aspects of line feeding, the latest trend in literature, and to propose an innovative method to support solving the problem. A discrete event simulation model is developed and a mathematical model based on particle swarm optimization is used to support the simulation. The hybrid model is finally applied to practical situations. Results show how different settings of kanban influence the performance of the assembly line feeding system. The biggest novelty item is certainly the recognition of the trade-off between kanban size and number of kanban and the importance of investigating its behaviour during the design of the system.
Details
  • 68
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 3680 | Reviews: 0

 
8.

Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps Pages 443-452 Right click to download the paper Download PDF

Authors: Singa Wang Chiu, Yi-Jing Huang, Yuan-Shyi Peter Chiu, Tiffany Chiu

DOI: 10.5267/j.ijiec.2018.11.001

Keywords: Multiproduct inventory system, The most economic common cycle time, Expedited fabrication rate, Finite production rate, Random scrap

Abstract:
Facing stiff competition in worldwide markets, capability of meeting timely demands of multiproduct and satisfying customer’s desired product quality are essential to present-day manufacturers. Motivated by achieving the aforementioned goals, this research intends to find most economic common cycle length for a multiproduct finite production rate (FPR)-based inventory system, wherein, imperfect production process with expedited fabrication rate and random scrap is assumed. Extra setup and unit costs are associated with the adjusted rate, and imperfect products are screened and scrapped. A mathematical model is cautiously constructed to examine and resolve the problem. A numerical illustration is employed to exhibit the applicability of the proposed method. Except finding the most economic common cycle time for the problem, core contribution of this study also is associated with the individual and combined impact(s) of important factors to the problem, and hence, enabling management of manufacturing firms to make efficient/cost-effective decision and gain competitive advantages.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 1726 | Reviews: 0

 

® 2010-2025 GrowingScience.Com