How to cite this paper
Chiu, Y., Lin, H., Wu, M & Chiu, S. (2018). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system.International Journal of Industrial Engineering Computations , 9(2), 235-248.
Refrences
Aliyu, M.D.S., & Andijani, A.A. (1999). Multi-item-multi-plant inventory control of production systems with shortages/backorders. International Journal of Systems Science, 30(5), 533-539.
Archetti, C., Doerner, K.F., & Tricoire, F. (2013). A heuristic algorithm for the free newspaper delivery problem. European Journal of Operational Research, 230(2), 245-257.
Balaji, M., Velmurugan, V., & Subashree, C. (2015). TADS: An assessment methodology for agile supply chains. Journal of Applied Research and Technology, 13(5), 504-509.
Bernstein, F., DeCroix, G.A., & Wang, Y. (2011). The impact of demand aggregation through delayed component allocation in an assemble-to-order system. Management Science, 57(6), 1154-1171.
Boorla, S.M., & Howard, T.J. (2016). Production monitoring system for understanding product robustness. Advances in Production Engineering & Management, 11(3), 159-172.
Caggiano, K.E., Jackson, P.L., Muckstadt, J.A., & Rappold, J.A. (2009). Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization. European Journal of Operational Research, 199(3), 744-749.
Chiu, S.W., Huang, C-C., Chiang, K-W., & Wu, M-F. (2015). On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance. SpringerPlus, 4(1), article number 687, 1-11.
Chiu, Y-S.P., Kuo, J-S., Chiu, S. W., & Hsieh, Y-T. (2016a). Effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.
Chiu, Y-S.P., Chiang, K-W., Chiu, S.W., & Song, M-S. (2016b). Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process. Advances in Production Engineering & Management, 11(2), 141-151.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016c). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical & Computational Applications, 21(3), article number 38.
Collier, D.A. (1982). Aggregate safety stock levels and component part commonality. Management Science, 28(11), 1296-1303.
Fergany, H.A. (2016). Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions. SpringerPlus, 5(1), article number 1351.
Ferreira, K.A., Tomas, R.N., & Alcântara, R.L.C. (2015). A theoretical framework for postponement concept in a supply chain. International Journal of Logistics Research & Applications, 18(1), 46-61.
Gerchak, Y., & Henig, M. (1986). An inventory model with component commonality. Operations Research Letters, 5(3), 157-160.
Gómez, J., Salazar, I., & Vargas, P. (2016). Sources of information as determinants of product and process innovation. PLoS ONE, 11(4), article number e0152743.
Graman, G.A., & Magazine, M.J. (2002). A numerical analysis of capacitated postponement, Production & Operations Management, 11(3), 340-356.
Graman, G.A., & Magazine, M.J. (2006). Implementation issues influencing the decision to adopt postponement. International Journal of Operations & Production Management, 26(10), 1068-1083.
Guerrero, W.J., Yeung, T.G., & Guéret, C. (2013). Joint-optimization of inventory policies on a multi-product multi-echelon pharmaceutical system with batching and ordering constraints, European Journal of Operational Research, 231(1), 98-108.
Gupta, D., & Benjaafar, S. (2004). Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis. IIE Transactions, 36(6), 529-546.
Henig, M., & Gerchak, Y. (1990). Structure of periodic review policies in the presence of random yield. Operations Research, 38(4), 634-643.
Hillier, F.S., & Lieberman, G.J. (2001). Introduction to Operations Research, McGraw Hill: New York.
Jawla, P., & Singh, S.R. (2016). Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment. International Journal of Industrial Engineering Computations, 7(4), 703-716.
Karunambigai S, Geetha K, & Shabeer HA. (2015). Power Quality Improvement of Grid Connected Solar System. Journal of Scientific & Industrial Research, 74(6), 354-357.
Kundu, S., & Chakrabarti, T. (2015). An integrated multi-stage supply chain inventory model with imperfect production process. International Journal of Industrial Engineering Computations, 6(4), 565-580.
Lee, H.L. (1996). Effective inventory and service management through product and process redesign. Operations Research, 44(1), 151-159.
Ma, W-N., Gong, D-C., & Lin, G.C. (2010). An optimal common production cycle time for imperfect production processes with scrap. Mathematical & Computer Modelling, 52(5-6), 724-737.
Nahmias, S. (2009). Production & Operations Analysis, McGraw-Hill Inc, New York.
Rahim, M.A., & Ben-Daya, M. (2001). Joint determination of production quantity, inspection schedule and quality control for imperfect process with deteriorating products. Journal of the Operational Research Society, 52(12), 1370-1378.
Rardin, R.L. (1998). Optimization in Operations Research, Prentice-Hall, New Jersey.
Reimann, M. (2012). Accurate response by postponement. European Journal of Operational Research, 220(3), 619-628.
Rosenblatt, M.J., & Rothblum, U.G. (1990).On the single resource capacity problem for multi-item inventory systems. Operations Research, 38(4), 686-693.
Sarker, B.R., & Parija, G.R. (1994). An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society, 45(8), 891–900.
Schwarz, L.B., Deuermeyer, B.L., & Badinelli, R.D. (1985). Fill-rate optimization in a one- warehouse N-identical retailer distribution system. Management Science, 31(4), 488-498.
Swaminathan, J.M., & Tayur, S.R. (1998). Managing broader product lines through delayed differentiation using vanilla boxes. Management Science, 44(12), S161-S172.
Swaminathan, J.M., & Tayur, S.R. 1999. Managing design of assembly sequences for product lines that delay product differentiation. IIE Transactions, 31(11), 1015-1026.
Thomas, D.J., & Hackman, S.T. (2003). A committed delivery strategy with fixed frequency and quantity. European Journal of Operational Research, 148(2), 363-373.
Weber, T.A. (2008). Delayed multiattribute product differentiation. Decision Support Systems. 44(2), 447-468.
Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., & Halim, A.H. (2016). Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint. International Journal of Industrial Engineering Computations, 7(2), 229-24.
Archetti, C., Doerner, K.F., & Tricoire, F. (2013). A heuristic algorithm for the free newspaper delivery problem. European Journal of Operational Research, 230(2), 245-257.
Balaji, M., Velmurugan, V., & Subashree, C. (2015). TADS: An assessment methodology for agile supply chains. Journal of Applied Research and Technology, 13(5), 504-509.
Bernstein, F., DeCroix, G.A., & Wang, Y. (2011). The impact of demand aggregation through delayed component allocation in an assemble-to-order system. Management Science, 57(6), 1154-1171.
Boorla, S.M., & Howard, T.J. (2016). Production monitoring system for understanding product robustness. Advances in Production Engineering & Management, 11(3), 159-172.
Caggiano, K.E., Jackson, P.L., Muckstadt, J.A., & Rappold, J.A. (2009). Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization. European Journal of Operational Research, 199(3), 744-749.
Chiu, S.W., Huang, C-C., Chiang, K-W., & Wu, M-F. (2015). On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance. SpringerPlus, 4(1), article number 687, 1-11.
Chiu, Y-S.P., Kuo, J-S., Chiu, S. W., & Hsieh, Y-T. (2016a). Effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.
Chiu, Y-S.P., Chiang, K-W., Chiu, S.W., & Song, M-S. (2016b). Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process. Advances in Production Engineering & Management, 11(2), 141-151.
Chiu, S.W., Kuo, J-S., Chiu, V., & Chiu, Y-S.P. (2016c). Cost minimization for a multi-product fabrication-distribution problem with commonality, postponement, and quality assurance. Mathematical & Computational Applications, 21(3), article number 38.
Collier, D.A. (1982). Aggregate safety stock levels and component part commonality. Management Science, 28(11), 1296-1303.
Fergany, H.A. (2016). Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions. SpringerPlus, 5(1), article number 1351.
Ferreira, K.A., Tomas, R.N., & Alcântara, R.L.C. (2015). A theoretical framework for postponement concept in a supply chain. International Journal of Logistics Research & Applications, 18(1), 46-61.
Gerchak, Y., & Henig, M. (1986). An inventory model with component commonality. Operations Research Letters, 5(3), 157-160.
Gómez, J., Salazar, I., & Vargas, P. (2016). Sources of information as determinants of product and process innovation. PLoS ONE, 11(4), article number e0152743.
Graman, G.A., & Magazine, M.J. (2002). A numerical analysis of capacitated postponement, Production & Operations Management, 11(3), 340-356.
Graman, G.A., & Magazine, M.J. (2006). Implementation issues influencing the decision to adopt postponement. International Journal of Operations & Production Management, 26(10), 1068-1083.
Guerrero, W.J., Yeung, T.G., & Guéret, C. (2013). Joint-optimization of inventory policies on a multi-product multi-echelon pharmaceutical system with batching and ordering constraints, European Journal of Operational Research, 231(1), 98-108.
Gupta, D., & Benjaafar, S. (2004). Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis. IIE Transactions, 36(6), 529-546.
Henig, M., & Gerchak, Y. (1990). Structure of periodic review policies in the presence of random yield. Operations Research, 38(4), 634-643.
Hillier, F.S., & Lieberman, G.J. (2001). Introduction to Operations Research, McGraw Hill: New York.
Jawla, P., & Singh, S.R. (2016). Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment. International Journal of Industrial Engineering Computations, 7(4), 703-716.
Karunambigai S, Geetha K, & Shabeer HA. (2015). Power Quality Improvement of Grid Connected Solar System. Journal of Scientific & Industrial Research, 74(6), 354-357.
Kundu, S., & Chakrabarti, T. (2015). An integrated multi-stage supply chain inventory model with imperfect production process. International Journal of Industrial Engineering Computations, 6(4), 565-580.
Lee, H.L. (1996). Effective inventory and service management through product and process redesign. Operations Research, 44(1), 151-159.
Ma, W-N., Gong, D-C., & Lin, G.C. (2010). An optimal common production cycle time for imperfect production processes with scrap. Mathematical & Computer Modelling, 52(5-6), 724-737.
Nahmias, S. (2009). Production & Operations Analysis, McGraw-Hill Inc, New York.
Rahim, M.A., & Ben-Daya, M. (2001). Joint determination of production quantity, inspection schedule and quality control for imperfect process with deteriorating products. Journal of the Operational Research Society, 52(12), 1370-1378.
Rardin, R.L. (1998). Optimization in Operations Research, Prentice-Hall, New Jersey.
Reimann, M. (2012). Accurate response by postponement. European Journal of Operational Research, 220(3), 619-628.
Rosenblatt, M.J., & Rothblum, U.G. (1990).On the single resource capacity problem for multi-item inventory systems. Operations Research, 38(4), 686-693.
Sarker, B.R., & Parija, G.R. (1994). An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society, 45(8), 891–900.
Schwarz, L.B., Deuermeyer, B.L., & Badinelli, R.D. (1985). Fill-rate optimization in a one- warehouse N-identical retailer distribution system. Management Science, 31(4), 488-498.
Swaminathan, J.M., & Tayur, S.R. (1998). Managing broader product lines through delayed differentiation using vanilla boxes. Management Science, 44(12), S161-S172.
Swaminathan, J.M., & Tayur, S.R. 1999. Managing design of assembly sequences for product lines that delay product differentiation. IIE Transactions, 31(11), 1015-1026.
Thomas, D.J., & Hackman, S.T. (2003). A committed delivery strategy with fixed frequency and quantity. European Journal of Operational Research, 148(2), 363-373.
Weber, T.A. (2008). Delayed multiattribute product differentiation. Decision Support Systems. 44(2), 447-468.
Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., & Halim, A.H. (2016). Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint. International Journal of Industrial Engineering Computations, 7(2), 229-24.