How to cite this paper
Chiu, Y., Chen, H., Chang, H & Hwang, M. (2019). Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework.International Journal of Industrial Engineering Computations , 10(4), 505-520.
Refrences
Afshar-Nadjafi, B., & Afshar-Nadjafi, A. (2017). A constructive heuristic for time-dependent multi- depot vehicle routing problem with time-windows and heterogeneous fleet. Journal of King Saud University - Engineering Sciences, 29(1), 29-34.
Balaji, M., Velmurugan, V., Prapa, M., & Mythily, V. (2016). A fuzzy approach for modeling and design of agile supply chains using interpretive structural modeling. Jordan Journal of Mechanical and Industrial Engineering, 10(1), 67-74.
Bolaños, R.I., Escobar, J.W., & Echeverri, M.G. (2018). A metaheuristic algorithm for the multi-depot vehicle routing problem with heterogeneous fleet. International Journal of Industrial Engineering Computations, 9(4), 461-478.
Banerjee, A., & Banerjee, S. (1994). A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. International Journal of Production Economics, 35, 85-91.
Beladi, H., & Mukherjee, A. (2012). Market structure and strategic bi-sourcing. Journal of Economic Behavior & Organization, 82(1), 210-219.
Berggren, C., & Bengtsson, L. (2004). Rethinking Outsourcing in Manufacturing: A Tale of Two Telecom Firms. European Management Journal, 22(2), 211-223.
Buckova, M., Krajcovic, M., & Jerman, B. (2017). Impact of digital factory tools on designing of warehouses. Journal of Applied Engineering Science, 15(2), 173-180.
Cachon, G.P., & Harker, P.T. (2002). Competition and outsourcing with scale economies. Management Science, 48(10), 1314-1333.
Chakravarty, A.K. (2017). Offshore outsourcing and ownership of facilities with productivity concerns. IISE Transactions, 49(6), 642-651.
Chiu, Y-S.P., Hsieh, Y-T., Kuo, J-S., & Chiu, S.W. (2016a). A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy–I: Using single-machine production scheme. International Journal for Engineering Modelling, 29(1-4), 37-52.
Chiu, S.W., Hsieh, Y-T., Chiu, Y-S.P., & Hwang, M-H. (2016b). A delayed differentiation multi- product FPR model with scrap and a multi-delivery policy–II: Using two-machine production scheme. International Journal for Engineering Modelling, 29(1-4), 53-68.
Chiu, S.W., Liu, C-J., Li, Y-Y., & Chou, C-L. (2017a). Manufacturing lot size and product distribution problem with rework, outsourcing and discontinuous inventory distribution policy. International Journal for Engineering Modelling, 30(1-4), 49-61.
Chiu, Y-S.P., Liu, C-J., & Hwang, M-H. (2017b). Optimal batch size considering partial outsourcing plan and rework. Jordan Journal of Mechanical and Industrial Engineering, 11(3), 195-200.
Chiu, Y-S.P., Lin, H-D., Wu, M-F., & Chiu, S.W. (2018a). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations, 9(2), 235-248.
Çömez, N., Stecke, K.E., & Çakanyildirim, M. (2012). Multiple in-cycle transshipments with positive delivery times. Production and Operations Management, 21(2), 378-395.
Federgruen, A., Meissner, J., & Tzur, M. (2007). Progressive interval heuristics for multi-item capacitated lot-sizing problems. Operations Research, 55(3), 490-502.
Fera, M., Fruggiero, F., Lambiase, A., Macchiaroli, R., & Miranda, S. (2017). The role of uncertainty in supply chains under dynamic modeling. International Journal of Industrial Engineering Computations, 8(1), 119-140.
Fergany, H.A. (2016). Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions. SpringerPlus, 5(1), art. no. 1351.
Florea Ionescu, A.I., Corboş, R-A., Popescu, R.I., & Zamfir, A. (2016). From the factory floor to the shop floor – improved supply chain for sustainable competitive advantage with item-level RFID in retail. Economic Computation and Economic Cybernetics Studies and Research, 50(4), 119-134.
Giri, B.C., & Roy, B. (2013). A vendor-buyer integrated production-inventory model with quantity discount and unequal sized shipments. International Journal of Operational Research, 16(1), 1-13.
Groenevelt, H., Pintelon, L., & Seidmann, A. (1992). Production lot sizing with machine breakdowns. Management Sciences, 38, 104-123.
Grosfeld-Nir, A., & Gerchak, Y. (2002). Multistage production to order with rework capability. Management Science, 48(5), 652-664.
Güder, F., & Zydiak, J.L. (1997). Non-stationary ordering policies for multi-item inventory systems subject to a single resource constraint and quantity discounts. Computers and Operations Research, 24(1), 61-71.
Kaylani, H., Almuhtady, A., & Atieh, A.M. (2016). Novel approach to enhance the performance of production systems using lean tools. Jordan Journal of Mechanical and Industrial Engineering, 10(3), 215-229.
Kohli, R., & Park, H. (1994). Coordinating buyer-seller transactions across multiple products. Management Science, 40(9), 45-50.
Korgaonker, M.G. (1979). Integrated production inventory policies for multistage multiproduct batch production systems. Journal of the Operational Research Society, 30(4), 355-362.
Lee, D-H., Lim, S-K., Lee, G-C., Jun, H-B., & Kim, Y-D. (1997). Multi-period part selection and loading problems in flexible manufacturing systems. Computers & Industrial Engineering, 33(3-4), 541-544.
Mendelson, H., & Parlaktürk, A.K. (2008). Product-line competition: Customization vs. proliferation. Management Science, 54(12), 2039-2053.
Mokhtari, H., & Abadi, I.N.K. (2013). Scheduling with an outsourcing option on both manufacturer and subcontractors. Computers & Operations Research, 40(5), 1234-1242.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nourelfath, M. (2011). Service level robustness in stochastic production planning under random machine breakdowns. European Journal of Operational Research, 212(1), 81-88.
Raj, V., & Prabha, G. (2016). Synthesis, characterization and in vitro drug release of cisplatin loaded Cassava starch acetate–PEG/gelatin nanocomposites. Journal of the Association of Arab Universities for Basic and Applied Sciences, 21, 10-16.
Rardin, R.L. (1998). Optimization in Operations Research. Prentice-Hall, New Jersey.
Razmi, J., Kazerooni, M.P., & Sangari, M.S. (2016). Designing an integrated multi-echelon, multi-product and multi-period supply chain network with seasonal raw materials. Economic Computation and Economic Cybernetics Studies and Research, 50(1), 273-290.
Regti, A., El Kassimi, A., Laamari, M.R., & El Haddad, M. (2017). Competitive adsorption and optimization of binary mixture of textile dyes: A factorial design analysis. Journal of the Association of Arab Universities for Basic and Applied Sciences, 24, 1-9.
Rodado, D.N., Escobar, J.W., García-Cáceres, R.G., & Niebles Atencio, F.A. (2017). A mathematical model for the product mixing and lot-sizing problem by considering stochastic demand. International Journal of Industrial Engineering Computations, 8(2), 237-250.
Saari, J., & Odelius, J. (2018). Detecting operation regimes using unsupervised clustering with infected group labelling to improve machine diagnostics and prognostics. Operations Research Perspectives, 5, 232-244.
Settanni, E., Harrington, T.S., & Srai, J.S. (2017). Pharmaceutical supply chain models: A synthesis from a systems view of operations research. Operations Research Perspectives, 4, 74-95.
Sultana, B., & Mustafa, M.W. (2017). Distribution system loss minimization with network reconfiguration and cost-benefit price based demand reduction modeling. Journal of Engineering Research, 5(1), 140-162.
Sucky, E. (2004). Coordinated order and production policies in supply chains. OR Spectrum, 26(4), 493-520.
Tamura, T. (1988) Solution procedure for the multi-item and multi-stage production planning problem. Transactions of the Japan Society of Mechanical Engineers, Part C, 54(504), 1974-1982.
Taleizadeh, A.A., Jalali-Naini, S.G., Wee, H-M., & Kuo, T-C. (2013). An imperfect multi-product production system with rework. Scientia Iranica 20(3), 811-823.
Thomas D.J., & Hackman S.T. (2003). A committed delivery strategy with fixed frequency and quantity. European Journal of Operational Research, 148(2), 363-373.
Ueno, N., Okuhara, K., Ishii, H., Shibuki, H., & Kuramoto, T. (2007). Multi-item production planning and management system based on unfulfilled order rate in supply chain. Journal of the Operations Research Society of Japan, 50(3), 201-218.
Vishwakarma, A., Kumar, A., & Singh, G.K. (2017). Design of near-perfect-reconstructed transmultiplexer using different modulation techniques: A comparative study. Journal of King Saud University - Engineering Sciences, 29(3), 257-263.
Vujosevic, M., Makajic-Nikolic, D., & Pavlovic, P. (2017). A new approach to determination of the most critical multi-state components in multi-state systems. Journal of Applied Engineering Science, 15(4), 401-405.
Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., & Halim, A.H. (2016). Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint. International Journal of Industrial Engineering Computations, 7(2), 229-244.
Zahorik, A., Thomas, L.J., & Trigeiro, W.W. (1984). Network Programming Models for Production Scheduling in Multi-stage, Multi-item Capacitated Systems. Management Science, 30(3), 308-325.
Zipkin, P.H. (1995). Performance analysis of a multi-item production-inventory system under alternative policies. Management Science, 41(4), 690-703.
Balaji, M., Velmurugan, V., Prapa, M., & Mythily, V. (2016). A fuzzy approach for modeling and design of agile supply chains using interpretive structural modeling. Jordan Journal of Mechanical and Industrial Engineering, 10(1), 67-74.
Bolaños, R.I., Escobar, J.W., & Echeverri, M.G. (2018). A metaheuristic algorithm for the multi-depot vehicle routing problem with heterogeneous fleet. International Journal of Industrial Engineering Computations, 9(4), 461-478.
Banerjee, A., & Banerjee, S. (1994). A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. International Journal of Production Economics, 35, 85-91.
Beladi, H., & Mukherjee, A. (2012). Market structure and strategic bi-sourcing. Journal of Economic Behavior & Organization, 82(1), 210-219.
Berggren, C., & Bengtsson, L. (2004). Rethinking Outsourcing in Manufacturing: A Tale of Two Telecom Firms. European Management Journal, 22(2), 211-223.
Buckova, M., Krajcovic, M., & Jerman, B. (2017). Impact of digital factory tools on designing of warehouses. Journal of Applied Engineering Science, 15(2), 173-180.
Cachon, G.P., & Harker, P.T. (2002). Competition and outsourcing with scale economies. Management Science, 48(10), 1314-1333.
Chakravarty, A.K. (2017). Offshore outsourcing and ownership of facilities with productivity concerns. IISE Transactions, 49(6), 642-651.
Chiu, Y-S.P., Hsieh, Y-T., Kuo, J-S., & Chiu, S.W. (2016a). A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy–I: Using single-machine production scheme. International Journal for Engineering Modelling, 29(1-4), 37-52.
Chiu, S.W., Hsieh, Y-T., Chiu, Y-S.P., & Hwang, M-H. (2016b). A delayed differentiation multi- product FPR model with scrap and a multi-delivery policy–II: Using two-machine production scheme. International Journal for Engineering Modelling, 29(1-4), 53-68.
Chiu, S.W., Liu, C-J., Li, Y-Y., & Chou, C-L. (2017a). Manufacturing lot size and product distribution problem with rework, outsourcing and discontinuous inventory distribution policy. International Journal for Engineering Modelling, 30(1-4), 49-61.
Chiu, Y-S.P., Liu, C-J., & Hwang, M-H. (2017b). Optimal batch size considering partial outsourcing plan and rework. Jordan Journal of Mechanical and Industrial Engineering, 11(3), 195-200.
Chiu, Y-S.P., Lin, H-D., Wu, M-F., & Chiu, S.W. (2018a). Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. International Journal of Industrial Engineering Computations, 9(2), 235-248.
Çömez, N., Stecke, K.E., & Çakanyildirim, M. (2012). Multiple in-cycle transshipments with positive delivery times. Production and Operations Management, 21(2), 378-395.
Federgruen, A., Meissner, J., & Tzur, M. (2007). Progressive interval heuristics for multi-item capacitated lot-sizing problems. Operations Research, 55(3), 490-502.
Fera, M., Fruggiero, F., Lambiase, A., Macchiaroli, R., & Miranda, S. (2017). The role of uncertainty in supply chains under dynamic modeling. International Journal of Industrial Engineering Computations, 8(1), 119-140.
Fergany, H.A. (2016). Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions. SpringerPlus, 5(1), art. no. 1351.
Florea Ionescu, A.I., Corboş, R-A., Popescu, R.I., & Zamfir, A. (2016). From the factory floor to the shop floor – improved supply chain for sustainable competitive advantage with item-level RFID in retail. Economic Computation and Economic Cybernetics Studies and Research, 50(4), 119-134.
Giri, B.C., & Roy, B. (2013). A vendor-buyer integrated production-inventory model with quantity discount and unequal sized shipments. International Journal of Operational Research, 16(1), 1-13.
Groenevelt, H., Pintelon, L., & Seidmann, A. (1992). Production lot sizing with machine breakdowns. Management Sciences, 38, 104-123.
Grosfeld-Nir, A., & Gerchak, Y. (2002). Multistage production to order with rework capability. Management Science, 48(5), 652-664.
Güder, F., & Zydiak, J.L. (1997). Non-stationary ordering policies for multi-item inventory systems subject to a single resource constraint and quantity discounts. Computers and Operations Research, 24(1), 61-71.
Kaylani, H., Almuhtady, A., & Atieh, A.M. (2016). Novel approach to enhance the performance of production systems using lean tools. Jordan Journal of Mechanical and Industrial Engineering, 10(3), 215-229.
Kohli, R., & Park, H. (1994). Coordinating buyer-seller transactions across multiple products. Management Science, 40(9), 45-50.
Korgaonker, M.G. (1979). Integrated production inventory policies for multistage multiproduct batch production systems. Journal of the Operational Research Society, 30(4), 355-362.
Lee, D-H., Lim, S-K., Lee, G-C., Jun, H-B., & Kim, Y-D. (1997). Multi-period part selection and loading problems in flexible manufacturing systems. Computers & Industrial Engineering, 33(3-4), 541-544.
Mendelson, H., & Parlaktürk, A.K. (2008). Product-line competition: Customization vs. proliferation. Management Science, 54(12), 2039-2053.
Mokhtari, H., & Abadi, I.N.K. (2013). Scheduling with an outsourcing option on both manufacturer and subcontractors. Computers & Operations Research, 40(5), 1234-1242.
Nahmias, S. (2009). Production & Operations Analysis. McGraw-Hill Inc. New York.
Nourelfath, M. (2011). Service level robustness in stochastic production planning under random machine breakdowns. European Journal of Operational Research, 212(1), 81-88.
Raj, V., & Prabha, G. (2016). Synthesis, characterization and in vitro drug release of cisplatin loaded Cassava starch acetate–PEG/gelatin nanocomposites. Journal of the Association of Arab Universities for Basic and Applied Sciences, 21, 10-16.
Rardin, R.L. (1998). Optimization in Operations Research. Prentice-Hall, New Jersey.
Razmi, J., Kazerooni, M.P., & Sangari, M.S. (2016). Designing an integrated multi-echelon, multi-product and multi-period supply chain network with seasonal raw materials. Economic Computation and Economic Cybernetics Studies and Research, 50(1), 273-290.
Regti, A., El Kassimi, A., Laamari, M.R., & El Haddad, M. (2017). Competitive adsorption and optimization of binary mixture of textile dyes: A factorial design analysis. Journal of the Association of Arab Universities for Basic and Applied Sciences, 24, 1-9.
Rodado, D.N., Escobar, J.W., García-Cáceres, R.G., & Niebles Atencio, F.A. (2017). A mathematical model for the product mixing and lot-sizing problem by considering stochastic demand. International Journal of Industrial Engineering Computations, 8(2), 237-250.
Saari, J., & Odelius, J. (2018). Detecting operation regimes using unsupervised clustering with infected group labelling to improve machine diagnostics and prognostics. Operations Research Perspectives, 5, 232-244.
Settanni, E., Harrington, T.S., & Srai, J.S. (2017). Pharmaceutical supply chain models: A synthesis from a systems view of operations research. Operations Research Perspectives, 4, 74-95.
Sultana, B., & Mustafa, M.W. (2017). Distribution system loss minimization with network reconfiguration and cost-benefit price based demand reduction modeling. Journal of Engineering Research, 5(1), 140-162.
Sucky, E. (2004). Coordinated order and production policies in supply chains. OR Spectrum, 26(4), 493-520.
Tamura, T. (1988) Solution procedure for the multi-item and multi-stage production planning problem. Transactions of the Japan Society of Mechanical Engineers, Part C, 54(504), 1974-1982.
Taleizadeh, A.A., Jalali-Naini, S.G., Wee, H-M., & Kuo, T-C. (2013). An imperfect multi-product production system with rework. Scientia Iranica 20(3), 811-823.
Thomas D.J., & Hackman S.T. (2003). A committed delivery strategy with fixed frequency and quantity. European Journal of Operational Research, 148(2), 363-373.
Ueno, N., Okuhara, K., Ishii, H., Shibuki, H., & Kuramoto, T. (2007). Multi-item production planning and management system based on unfulfilled order rate in supply chain. Journal of the Operations Research Society of Japan, 50(3), 201-218.
Vishwakarma, A., Kumar, A., & Singh, G.K. (2017). Design of near-perfect-reconstructed transmultiplexer using different modulation techniques: A comparative study. Journal of King Saud University - Engineering Sciences, 29(3), 257-263.
Vujosevic, M., Makajic-Nikolic, D., & Pavlovic, P. (2017). A new approach to determination of the most critical multi-state components in multi-state systems. Journal of Applied Engineering Science, 15(4), 401-405.
Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., & Halim, A.H. (2016). Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint. International Journal of Industrial Engineering Computations, 7(2), 229-244.
Zahorik, A., Thomas, L.J., & Trigeiro, W.W. (1984). Network Programming Models for Production Scheduling in Multi-stage, Multi-item Capacitated Systems. Management Science, 30(3), 308-325.
Zipkin, P.H. (1995). Performance analysis of a multi-item production-inventory system under alternative policies. Management Science, 41(4), 690-703.