Processing, Please wait...

  • Home
  • About Us
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Uncertain Supply Chain Management » Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time

📚 Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • Discrete Firefly
  • ChatGPT and Blended Learning

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1099)
  • ESM (428)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (37)
  • SCI (41)

USCM Volumes

    • Volume 14 (22)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (7)
    • Volume 13 (62)
      • Issue 1 (15)
      • Issue 2 (15)
      • Issue 3 (15)
      • Issue 4 (17)
    • Volume 12 (244)
      • Issue 1 (55)
      • Issue 2 (59)
      • Issue 3 (63)
      • Issue 4 (67)
    • Volume 11 (190)
      • Issue 1 (42)
      • Issue 2 (45)
      • Issue 3 (50)
      • Issue 4 (53)
    • Volume 10 (150)
      • Issue 1 (28)
      • Issue 2 (32)
      • Issue 3 (44)
      • Issue 4 (46)
    • Volume 9 (117)
      • Issue 1 (25)
      • Issue 2 (26)
      • Issue 3 (32)
      • Issue 4 (34)
    • Volume 8 (82)
      • Issue 1 (20)
      • Issue 2 (15)
      • Issue 3 (17)
      • Issue 4 (30)
    • Volume 7 (57)
      • Issue 1 (8)
      • Issue 2 (19)
      • Issue 3 (14)
      • Issue 4 (16)
    • Volume 6 (25)
      • Issue 1 (7)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (6)
    • Volume 5 (26)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 4 (31)
      • Issue 1 (10)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (9)
    • Volume 3 (39)
      • Issue 1 (9)
      • Issue 2 (13)
      • Issue 3 (10)
      • Issue 4 (7)
    • Volume 2 (32)
      • Issue 1 (7)
      • Issue 2 (5)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 1 (22)
      • Issue 1 (4)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (6)

🔑 Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
Sustainability(88)
Artificial intelligence(88)
optimization(87)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Knowledge Management(79)
Factor analysis(78)
Social media(78)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

🌍 Countries

Iran(2198)
Indonesia(1311)
Jordan(815)
India(798)
Vietnam(510)
Saudi Arabia(479)
Malaysia(449)
China(231)
United Arab Emirates(229)
Thailand(160)
United States(116)
Turkey(114)
Ukraine(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(87)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries

Uncertain Supply Chain Management

ISSN 2291-6830 (Online) - ISSN 2291-6822 (Print)
Quarterly Publication
Volume 1 Issue 2 pp. 87-98 , 2013

Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time Pages 87-98 Right click to download the paper Download PDF

Authors: Haibatolah Sadeghi, Ahmad Makui, Heydari Heydari

doi 10.5267/j.uscm.2013.06.002
Crossmark

Keywords: Serial production systems; Planned lead time; Periodic order quantity Uncertainty; Supply chain

Abstract: This paper considers a multi period serial production systems for one product and deals with the problem of planned lead-time calculation in a Material Requirement Planning (MRP) environment under probabilistic lead times. It is assumed that lead times for all stages have the same distribution with different parameters. A MRP approach with periodic order quantity (POQ) policy is used for the supply planning of components. The objective is to minimize the sum of fixed ordering, holding and backlogging costs. A mathematical model is suggested and then an optimal planning lead-time, ordering quantity and periodic time are determined.

How to cite this paper

Sadeghi, H., Makui, A & Heydari, H. (2013). Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time.Uncertain Supply Chain Management, 1(2), 87-98.

References
Ballou, D.P., & Pazer, H.L. (1982).The impact of inspector, fallibility on the inspection policy in serial production systems. Management Science, 28, 387-399.
Conway, R., Maxwell, W., McClain, J.O., & Thomas, L.J. (1988).The role of work-in-process inventory in serial production lines. Operations Research, 36, 229-241.
Elhafsi, M. (2002). Optimal lead times planning in serial production systems with earliness and tardiness costs. IIE Transactions, 34, 233-243.
Gong, L., de Kok, T., & Ding, J. (1994). Optimal lead times planning in a serial production system. Management Science, 40, 629-632.
Harrison, T.P., & Lewis, H.S. (1996). Lot sizing in serial assembly systems with multiple constrained resources. Management Science, 42, 19-36.
Hogg, R. V., McKean, J. W., & Craig, A. T. (2013). Introduction to mathematical statistics. Pearson.
Hnaien, F., Dolgui, A., & Louly, M. A. O. (2008). Planned lead time optimization in material requirement planning environment for multilevel production systems. Journal of Systems Science and Systems Engineering,17(2), 132-155.
Kaplan, R. S. (1970). A dynamic inventory model with stochastic lead times.Management Science, 16(7), 491-507.
Karimi, I.A. (1992). Optimal cycle times in multistage serial systems with set-up and inventory costs. Management Science, 38, 1467-1481.
Mohan, R.P., & Ritzman, L.P. (1998). Planned lead times in multistage systems. Decision Sciences, 29, 163-191.
Rebello, R., Agnetis, A., & Mirchandani, P.B. (1995). Specialized Inspection Problems in Serial Production Systems. European Journal of Operational Research, 80, 277-296
Sheldon, R. (2002). A First Course In Probability, 6/E. Pearson Education India.
Yano, C. A. (1987b). Planned leadtimes for serial production systems. IIE transactions, 19(3), 300-307.
Tang, C. S. (1990). The impact of uncertainty on a production line. Management Science, 36(12), 1518-1531.
Wein, A. S. (1992). Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research, 40(3), 551-563.
Yano, C.A. (1987). Setting planned lead-times in serial production systems with tardiness costs. Management Science, 33, 95-106.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Uncertain Supply Chain Management | Year: 2013 | Volume: 1 | Issue: 2 | Views: 2636 | Reviews: 0

Related Articles:
  • An integrated approach for supply-production planning in a supply chain
  • Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,
  • An inventory model with dependent returns and disposal cost
  • Multi products single machine EPQ model with immediate rework process
  • (Q, R) inventory model with service level constraint and variable lead time in fuzzy-stochastic environment

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com