Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

IJIEC Volumes

    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 3 (76)
      • Issue 1 (9)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • Volume 17 (21)
      • Issue 1 (21)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries

International Journal of Industrial Engineering Computations

ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 2 Issue 1 pp. 123-140 , 2011

Stochastic integrated vendor–buyer model with unstable lead time and setup cost , Pages 123-140 Right click to download the paper Download PDF

Authors: Chandra K. Jaggi, Neetu Arneja

DOI: 10.5267/j.ijiec.2010.06.001

Keywords: Inventory, Setup cost, Lead-time, Crashing cost, Supply chain

Abstract: This paper presents a new vendor-buyer system where there are different objectives for both sides. The proposed method of this paper is different from the other previously published works since it considers different objectives for both sides. In this paper, the vendor’s emphasis is on the crashing of the setup cost, which not only helps him compete in the market but also provides better services to his customers; and the buyer’s aim is to reduce the lead time, which not only facilitates the buyer to fulfill the customers’ demand on time but also enables him to earn a good reputation in the market or vice versa. In the light of the above stated facts, an integrated vendor-buyer stochastic inventory model is also developed. The propsed model considers two cases for demand during lead time: Case (i) Complete demand information, Case (ii) Partial demand information. The proposed model jointly optimizes the buyer’s ordered quantity and lead time along with vendor’s setup cost and the number of shipments. The results are demonstrated with the help of numerical examples.

How to cite this paper
Jaggi, C & Arneja, N. (2011). Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,.International Journal of Industrial Engineering Computations , 2(1), 123-140.

Refrences
Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17(3), 292-311.

Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics, 92, 75-80.

Ben-Daya, M., & Raouf, A. (1999). Inventory models involving lead time as decision variable. Journal of the Operational Research Society, 45, 579-582.

Chang, H. C., Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2006). Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research, 170(2), 481-495.

Cheng, T. L., Huang, C. K., & Chen K. C. (2004). Inventory model involving lead time and setup cost as decision variables. Journal of Statistics and Management Systems, 7(1), 131-141.

Chuang B. R., Ouyang L. Y., & Lin Y. J. (2004). A Minimax distribution free procedure for mixed inventory model with backorder discounts and variable lead time. Journal of Statistics and Management Systems, 7(1), 65-76.

Gallego, G., & Moon, I. (1993). The Distribution Free Newsboy Problem: Review and Extensions. Journal of the Operational Research Society, 44, 825-834.

Goyal, S. K. (1976). An integrated inventory model for a single supplier–single customer problem. International Journal of Production Research, 15(1),107–111.

Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: a comment. European Journal of Operational Research, 82, 209–210.

Goyal, S.K., & Nebebe, F. (2000). Determination of economic production-shipment policy for a single-vendor-single-buyer system. European Journal of Operational Research, 121, 175-178.

Ha, D., & Kim, S. L. (1997). Implementation of JIT purchasing: An integrated approach. Production Planning and Control, 8(2), 152–157.

Hariga, M., & Ben-daya, M. (1999). Some stochastic inventory models with deterministic variable lead time. European Journal of Operational Research, 113, 42-51.

Hill, R. M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem. International Journal of Production Research, 37 (11), 2463–2475.

Hoque, M.A. (2007). An alternative model for integrated vendor-buyer inventory under controllable lead time and its heuristic solution. International Journal of Systems Science, 38(6), 501-509.

Kim, K. L., Hayya, J. C., & Hong, J. D. (1992). Setup reduction in economic production quantity model. Decision Sciences, 23, 500-508.

Liao, C. J., & Shyu, C. H. (1991). An analytical determination of lead time with normal demand. International Journal of Operations & Production Management, 11, 72-78.

Lin, Y. J. (2009). An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Computers and Industrial Engineering, 56, 1597-1606.

Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.

Moon, I., & Choi, S. (1998). A note on lead time and distributional assumptions in continuous review inventory models. Computers & Operations Research, 25, 1007-1012.

Nasri, F., Affisco, J. F., & Paknejad, M. J. (1990). Setup cost reduction in an inventory model with finite range stochastic lead times. International Journal of Production Research, 28, 199-212.

Nori, V. S., & Sarker B. R. (1996). Cyclic Scheduling for a multi product, single facility production system operating under a Just-in-time productions system. Journal of the Operational Research Society, 47, 930-935.

Ouyang L.Y., Wu K. S., & Ho, C. H. (2007). An integrated vendor –buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108, 349-358.

Porteus, E. L. (1985). Investing in reduced setups in the EOQ model. Management Sciences, 31, 998-1010.

Sarker B. R., & Coates E. R. (1990). Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. International Journal of Production Economics, 49, 237-247.

Silver, E. A., & Peterson, R. (1985). Decision Systems for Inventory Management and Production Planning. New York: John Wiley.

Tersine, R. J. (1994). Principles of Inventory and Materials Management. New Jersey: PTR Prentice Hall, Englewood Cliffs.

Trevino, J., Hurley, B. J., & Friedrich, W. (1993). A mathematical model for the economic justification of setup time reduction. International Journal of Production Research, 31, 191–202.

Yang, J. S., & Pan, J. C. (2004). Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research, 42 (5), 853–863.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: International Journal of Industrial Engineering Computations | Year: 2011 | Volume: 2 | Issue: 1 | Views: 2385 | Reviews: 0

Related Articles:
  • Vendor-buyer ordering policy when demand is trapezoidal
  • An integrated single-vendor single-buyer production-inventory model for ite ...
  • A multi-item inventory system with expected shortage level-dependent backor ...
  • Genetic algorithm to optimize two-echelon inventory control system for peri ...
  • Supply chain coordination for a deteriorating product under stock-dependent ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com