Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (54)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 2 Issue 1 pp. 123-140, 2011

Stochastic integrated vendor–buyer model with unstable lead time and setup cost , Pages 123-140 PDF Download PDF

Authors: Chandra K. Jaggi, Neetu Arneja

📋 Author Affiliations:
Chandra K. Jaggi ORCID , Neetu Arneja
¹ Department of Operational Research, Faculty of Mathematical Sciences, University of Delhi, Delhi - 110007, New Academic Block, India
doi 10.5267/j.ijiec.2010.06.001
6 Source: Scopus
Crossref 2 Source: CrossRef

🔑 Keywords: Inventory, Setup cost, Lead-time, Crashing cost, Supply chain

Abstract: This paper presents a new vendor-buyer system where there are different objectives for both sides. The proposed method of this paper is different from the other previously published works since it considers different objectives for both sides. In this paper, the vendor’s emphasis is on the crashing of the setup cost, which not only helps him compete in the market but also provides better services to his customers; and the buyer’s aim is to reduce the lead time, which not only facilitates the buyer to fulfill the customers’ demand on time but also enables him to earn a good reputation in the market or vice versa. In the light of the above stated facts, an integrated vendor-buyer stochastic inventory model is also developed. The propsed model considers two cases for demand during lead time: Case (i) Complete demand information, Case (ii) Partial demand information. The proposed model jointly optimizes the buyer’s ordered quantity and lead time along with vendor’s setup cost and the number of shipments. The results are demonstrated with the help of numerical examples.

How to cite this paper
APA: Jaggi, C & Arneja, N. (2011). Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,. International Journal of Industrial Engineering Computations, 2(1), 123-140.
Chicago/Turabian: Jaggi, C & Arneja, N. 2011. "Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,." International Journal of Industrial Engineering Computations 2, no. 1 (2011): 123-140.
AMA: Jaggi, C & Arneja, N. Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,. International Journal of Industrial Engineering Computations. 2011;2(1):123-140.

References
Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17(3), 292-311.

Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics, 92, 75-80.

Ben-Daya, M., & Raouf, A. (1999). Inventory models involving lead time as decision variable. Journal of the Operational Research Society, 45, 579-582.

Chang, H. C., Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2006). Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research, 170(2), 481-495.

Cheng, T. L., Huang, C. K., & Chen K. C. (2004). Inventory model involving lead time and setup cost as decision variables. Journal of Statistics and Management Systems, 7(1), 131-141.

Chuang B. R., Ouyang L. Y., & Lin Y. J. (2004). A Minimax distribution free procedure for mixed inventory model with backorder discounts and variable lead time. Journal of Statistics and Management Systems, 7(1), 65-76.

Gallego, G., & Moon, I. (1993). The Distribution Free Newsboy Problem: Review and Extensions. Journal of the Operational Research Society, 44, 825-834.

Goyal, S. K. (1976). An integrated inventory model for a single supplier–single customer problem. International Journal of Production Research, 15(1),107–111.

Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: a comment. European Journal of Operational Research, 82, 209–210.

Goyal, S.K., & Nebebe, F. (2000). Determination of economic production-shipment policy for a single-vendor-single-buyer system. European Journal of Operational Research, 121, 175-178.

Ha, D., & Kim, S. L. (1997). Implementation of JIT purchasing: An integrated approach. Production Planning and Control, 8(2), 152–157.

Hariga, M., & Ben-daya, M. (1999). Some stochastic inventory models with deterministic variable lead time. European Journal of Operational Research, 113, 42-51.

Hill, R. M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem. International Journal of Production Research, 37 (11), 2463–2475.

Hoque, M.A. (2007). An alternative model for integrated vendor-buyer inventory under controllable lead time and its heuristic solution. International Journal of Systems Science, 38(6), 501-509.

Kim, K. L., Hayya, J. C., & Hong, J. D. (1992). Setup reduction in economic production quantity model. Decision Sciences, 23, 500-508.

Liao, C. J., & Shyu, C. H. (1991). An analytical determination of lead time with normal demand. International Journal of Operations & Production Management, 11, 72-78.

Lin, Y. J. (2009). An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Computers and Industrial Engineering, 56, 1597-1606.

Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.

Moon, I., & Choi, S. (1998). A note on lead time and distributional assumptions in continuous review inventory models. Computers & Operations Research, 25, 1007-1012.

Nasri, F., Affisco, J. F., & Paknejad, M. J. (1990). Setup cost reduction in an inventory model with finite range stochastic lead times. International Journal of Production Research, 28, 199-212.

Nori, V. S., & Sarker B. R. (1996). Cyclic Scheduling for a multi product, single facility production system operating under a Just-in-time productions system. Journal of the Operational Research Society, 47, 930-935.

Ouyang L.Y., Wu K. S., & Ho, C. H. (2007). An integrated vendor –buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108, 349-358.

Porteus, E. L. (1985). Investing in reduced setups in the EOQ model. Management Sciences, 31, 998-1010.

Sarker B. R., & Coates E. R. (1990). Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. International Journal of Production Economics, 49, 237-247.

Silver, E. A., & Peterson, R. (1985). Decision Systems for Inventory Management and Production Planning. New York: John Wiley.

Tersine, R. J. (1994). Principles of Inventory and Materials Management. New Jersey: PTR Prentice Hall, Englewood Cliffs.

Trevino, J., Hurley, B. J., & Friedrich, W. (1993). A mathematical model for the economic justification of setup time reduction. International Journal of Production Research, 31, 191–202.

Yang, J. S., & Pan, J. C. (2004). Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research, 42 (5), 853–863.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2011 | 📖 Volume: 2 | 📄 Issue: 1 | 👁️ Views: 2620 | 📊 Crossref: 2

Related Articles:
  • Vendor-buyer ordering policy when demand is trapezoidal
  • An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors
  • A multi-item inventory system with expected shortage level-dependent backorder rate with working capital and space restrictions
  • Genetic algorithm to optimize two-echelon inventory control system for perishable goods in terms of active packaging
  • Supply chain coordination for a deteriorating product under stock-dependent consumption rate and unreliable production process

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com