Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Uncertain Supply Chain Management » Coordinating order acceptance and integrated lot streaming-batch delivery scheduling considering third party logistics

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (101)
  • MSL (2658)
  • USCM (1104)
  • HE (52)
  • SCI (52)

USCM Volumes

    • ▼ Volume 15 (5)
      • Issue 1 (5)
    • ▼ Volume 14 (22)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (7)
    • ▼ Volume 13 (62)
      • Issue 1 (15)
      • Issue 2 (15)
      • Issue 3 (15)
      • Issue 4 (17)
    • ▼ Volume 12 (244)
      • Issue 1 (55)
      • Issue 2 (59)
      • Issue 3 (63)
      • Issue 4 (67)
    • ▼ Volume 11 (190)
      • Issue 1 (42)
      • Issue 2 (45)
      • Issue 3 (50)
      • Issue 4 (53)
    • ▼ Volume 10 (150)
      • Issue 1 (28)
      • Issue 2 (32)
      • Issue 3 (44)
      • Issue 4 (46)
    • ▼ Volume 9 (117)
      • Issue 1 (25)
      • Issue 2 (26)
      • Issue 3 (32)
      • Issue 4 (34)
    • ▼ Volume 8 (82)
      • Issue 1 (20)
      • Issue 2 (15)
      • Issue 3 (17)
      • Issue 4 (30)
    • ▼ Volume 7 (57)
      • Issue 1 (8)
      • Issue 2 (19)
      • Issue 3 (14)
      • Issue 4 (16)
    • ▼ Volume 6 (25)
      • Issue 1 (7)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (6)
    • ▼ Volume 5 (26)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 4 (31)
      • Issue 1 (10)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (9)
    • ▼ Volume 3 (39)
      • Issue 1 (9)
      • Issue 2 (13)
      • Issue 3 (10)
      • Issue 4 (7)
    • ▼ Volume 2 (32)
      • Issue 1 (7)
      • Issue 2 (5)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 1 (22)
      • Issue 1 (4)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (6)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(93)
optimization(88)
Financial performance(86)
Trust(85)
TOPSIS(85)
Job satisfaction(81)
Genetic Algorithm(81)
Organizational performance(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Uncertain Supply Chain Management
ISSN 2291-6830 (Online) - ISSN 2291-6822 (Print)
Quarterly Publication
Volume 7 Issue 1 pp. 73-96, 2019

Coordinating order acceptance and integrated lot streaming-batch delivery scheduling considering third party logistics Pages 73-96 PDF Download PDF

Authors: Amir Noroozi, Mohammad Mahdavi Mazdeh, Mehdi Heydari, Morteza Rasti-Barzoki

📋 Author Affiliations:
A. Noroozi ORCID 1, M. Mahdavi Mazdeh ORCID 1, M. Heydari 1, M. Rasti-Barzoki ORCID 2
1 Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
2 Department of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan, 84156-83111, Iran
doi 10.5267/j.uscm.2018.5.001
Crossref 6 Source: CrossRef

🔑 Keywords: Genetic algorithm, Order acceptance, Flexible flow shop, Lot streaming, Batch delivery, Third-party logistics

Abstract: Inspired by the industries such as food and beverage, metal and steel, as well as petroleum and petrochemical ones, the current study addresses a joint order acceptance and scheduling, lot streaming in a flexible flow shop and batch delivery problem. For maximizing a profit objective function with trading off between the revenue of the accepted orders and the costs incurred, a novel mixed integer linear programming is proposed. This paper develops a hybrid metaheuristic algorithm based on the Genetic Algorithm. In the developed algorithm, (1) a heuristic, (2) a local search, and (3) a restart phase is proposed. To set the appropriate parameters of the algorithms, Taguchi experimental design was applied. The obtained results reveal the appropriate performance of the hybrid genetic algorithm.

How to cite this paper
APA: Noroozi, A., Mazdeh, M., Heydari, M & Rasti-Barzoki, M. (2019). Coordinating order acceptance and integrated lot streaming-batch delivery scheduling considering third party logistics. Uncertain Supply Chain Management, 7(1), 73-96.
Chicago/Turabian: Noroozi, A., Mazdeh, M., Heydari, M & Rasti-Barzoki, M. 2019. "Coordinating order acceptance and integrated lot streaming-batch delivery scheduling considering third party logistics." Uncertain Supply Chain Management 7, no. 1 (2019): 73-96.
AMA: Noroozi, A., Mazdeh, M., Heydari, M & Rasti-Barzoki, M. Coordinating order acceptance and integrated lot streaming-batch delivery scheduling considering third party logistics. Uncertain Supply Chain Management. 2019;7(1):73-96.

References
Agnetis, A., Aloulou, M. A., & Fu, L.-L. (2014). Coordination of production and interstage batch delivery with outsourced distribution. European Journal of Operational Research, 238(1), 130-142.
Agnetis, A., Aloulou, M. A., & Kovalyov, M. Y. (2017). Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs International Journal of Production Research, 55, 6193-6206).
Aguezzoul, A. (2014). Third-party logistics selection problem: A literature review on criteria and methods. Omega, 49, 69-78.
Ahmadizar, F., & Farhadi, S. (2015). Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs. Computers & Operations Research, 53, 194-205.
Ahonen, H., & de Alvarenga, A. G. (2017). Scheduling flexible flow shop with recirculation and machine sequence-dependent processing times: formulation and solution procedures. The International Journal of Advanced Manufacturing Technology, 89(1-4), 765-777.
Assarzadegan, P., & Rasti-Barzoki, M. (2016). Minimizing sum of the due date assignment costs, maximum tardiness and distribution costs in a supply chain scheduling problem. Applied Soft Computing, 47, 343-356.
Bożek, A., & Werner, F. (2017). Flexible job shop scheduling with lot streaming and sublot size optimisation. International Journal of Production Research, 1-21.
Cesaret, B., Oğuz, C., & Salman, F. S. (2012). A tabu search algorithm for order acceptance and scheduling. Computers & Operations Research, 39(6), 1197-1205.
Chaurasia, S. N., & Singh, A. (2016). Hybrid evolutionary approaches for the single machine order acceptance and scheduling problem. Applied Soft Computing.
Chaurasia, S. N., & Singh, A. (2017). Hybrid evolutionary approaches for the single machine order acceptance and scheduling problem. Applied Soft Computing, 52, 725-747.
Chen, C., Yang, Z., Tan, Y., & He, R. (2014). Diversity controlling genetic algorithm for order acceptance and scheduling problem. Mathematical Problems in Engineering, 2014.
Chen, Z.-L. (2010). Integrated production and outbound distribution scheduling: review and extensions. Operations Research, 58(1), 130-148.
Cheng, M., Mukherjee, N., & Sarin, S. (2013). A review of lot streaming. International Journal of Production Research, 51(23-24), 7023-7046.
Cheng, M., Sarin, S. C., & Singh, S. (2016). Two-stage, single-lot, lot streaming problem for a 1+ 2 hybrid flow shop. Journal of Global Optimization, 66(2), 263-290.
Duarte, M., Cepeda, J., González-Neira, E., Barrera, D., Cortés, V., & Rey, G. (2017). Performance evaluation of a GRASP-based approach for stochastic scheduling problems. Uncertain Supply Chain Management, 5(4), 359-368.
Emami, S., Sabbagh, M., & Moslehi, G. (2016). A Lagrangian relaxation algorithm for order acceptance and scheduling problem: a globalised robust optimisation approach. International Journal of Computer Integrated Manufacturing, 29(5), 535-560.
Esmaeilbeigi, R., Charkhgard, P., & Charkhgard, H. (2016). Order acceptance and scheduling problems in two-machine flow shops: new mixed integer programming formulations. European Journal of Operational Research, 251(2), 419-431.
Gao, S., Qi, L., & Lei, L. (2015). Integrated batch production and distribution scheduling with limited vehicle capacity. International Journal of Production Economics, 160, 13-25.
Gong, H., Tang, L., & Leung, J. Y. (2016). Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost. Naval Research Logistics (NRL), 63(6), 492-502.
Han, Y., Gong, D., Jin, Y., & Pan, Q.-k. (2016). Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time. Applied Soft Computing, 42, 229-245.
Hassanzadeh, A., Rasti-Barzoki, M., & Khosroshahi, H. (2016). Two new meta-heuristics for a bi-objective supply chain scheduling problem in flow-shop environment. Applied Soft Computing, 49, 335-351.
Herbots, J., Herroelen, W., & Leus, R. (2007). Dynamic order acceptance and capacity planning on a single bottleneck resource. Naval Research Logistics (NRL), 54(8), 874-889.
Lalitha, J. L., Mohan, N., & Pillai, V. M. (2017). Lot streaming in [N-1](1)+ N (m) hybrid flow shop. Journal of Manufacturing Systems, 44, 12-21.
Lei, D., & Guo, X. (2015). A parallel neighborhood search for order acceptance and scheduling in flow shop environment. International Journal of Production Economics, 165, 12-18.
Mazdeh, M. M., Haddadm, H., & Ghanbari, P. (2012). Solving a single machine stochastic scheduling problem using a branch and bound algorithm and simulated annealing. International Journal of Management Science and Engineering Management, 7(2), 110-118.
Mazdeh, M. M., & Rostami, M. (2014). A branch-and-bound algorithm for two-machine flow-shop scheduling problems with batch delivery costs. International Journal of Systems Science: Operations & Logistics, 1(2), 94-104.
Mazdeh, M. M., Rostami, M., & Namaki, M. H. (2013). Minimizing maximum tardiness and delivery costs in a batched delivery system. Computers & Industrial Engineering, 66(4), 675-682.
Mazdeh, M. M., Shashaani, S., Ashouri, A., & Hindi, K. S. (2011). Single-machine batch scheduling minimizing weighted flow times and delivery costs. Applied Mathematical Modelling, 35(1), 563-570.
Mehri, S., Roghanian, E., & Khodadadzadeh, T. (2013). A methodology for outsourcing resources in reverse logistics using fuzzy TOPSIS and fuzzy linear programming. Uncertain Supply Chain Management, 1(2), 107-114.
Mukherjee, N. J., Sarin, S. C., & Singh, S. (2017). Lot streaming in the presence of learning in sublot-attached setup times and processing times. International Journal of Production Research, 55(6), 1623-1639.
Nejati, M., Mahdavi, I., Hassanzadeh, R., & Mahdavi-Amiri, N. (2016). Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint. Journal of Industrial and Production Engineering, 33(7), 459-471.
Nguyen, S. (2016). A learning and optimizing system for order acceptance and scheduling. The International Journal of Advanced Manufacturing Technology, 1-16.
Nobibon, F. T., & Leus, R. (2011). Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment. Computers & Operations Research, 38(1), 367-378.
Noroozi, A., Mazdeh, M. M., Heydari, M., & Rasti-Barzoki, M. (2018). Coordinating order acceptance and integrated production-distribution scheduling with batch delivery considering Third Party Logistics distribution. Journal of Manufacturing Systems, 46, 29-45.
Noroozi, A., Mazdeh, M. M., Noghondarian, K., Rasti-Barzoki, M., & Heydari, M. (2017). Evolutionary computation algorithms to coordinating order acceptance and batch delivery for an integrated supply chain scheduling. Computational and Applied Mathematics, 1-51.
Noroozi, A., & Mokhtari, H. (2015). Scheduling of printed circuit board (PCB) assembly systems with heterogeneous processors using simulation-based intelligent optimization methods. Neural Computing and Applications, 26(4), 857-873.
Ou, J., & Zhong, X. (2016). Order acceptance and scheduling with consideration of service level. Annals of Operations Research, 1-19.
Pourghahreman, N., & Qhatari, A. (2015). Supplier selection in an agent based pharmaceutical supply chain: An application of TOPSIS and PROMETHEE Π. Uncertain Supply Chain Management, 3(3), 231-240.
Rahchamandi, E., & Fallahi, K. (2014). An investigation on logistics outsourcing on exports of minerals goods. Uncertain Supply Chain Management, 2(3), 163-166.
Rasti-Barzoki, M., & Hejazi, S. R. (2013). Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains. European Journal of Operational Research, 228(2), 345-357.
Rasti-Barzoki, M., Hejazi, S. R., & Mazdeh, M. M. (2013). A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs. Applied Mathematical Modelling, 37(7), 4924-4937.
Reisi-Nafchi, M., & Moslehi, G. (2015a). A hybrid genetic and linear programming algorithm for two-agent order acceptance and scheduling problem. Applied Soft Computing, 33, 37-47.
Reisi–Nafchi, M., & Moslehi, G. (2015b). Integrating two–agent scheduling and order acceptance problems to maximise total revenue by bounding each agent penalty function. International Journal of Services and Operations Management, 20(3), 358-384.
Rostami, M., Kheirandish, O., & Ansari, N. (2015). Minimizing maximum tardiness and delivery costs with batch delivery and job release times. Applied Mathematical Modelling, 39(16), 4909-4927.
Sang, H.-Y., Pan, Q.-K., Duan, P.-Y., & Li, J.-Q. (2015). An effective discrete invasive weed optimization algorithm for lot-streaming flowshop scheduling problems. Journal of Intelligent Manufacturing, 1-13.
Silva, Y. L. T., Subramanian, A., & Pessoa, A. A. (2018). Exact and heuristic algorithms for order acceptance and scheduling with sequence-dependent setup times. Computers & Operations Research, 90, 142-160.
Slotnick, S. A. (2011). Order acceptance and scheduling: A taxonomy and review. European Journal of Operational Research, 212(1), 1-11.
Tang, D., Dai, M., Salido, M. A., & Giret, A. (2016). Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization. Computers in Industry, 81, 82-95.
Thevenin, S., Zufferey, N., & Widmer, M. (2016). Order acceptance and scheduling with earliness and tardiness penalties. Journal of Heuristics, 22(6), 849-890.
Vroblefski, M., Ramesh, R., & Zionts, S. (2000). Efficient lot-sizing under a differential transportation cost structure for serially distributed warehouses. European Journal of Operational Research, 127(3), 574-593.
Wan, L., & Zhang, A. (2014). Coordinated scheduling on parallel machines with batch delivery. International Journal of Production Economics, 150, 199-203.
Wang, X., Xie, X., & Cheng, T. (2013). Order acceptance and scheduling in a two-machine flowshop. International Journal of Production Economics, 141(1), 366-376.
Xie, X., & Wang, X. (2016). An enhanced ABC algorithm for single machine order acceptance and scheduling with class setups. Applied Soft Computing, 44, 255-266.
Yin, Y., Cheng, T., Wu, C.-C., & Cheng, S.-R. (2014). Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity. International Journal of Production Research, 52(19), 5583-5596.
Yin, Y., Wang, Y., Cheng, T., Wang, D.-J., & Wu, C.-C. (2016). Two-agent single-machine scheduling to minimize the batch delivery cost. Computers & Industrial Engineering, 92, 16-30.
Zhang, B., Pan, Q.-k., Gao, L., Zhang, X.-l., Sang, H.-y., & Li, J.-q. (2017). An effective modified migrating birds optimization for hybrid flowshop scheduling problem with lot streaming. Applied Soft Computing, 52, 14-27.

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Uncertain Supply Chain Management | 📅 Year: 2019 | 📖 Volume: 7 | 📄 Issue: 1 | 👁️ Views: 2480 | 📊 Crossref: 6

Related Articles:
  • A genetic algorithm for preemptive scheduling of a single machine
  • An integrated model of scheduling, batch delivery and supplier selection in a make-to-order manufacturing system
  • Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times
  • A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs
  • A mathematical model for weighted tardy jobs scheduling problem with a batched delivery system

📝 Ready to share your research?

Uncertain Supply Chain Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com