Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Decision Science Letters » An integrated model of scheduling, batch delivery and supplier selection in a make-to-order manufacturing system

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (804)
  • IJDS (992)
  • DSL (722)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (567)
  • JFS (101)
  • MSL (2658)
  • USCM (1104)
  • HE (51)
  • SCI (51)

DSL Volumes

    • ▼ Volume 15 (73)
      • Issue 1 (19)
      • Issue 2 (22)
      • Issue 3 (32)
    • ▼ Volume 14 (87)
      • Issue 1 (21)
      • Issue 2 (23)
      • Issue 3 (25)
      • Issue 4 (18)
    • ▼ Volume 13 (78)
      • Issue 1 (21)
      • Issue 2 (18)
      • Issue 3 (19)
      • Issue 4 (20)
    • ▼ Volume 12 (64)
      • Issue 1 (12)
      • Issue 2 (24)
      • Issue 3 (13)
      • Issue 4 (15)
    • ▼ Volume 11 (49)
      • Issue 1 (9)
      • Issue 2 (9)
      • Issue 3 (14)
      • Issue 4 (17)
    • ▼ Volume 10 (43)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (20)
      • Issue 4 (8)
    • ▼ Volume 9 (39)
      • Issue 1 (8)
      • Issue 2 (9)
      • Issue 3 (14)
      • Issue 4 (8)
    • ▼ Volume 8 (38)
      • Issue 1 (8)
      • Issue 2 (6)
      • Issue 3 (14)
      • Issue 4 (10)
    • ▼ Volume 7 (41)
      • Issue 1 (8)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (17)
    • ▼ Volume 6 (30)
      • Issue 1 (8)
      • Issue 2 (6)
      • Issue 3 (9)
      • Issue 4 (7)
    • ▼ Volume 5 (39)
      • Issue 1 (12)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (9)
    • ▼ Volume 4 (48)
      • Issue 1 (10)
      • Issue 2 (12)
      • Issue 3 (14)
      • Issue 4 (12)
    • ▼ Volume 3 (53)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (19)
      • Issue 4 (9)
    • ▼ Volume 2 (30)
      • Issue 1 (5)
      • Issue 2 (6)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 1 (10)
      • Issue 1 (5)
      • Issue 2 (5)

🔑 Keywords

Jordan(172)
Supply chain management(169)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(114)
Service quality(101)
Artificial intelligence(101)
Competitive advantage(98)
Tehran Stock Exchange(94)
SMEs(94)
Sustainability(93)
optimization(88)
TOPSIS(85)
Trust(84)
Financial performance(84)
Job satisfaction(81)
Knowledge Management(80)
Genetic Algorithm(80)
Organizational performance(79)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(68)
Mohammad Reza Iravani(65)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(41)
Dmaithan Almajali(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(32)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (8)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Decision Science Letters
ISSN 1929-5812 (Online) - ISSN 1929-5804 (Print)
Quarterly Publication
Volume 5 Issue 2 pp. 189-200, 2016

An integrated model of scheduling, batch delivery and supplier selection in a make-to-order manufacturing system Pages 189-200 PDF Download PDF

Authors: Mohammad Mahdavi Mazdeh, Mehdi Heydari, Ayatollah Karamouzian

📋 Author Affiliations:
M.M. Mazdeh ORCID , M. Heydari , A. Karamouzian
¹ Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
doi 10.5267/j.dsl.2015.12.005
2 Source: Scopus
Crossref 2 Source: CrossRef

🔑 Keywords: Batch delivery, Greedy heuristic, Scheduling, Single-machine, Suppliers selection

Abstract: This paper analyzes a supply chain, which consists of a manufacturer, a retailer and several suppliers in which the retailer orders jobs to the manufacturer and the suppliers provide the requiring parts. The manufacturer schedules and processes the orders and dispatches them to the retailer either individually or collectively in batches. The manufacturer incurs a penalty cost for each tardy job and a transportation cost for every delivered batch and therefore, searches for a schedule that yields minimum number of tardy jobs and batches. Moreover, the manufacturer tries to optimize its supplying cost through locating the suppliers that offer appropriate release times and costs for manufacturing parts. Since the release times of parts directly affect scheduling of orders, in this research, we develop an integrated mathematical model for the manufacturer that incorporates suppliers & apos; selection issue into the scheduling and batching decisions. Furthermore, we present a heuristic algorithm (greedy algorithm) and also a local search to quickly determine the optimal or near-optimal solutions. The computational analysis shows the importance of the integrated model and also the superiority and effectiveness of the heuristic algorithms.

How to cite this paper
APA: Mazdeh, M., Heydari, M & Karamouzian, A. (2016). An integrated model of scheduling, batch delivery and supplier selection in a make-to-order manufacturing system. Decision Science Letters, 5(2), 189-200.
Chicago/Turabian: Mazdeh, M., Heydari, M & Karamouzian, A. 2016. "An integrated model of scheduling, batch delivery and supplier selection in a make-to-order manufacturing system." Decision Science Letters 5, no. 2 (2016): 189-200.
AMA: Mazdeh, M., Heydari, M & Karamouzian, A. An integrated model of scheduling, batch delivery and supplier selection in a make-to-order manufacturing system. Decision Science Letters. 2016;5(2):189-200.

References
Adamu, M. O., & Adewumi, A. O. (2014). A survey of single machine scheduling to minimize weighted number of tardy jobs. Journal of Industrial & Management Optimization, 10(1), 219-241.

Ahmadizar, F., & Farhadi, S. (2015). Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs. Computers & Operations Research, 53, 194-205.

Chen, Z. L. (2010). Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58(1), 130-148.

Chen, Z. L., & Vairaktarakis, G. L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51(4), 614-628.

Cheng, T. C. E., Gordon, V. S., & Kovalyov, M. Y. (1996). Single machine scheduling with batch deliveries. European Journal of Operational Research, 94(2), 277-283.

Cheng, T. C. E., & Kahlbacher, H. G. (1993). Scheduling with delivery and earliness penalties. Asia-Pacific Journal of Operational Research, 10, 145-152.

Dauzère-Pérès, S. (1995). Minimizing late jobs in the general one machine scheduling problem. European Journal of Operational Research, 81(1), 134-142.

Detienne, B. (2014). A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints. European Journal of Operational Research, 235(3), 540-552.

Graham, e. a. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5(1), 287-326.

Haddad, H., Ghanbari, P., & Moghaddam, A. Z. (2012). A new mathematical model for single machine batch schedd{stroke}uling problem for minimizing maximum lateness with deteriorating jobs. International Journal of Industrial Engineering Computations, 3(2), 253-264.

Hall, N. G., & Potts, C. N. (2003). Supply chain scheduling: Batching and delivery. Operations Research, 51(4), 566-584+674.

Herrmann, J., & Ullrich, C. A. (2013). The cost-cutting potential of supply chain scheduling. SSRN: 1829138.

Ji, M., He, Y., & Cheng, T. C. E. (2007). Batch delivery scheduling with batch delivery cost on a single machine. European Journal of Operational Research, 176(2), 745-755.

Lee, C. Y., & Chen, Z. L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4(1), 3-24.

Lenstra, J. K., Rinnooy Kan, A. H. G., & Brucker, P. (1977). Complexity of machine scheduling problems. Annals of Discrete Mathematics, 7, 343–362.

Li, C.-L. (2015). Improved algorithms for single-machine common due window assignment and scheduling with batch deliveries. Theoretical Computer Science, 570, 30-39.

Mazdeh, M. M., Esfahani, A. N., Sakkaki, S. E., & Pilerood, A. E. (2012). Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times. International Journal of Industrial Engineering Computations, 3(3), 347-364.

Mazdeh, M. M., Hamidinia, A., & Karamouzian, A. (2011). A mathematical model for weighted tardy jobs scheduling problem with a batched delivery system. International Journal of Industrial Engineering Computations, 2(3), 491-498.

Mazdeh, M. M., & Karamouzian, A. (2014). Evaluating strategic issues in supply chain scheduling using game theory. International Journal of Production Research, 1-14.

Mazdeh, M. M., Sarhadi, M., & Hindi, K. S. (2007). A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs. European Journal of Operational Research, 183(1), 74-86.

Mazdeh, M. M., Sarhadi, M., & Hindi, K. S. (2008). A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times. Computers and Operations Research, 35(4), 1099-1111.

Moore, J. M. (1968). An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs. Management Science, 15(1), 102-109.

Parhizkari, M., Amirib, M., & Mousakhani, M. (2013). A multiple criteria decision making technique for supplier selection and inventory management strategy: A case of multi-product and multi-supplier problem. Decision Science Letters, 2(3), 185-190.

Pundoor, G., & Chen, Z. L. (2005). Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost. Naval Research Logistics, 52(6), 571-589.

Rasti-Barzoki, M., Hejazi, S. R., & Mazdeh, M. M. (2013). A Branch and Bound Algorithm to Minimize the Total Weighed Number of Tardy Jobs and Delivery Costs. Applied Mathematical Modelling, 37(7), 4924-4937.

Razi, F. (2014). A supplier selection using a hybrid grey based hierarchical clustering and artificial bee colony. Decision Science Letters, 3(3), 259-268.

Selvarajah, E., & Zhang, R. (2014). Supply chain scheduling at the manufacturer to minimize inventory holding and delivery costs. International Journal of Production Economics, 147, Part A, 117-124.

Tadeusz, S. (2011). Scheduling in Supply Chains Using Mixed Integer Programming. Hoboken, New Jersey: John Wiley & Sons, Inc.

Talbi, E.-G. (2009). Metaheuristics: From Design to Implementation. Hoboken, New Jersey: John Wiley & Sons,.

Tyagi, N., Abedi, M., & Varshney, R. G. (2013). Single machine scheduling in a batch delivery system with fixed delivery dates. International Journal of Engineering and Technology, 5(4), 3484-3488.

Yin, Y., Cheng, T. C. E., Wu, C. C., & Cheng, S. R. (2013). Single-machine common due-date scheduling with batch delivery costs and resource-dependent processing times. International Journal of Production Research, 51(17), 5083-5099.

Yin, Y., Wang, Y., Cheng, T., Wang, D.-J., & Wu, C.-C. (2015). Two-agent single-machine scheduling to minimize the batch delivery cost. Computers & Industrial Engineering.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Decision Science Letters | 📅 Year: 2016 | 📖 Volume: 5 | 📄 Issue: 2 | 👁️ Views: 2677 | 📊 Crossref: 2

Related Articles:
  • Optimization costs of the single-machine scheduling problem with maintenance activities by using genetic algorithm
  • A branch and bound for single machine stochastic scheduling to minimize the maximum lateness
  • Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times
  • A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs
  • A mathematical model for weighted tardy jobs scheduling problem with a batched delivery system

📝 Ready to share your research?

Decision Science Letters is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com