Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Integrated multi-resource planning and scheduling in engineering project

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (55)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Knowledge Management(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Journal of Project Management
ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 2 Issue 1 pp. 11-26, 2017

Integrated multi-resource planning and scheduling in engineering project Pages 11-26 PDF Download PDF

Authors: Samer Ben Issa, Yiliu Tu

📋 Author Affiliations:
Samer Ben Issa ORCID , Yiliu Tu
¹ SCHULICH School of Engineering, Department of Mechanical and Manufacturing Engineering, University of Calgary, 2500 University Dr., NW, Calgary, Alberta T2N 1N4, Canada
doi 10.5267/j.jpm.2017.5.003
Crossref Source: CrossRef

🔑 Keywords: Integrated planning and scheduling process, Resource constrained project scheduling problem (RCPSP), Activities splitting, Minimum Moments of Resources Required (MMORR)

Abstract: Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR)”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.



How to cite this paper
APA: Issa, S & Tu, Y. (2017). Integrated multi-resource planning and scheduling in engineering project. Journal of Project Management, 2(1), 11-26.
Chicago/Turabian: Issa, S & Tu, Y. 2017. "Integrated multi-resource planning and scheduling in engineering project." Journal of Project Management 2, no. 1 (2017): 11-26.
AMA: Issa, S & Tu, Y. Integrated multi-resource planning and scheduling in engineering project. Journal of Project Management. 2017;2(1):11-26.

References
Ahuja, H. N. (1976). Construction performance control by networks. New York; Toronto: Wiley.
Akpan, E. O. (2000). Resource smoothing: A cost minimization approach. Production Planning & Control, 11(8), 775-780.
Bandelloni, M., Tucci, M., & Rinaldi, R. (1994). Optimal resource leveling using non-serial dyanamic programming. European Journal of Operational Research, 78(2), 162-177.
Bell, C. E., & Park, K. (1990). Solving resource‐constrained project scheduling problems by a* search. Naval Research Logistics (NRL), 37(1), 61-84.
Burgess, A. R., & Killebrew, J. B. (1962). Variation in activity level on a cyclical arrow dia-gram. Journal of Industrial Engineering, 13(2), 76-83.
Burns, S. A., Liu, L., & Feng, C. W. (1996). The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management & Economics, 14(3), 265-276.
Chan, W. T., Chua, D. K., & Kannan, G. (1996). Construction resource scheduling with genetic algo-rithms. Journal of Construction Engineering and Management, 122(2), 125-132.
Christodoulou, S. E., Ellinas, G., & Michaelidou-Kamenou, A. (2009). Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Manage-ment, 136(5), 518-527.
Chua, D. K. H., Chan, W. T., & Kannan, G. (1996). Scheduling with co-evolving resource availability profiles. Civil Engineering Systems, 13(4), 311-329.
Easa, S. M. (1989). Resource leveling in construction by optimization. Journal of construction engi-neering and management, 115(2), 302-316.
Elmaghraby, S. E. (1993). Resource allocation via dynamic programming in activity net-works. European Journal of Operational Research, 64(2), 199-215.
El-Rayes, K., & Jun, D. H. (2009). Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), 1172-1180.
Feng, C. W., Liu, L., & Burns, S. A. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering, 11(3), 184-189.
Gagnon, M. (2004). A tabu search algorithm for the resource constrained project scheduling problem. In In Proceedings of Administrative Sciences Association of Canada Annual Conference (ASAC).
Harris, R. (1978). Resource and arrow networking techniques for construction.
Hariga, M., & El-Sayegh, S. M. (2010). Cost optimization model for the multiresource leveling prob-lem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), 56-64.
Hegazy, T. (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), 167-175.
Hiyassat, M. A. S. (2000). Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), 278-284.
Hiyassat, M. A. S. (2001). Applying modified minimum moment method to multiple resource level-ing. Journal of Construction Engineering and Management, 127(3), 192-198.
Hossein Hashemi Doulabi, S., Seifi, A., & Shariat, S. Y. (2010). Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Manage-ment, 137(2), 137-146.
Karaa, F. A., & Nasr, A. Y. (1986). Resource management in construction. Journal of Construction Engineering and Management, 112(3), 346-357.
Lee, H., & Kim, S. S. (2001). Integration of process planning and scheduling using simulation based genetic algorithms. The International Journal of Advanced Manufacturing Technology, 18(8), 586-590.
Mattila, K. G., & Abraham, D. M. (1998). Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), 232-244.
Myers, K. L., & Smith, S. F. (1999, November). Issues in the integration of planning and scheduling for enterprise control. In Proc. DARPA Symposium on Advances in Enterprise Control.
Senouci, A. B., & Adeli, H. (2001). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1), 28-34.
Senouci, A. B., & Eldin, N. N. (2004). Use of genetic algorithms in resource scheduling of construc-tion projects. Journal of Construction Engineering and Management, 130(6), 869-877.
Shanmuganayagam, V. (1989). Current float techniques for resources scheduling. Journal of Con-struction Engineering and Management, 115(3), 401-411.
Son, J., & Mattila, K. G. (2004). Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Mmanagement, 130(6), 887-894.
Son, J., & Skibniewski, M. J. (1999). Multiheuristic approach for resource leveling problem in con-struction engineering: Hybrid approach. Journal of Construction Engineering and Manage-ment, 125(1), 23-31.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Journal of Project Management | 📅 Year: 2017 | 📖 Volume: 2 | 📄 Issue: 1 | 👁️ Views: 2454 | 📊 Crossref:

Related Articles:
  • A mathematical model for crashing projects by considering time, cost, quality and risk
  • A mathematical model for optimal tower crane layout planning
  • A study on the performance of differential search algorithm for single mode resource constrained project scheduling problem
  • Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms
  • Investigating different challenges in construction projects

📝 Ready to share your research?

Journal of Project Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com