Processing, Please wait...

  • Publisher Home
  • Home
  • ๐Ÿ”™ Back
  • ๐Ÿ“š Journals
    • โš™๏ธ IJIEC - Industrial Engineering Computations
    • ๐ŸŒ IJDNS - Data and Network Science
    • ๐Ÿงช CCL - Current Chemistry Letters
    • ๐Ÿ’น AC - Accounting
    • ๐ŸŽฏ DSL - Decision Science Letters
    • ๐Ÿš› USCM - Uncertain Supply Chain Management
    • ๐Ÿ—๏ธ JPM - Journal of Project Management
    • ๐Ÿฅ HE - Healthcare Engineering
    • ๐Ÿ“ˆ SCI - Scientometrica
    • ๐Ÿ”ฉ ESM - Engineering Solid Mechanics
    • ๐ŸŒฟ JFS - Journal of Future Sustainability
    • ๐Ÿ’ผ MSL - Management Science Letters
  • ๐Ÿ“ Submit Article
  • ๐Ÿ“Š Statistics
  • ๐Ÿ“‹ About
    • ๐Ÿ“„ About Us
    • ๐Ÿ“ฐ Blog
    • ๐Ÿ“ข News
    • ๐Ÿ“ง Contact
  • ๐Ÿ“บ Tutorial
  • Search:
  • Advanced Search

Growing Science » Authors » Yiliu Tu

โญ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

๐Ÿ”‘ Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

โœ๏ธ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

๐ŸŒ Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: ๐Ÿ“– Volume | ๐Ÿ“… Date | โญ Most Rates | ๐Ÿ‘๏ธ Most Views | ๐Ÿš€ Rising Stars | ๐Ÿ”— Citations (Scopus) | ๐Ÿ”ฅ Hot Papers
1.

A survey in the resource-constrained project and multi-project scheduling problems Pages 117-138 PDF Download PDF

Authors: Samer Ben Issa, Yiliu Tu

doi 10.5267/j.jpm.2019.11.001

๐Ÿ”‘ Keywords: Project scheduling, ABCD activity classifications, Limited resources

Abstract:
Resource-Constrained Project and Multi-Project Scheduling Problems (RCPSPs and RCMPSPs) have been essential topics of study over the last three decades. Both prob-lems consist of activities that must be scheduled subject to precedence and resource constraints. This paper surveys studies of RCPSPs and RCMPSPs under consideration of four categories of project activities, simply recorded as categories A, B, C, and D. Category A refers to activities can be performed using fixed resources along The Y-axis over fixed durations along The X-axis, and cannot be interrupted. Category B applies to activities that can be performed using the same type of resource in category A but can be interrupted. Category C refers to activities that can be performed using flexible resources over flexible durations and cannot be interrupted. Category D refers to activities can be performed using flexible resources over flexible durations and can be interrupted. Many algorithms have been developed to solve the RCPSPs and RCMPSPs when activities are classified individually under category A, B, or C. However, in practice, welding, cutting or assembly activities in a manufacturing projects for an oil cargo can be under a new category so-called D. The project manager can speed up or slow down these activities by allocating or removing more resources, and these activities can be interrupted or can be resumed at any time. From the perspective of activity categories, we intend to review the literature on RCPSPs and RCMPSPs and to obtain the new research directions for solving the problems.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2020 | Volume: 5 | Issue: 2 | Views: 5360

 
2.

New procedures with new activity assumptions for solving resource constrained project scheduling problems Pages 41-58 PDF Download PDF

Authors: Samer Ben Issa, Yiliu Tu

doi 10.5267/j.jpm.2019.7.002

๐Ÿ”‘ Keywords: Project scheduling, Limited multi-resource, ABCD activity classifications, Flexible resource profile

Abstract:
The resource-constrained project scheduling problem (RCPSP) is a well-known and widely studied topic. The underlying problem assumes that non-preemptions and that constant resources are restrictions imposed on project activities, which are to be scheduled, subject to precedence relation and limited resource constraints. Project activities, in RCPSP, are classified under category A. The problem is expanded to include various other activity assumptions categories, such as B and C. In the Preemptive-RCPSP, project activities are classified under category B, which refers to the activity that can be implemented using constant resources and constant durations. In the Flexible-RCPSP, project activities are classified under category C, which refers to the activities that can be executed using flexible resources over flexible durations, and preemptions are not allowed. However, in One-of-a-Kind Production companies (OKP), such as the housing industry, plastic injection moldings, and RV manufacturing, all known as โ€œmanufactured-to-orderโ€ operations, the activities are classified under category D in addition to A, B, and C, simultaneously. Category D refers to the activities that can be executed using flexible durations and flexible resources, and preemptions are allowed. In this paper, therefore, we present a new effective model in order to deal with the projects that consist of all the previous activity assumptions simultaneously to generate feasible project schedules. Case studies are included, and the results show that the resources usage is increased and the project makespan is reduced.
Details
  • 85
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2020 | Volume: 5 | Issue: 1 | Views: 2072

 
3.

Integrated multi-resource planning and scheduling in engineering project Pages 11-26 PDF Download PDF

Authors: Samer Ben Issa, Yiliu Tu

doi 10.5267/j.jpm.2017.5.003

๐Ÿ”‘ Keywords: Integrated planning and scheduling process, Resource constrained project scheduling problem (RCPSP), Activities splitting, Minimum Moments of Resources Required (MMORR)

Abstract:
Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called โ€œthe Minimum Moments of Resources Required around X-Y axes (MMORR)โ€, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 2458

 

® 2010-2026 GrowingScience.Com