How to cite this paper
Hosseini, M., Beiranvand, P., Dadgar, M & Olfati, A. (2017). A mathematical model for optimal tower crane layout planning.Decision Science Letters , 6(4), 377-386.
Refrences
Choi, C. W., & Harris, F. C. (1991). Technical note. A model for determining optimum crane position. Proceedings of the Institution of Civil Engineers, 90(3), 627-634.
Farrell, C. W., & Hover, K. C. (1989). Computerized crane selection and placement for the construction site. In 4. International Conference on Civil and Structural Engineering Computing. (Vol. 1, pp. 91-94).
Furusaka, S., & Gray, C. (1984). A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(2), 157-176.
Gray, C., & Little, J. (1985). A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), 121-144.
Herrera, I., & Kaczmarczyk, S. (2016, May). Simple models for rope substructure mechanics: application to electro-mechanical lifts. In Journal of Physics: Conference Series (Vol. 721, No. 1, p. 012008). IOP Publishing.
Irizarry, J., & Karan, E. P. (2012). Optimizing location of tower cranes on construction sites through GIS and BIM integration. Journal of Information Technology in Construction (ITcon), 17(23), 351-366.
Olearczyk, J., Al-Hussein, M., & Bouferguène, A. (2014). Evolution of the crane selection and on-site utilization process for modular construction multilifts. Automation in Construction, 43, 59-72.
Tam, C. M., Tong, T. K., & Chan, W. K. (2001). Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), 315-321.
Tubaileh, A. (2016). Working time optimal planning of construction site served by a single tower crane. Journal of Mechanical Science and Technology, 30(6), 2793-2804.
Warszawski, A. (1973). Analysis of transportation methods in construction. Journal of the Construction Division, 99(1), 191-202.
Wijesundera, D. A., & Harris, F. C. (1986). Computer simulation for materials handling in high rise construction. In Proceedings of the International AMSE Conference on Modeling and Simulation, Sorrento, Italy (Vol. 4, pp. 81-95).
Wu, D., Lin, Y., Wang, X., Wang, X., & Gao, S. (2010). Algorithm of crane selection for heavy lifts. Journal of Computing in Civil Engineering, 25(1), 57-65.
Xiaoyi, Y., Baoshan, L., & Mingxiang, P. (2009). Selection and location of tower crane used in CCTV main building. Construction Technology, 4, 015.
Farrell, C. W., & Hover, K. C. (1989). Computerized crane selection and placement for the construction site. In 4. International Conference on Civil and Structural Engineering Computing. (Vol. 1, pp. 91-94).
Furusaka, S., & Gray, C. (1984). A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(2), 157-176.
Gray, C., & Little, J. (1985). A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), 121-144.
Herrera, I., & Kaczmarczyk, S. (2016, May). Simple models for rope substructure mechanics: application to electro-mechanical lifts. In Journal of Physics: Conference Series (Vol. 721, No. 1, p. 012008). IOP Publishing.
Irizarry, J., & Karan, E. P. (2012). Optimizing location of tower cranes on construction sites through GIS and BIM integration. Journal of Information Technology in Construction (ITcon), 17(23), 351-366.
Olearczyk, J., Al-Hussein, M., & Bouferguène, A. (2014). Evolution of the crane selection and on-site utilization process for modular construction multilifts. Automation in Construction, 43, 59-72.
Tam, C. M., Tong, T. K., & Chan, W. K. (2001). Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), 315-321.
Tubaileh, A. (2016). Working time optimal planning of construction site served by a single tower crane. Journal of Mechanical Science and Technology, 30(6), 2793-2804.
Warszawski, A. (1973). Analysis of transportation methods in construction. Journal of the Construction Division, 99(1), 191-202.
Wijesundera, D. A., & Harris, F. C. (1986). Computer simulation for materials handling in high rise construction. In Proceedings of the International AMSE Conference on Modeling and Simulation, Sorrento, Italy (Vol. 4, pp. 81-95).
Wu, D., Lin, Y., Wang, X., Wang, X., & Gao, S. (2010). Algorithm of crane selection for heavy lifts. Journal of Computing in Civil Engineering, 25(1), 57-65.
Xiaoyi, Y., Baoshan, L., & Mingxiang, P. (2009). Selection and location of tower crane used in CCTV main building. Construction Technology, 4, 015.