How to cite this paper
Mahmoudi, A & Feylizadeh, M. (2017). A mathematical model for crashing projects by considering time, cost, quality and risk.Journal of Project Management, 2(1), 27-36.
Refrences
Afshar, A., Kavek, A., & Shoghli, O. (2007). Multi-Objective Optimization of Time-Cost-Quality Us-ing Multi-Colony Ant Algorithm. Asian Journal of Civil Engineering (Building and Housing), 8(2), 113-124.
Babu, A. J., & Suresh, N. (1996). Theory and Methodology Project management with time, cost, and quality considerations. European Journal of Operational Research, 88(7), 320–327.
Kiran, D.R. (2017). Cost of Quality, In Total Quality Management, Butterworth-Heinemann, pp. 99-111.
Ebrahimnezhad, S., Ahmadi,V., & Javanshir, H. (2013). Time-Cost-Quality Trade-off in a CPM1 Network Using Fuzzy Logic and Genetic Algorithm. International Journal of Industrial Engineer-ing & Production Management, 24(3), 361–376.
El-Rayes, K., & Kandil, A. (2005). Time-cost-quality trade-off analysis for highway construc-tion. Journal of construction Engineering and Management, 131(4), 477-486.
Lester, A. (2006). Project management, planning and control: managing engineering, construction and manufacturing projects to PMI, APM and BSI standards. Butterworth-Heinemann.
Feng, C. (1997). Using GA to solve construction time cost Trade off Problem. Journal of Computing in Civil Engineering, 11(3), 184-189.
Feng, C., Liu, L., & Burns, S.A. (2000). Stochastic Construction Time-Cost Trade-Off Analysis. Journal of Computing in Civil Engineering, 14(2), 117-126.
Iranmanesh, H., Skandari, M.R., & Allahverdilloo, M. (2008). Finding Pareto Optimal Front for the Multi-Mode Time, Cost Quality Trade-off in Project Scheduling. International Journal of Comput-er and Information Engineering, 2(2), 118-122.
Ke, H, & Ma. J. (2014). Modeling project time–cost trade-off in fuzzy random environment. Applied Soft Computing, 19, 80-85.
Kelly, J.E. (1961) Critical Path Planning and Scheduling: Mathematical Basis. Operational Research Journal, 9(3), 167-169.
Khang, D.B., & Myint, Y.M. (1999). Time, cost and quality trade-off in project management: A case study. International Journal of Project Management, 17(4), 249-256.
Kim, J., Kang, C., & Hwang, I. (2012). A practical approach to project scheduling: considering the potential quality loss cost in the time cost tradeoff problem. International Journal of Project Man-agement, 30(2), 264–272.
Leu, L., Burns, S., & Feng, C. (2005). Construction time- cost trade-off analysis using LP/IP hybrid model. Journal of Construction Engineering Management, 121(4), 446-454.
Project Management Institute. (2009). PRACTICE STANDARD FOR PROJECT RISK MANAGE-MENT (PMBOK ® Guide) Fourth Edition. Newtown Square, PA: Author.
Project Management Institute. (2011). PRACTICE STANDARD FOR SCHEDULING (PMBOK ® Guide) Second Edition. Newtown Square, PA: Author.
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) Fifth Edition. Newtown Square, PA: Author.
Sakellaropoulos, S., & Chassiakos, A. P. (2004). Project time – cost analysis under generalised prece-dence relations. Advances in Engineering Software, 35(10 –11), 715–724.
Shahsavari Pour, N, Modarres, M & Tavakkoli-Moghaddam, R. (2012). Time-cost-quality trade-off in project scheduling with linguistic variables. World Applied Sciences Journal, 18(3), 404–413.
Tareghian, H.R., & Taheri, S.H.R. (2007). A Solution Procedure for the Discrete Time, Cost and Quality Trade off Problem using Electromagnetic Scatter Search. Applied Mathematics and Com-putation, 182(1), 305-312.
Wang, W., & Feng, Q. (2008). Multi-objective Optimization in Construction Project Based on a Hier-archical Subpopulation Particle Swarm Optimization Algorithm. Proceeding of Second Internation-al Symposium on Intelligent Information Technology Application, Published in: Proceeding IITA, 1(8), 746-750.
Zhang, H., Li, H., & Tam, C.M. (2006). Particle Swarm Optimization for Resource-Constrained Pro-ject Scheduling. International Journal of Project Management, 24(1), 83–92.
Babu, A. J., & Suresh, N. (1996). Theory and Methodology Project management with time, cost, and quality considerations. European Journal of Operational Research, 88(7), 320–327.
Kiran, D.R. (2017). Cost of Quality, In Total Quality Management, Butterworth-Heinemann, pp. 99-111.
Ebrahimnezhad, S., Ahmadi,V., & Javanshir, H. (2013). Time-Cost-Quality Trade-off in a CPM1 Network Using Fuzzy Logic and Genetic Algorithm. International Journal of Industrial Engineer-ing & Production Management, 24(3), 361–376.
El-Rayes, K., & Kandil, A. (2005). Time-cost-quality trade-off analysis for highway construc-tion. Journal of construction Engineering and Management, 131(4), 477-486.
Lester, A. (2006). Project management, planning and control: managing engineering, construction and manufacturing projects to PMI, APM and BSI standards. Butterworth-Heinemann.
Feng, C. (1997). Using GA to solve construction time cost Trade off Problem. Journal of Computing in Civil Engineering, 11(3), 184-189.
Feng, C., Liu, L., & Burns, S.A. (2000). Stochastic Construction Time-Cost Trade-Off Analysis. Journal of Computing in Civil Engineering, 14(2), 117-126.
Iranmanesh, H., Skandari, M.R., & Allahverdilloo, M. (2008). Finding Pareto Optimal Front for the Multi-Mode Time, Cost Quality Trade-off in Project Scheduling. International Journal of Comput-er and Information Engineering, 2(2), 118-122.
Ke, H, & Ma. J. (2014). Modeling project time–cost trade-off in fuzzy random environment. Applied Soft Computing, 19, 80-85.
Kelly, J.E. (1961) Critical Path Planning and Scheduling: Mathematical Basis. Operational Research Journal, 9(3), 167-169.
Khang, D.B., & Myint, Y.M. (1999). Time, cost and quality trade-off in project management: A case study. International Journal of Project Management, 17(4), 249-256.
Kim, J., Kang, C., & Hwang, I. (2012). A practical approach to project scheduling: considering the potential quality loss cost in the time cost tradeoff problem. International Journal of Project Man-agement, 30(2), 264–272.
Leu, L., Burns, S., & Feng, C. (2005). Construction time- cost trade-off analysis using LP/IP hybrid model. Journal of Construction Engineering Management, 121(4), 446-454.
Project Management Institute. (2009). PRACTICE STANDARD FOR PROJECT RISK MANAGE-MENT (PMBOK ® Guide) Fourth Edition. Newtown Square, PA: Author.
Project Management Institute. (2011). PRACTICE STANDARD FOR SCHEDULING (PMBOK ® Guide) Second Edition. Newtown Square, PA: Author.
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) Fifth Edition. Newtown Square, PA: Author.
Sakellaropoulos, S., & Chassiakos, A. P. (2004). Project time – cost analysis under generalised prece-dence relations. Advances in Engineering Software, 35(10 –11), 715–724.
Shahsavari Pour, N, Modarres, M & Tavakkoli-Moghaddam, R. (2012). Time-cost-quality trade-off in project scheduling with linguistic variables. World Applied Sciences Journal, 18(3), 404–413.
Tareghian, H.R., & Taheri, S.H.R. (2007). A Solution Procedure for the Discrete Time, Cost and Quality Trade off Problem using Electromagnetic Scatter Search. Applied Mathematics and Com-putation, 182(1), 305-312.
Wang, W., & Feng, Q. (2008). Multi-objective Optimization in Construction Project Based on a Hier-archical Subpopulation Particle Swarm Optimization Algorithm. Proceeding of Second Internation-al Symposium on Intelligent Information Technology Application, Published in: Proceeding IITA, 1(8), 746-750.
Zhang, H., Li, H., & Tam, C.M. (2006). Particle Swarm Optimization for Resource-Constrained Pro-ject Scheduling. International Journal of Project Management, 24(1), 83–92.