Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Resource constrained project scheduling problem (RCPSP)

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

A learnheuristic method for solving resource constrained project scheduling problem Pages 763-780 PDF Download PDF

Authors: Behnam Jahani, Mohammad Amin Adibi

doi 10.5267/j.jpm.2025.7.002

🔑 Keywords: Resource constrained project scheduling problem (RCPSP), Learnheuristic, Decision Tree, Genetic Algorithm

Abstract:
Project scheduling in resource-constrained mode is one of the most important issues in the field of project management. The main philosophy of this problem is to use less resources while respecting the resource limit to complete the project in a shorter time although other goals can be considered. When a very large amount of data is generated by the meta-heuristic algorithm and there are many variables involved in solving the problem, no other algorithm or technique is able to analyze the output. For this purpose, learnheuristics have the ability to use combined metaheuristics and machine learning tools with high accuracy and in less time to analyze data. The primary purpose of this research is to combine machine learning and genetic algorithms to reduce the project completion time which can lead to a reduction in the cost of the project. Due to the population-based nature of the problem a large amount of initial population was generated. In order to convert the generated schedules into feasible ones, a repair strategy was used. A data matrix was created to import data into the ML model. After specifying the training and testing settings of the model, the decision tree was used to analyze the data of the problem, then its output was applied to the initial population using the displacement or relocation procedure. This manipulated population is given to Genetic Algorithm (GA) and continues until a certain iteration. j60data on the PSPLIB website was used to evaluate the suggested approach. The findings indicate that the implemented approach has improved by 21.75% compared to the normal GA. This improvement means that a better solution could be achieved in less time with fewer calls.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2025 | Volume: 10 | Issue: 4 | Views: 639

 
2.

Integrated multi-resource planning and scheduling in engineering project Pages 11-26 PDF Download PDF

Authors: Samer Ben Issa, Yiliu Tu

doi 10.5267/j.jpm.2017.5.003

🔑 Keywords: Integrated planning and scheduling process, Resource constrained project scheduling problem (RCPSP), Activities splitting, Minimum Moments of Resources Required (MMORR)

Abstract:
Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR)”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 2458

 

® 2010-2026 GrowingScience.Com