Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (54)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

Performance evaluation of project management system based on combination of EFQM and QFD Pages 171-182 PDF Download PDF

Authors: Amin Ahmadi Digehsara, Hassan Rezazadeh, Mohamad Soleimani

doi 10.5267/j.jpm.2018.4.003

🔑 Keywords: PMS, Performance evaluation, European Foundation for Quality Management (EFQM), Quality Function Deployment (QFD)

Abstract:
Project management system (PMS) is broadly recognized as the effective management tool for several organizations. European Foundation of Quality Management (EFQM) model provides some advantages for companies to be successful in current competitive environment. This paper is based on the combination of EFQM and Quality function deployment (QFD) in order to eval-uate a PMS in an aviation organization. Although, an integration of these models increases the system complexity, the implementation of EFQM-QFD helps us identify all noteworthy success factors of PMS within the organization. In addition, the current status of PMS performance is evaluated based on these factors. This study attempts to find out how organizations ought to be managed to take full advantage of PMS tools. This study uses a comprehensive questionnaire to find all critical factors influencing on the success of the organization. The method of this paper is implemented in an organization in aviation industry with several management departments.
Details
  • 85
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2018 | Volume: 3 | Issue: 4 | Views: 3384

 
2.

Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT) Pages 183-196 PDF Download PDF

Authors: Farhad Habibi, Omid Taghipour Birgani, Henk Koppelaar, Stojan Radenović

doi 10.5267/j.jpm.2018.4.002

🔑 Keywords: Project management, Time estimation, Cost estimation, PERT, Fuzzy logic, Trapezoidal fuzzy numbers

Abstract:
Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT). Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT) and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM) and the Project Evaluation and Review Technique (PERT). The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2018 | Volume: 3 | Issue: 4 | Views: 8820

 
3.

A fuzzy-TOPSIS approach for techno-economic viability of lighting energy efficiency measure in public building projects Pages 197-206 PDF Download PDF

Authors: Khadeejah Adebisi Abdulsalam, Desmond Eseoghene Ighravwe, Moses Olubayo Babatunde

doi 10.5267/j.jpm.2018.4.001

🔑 Keywords: Lighting technology, Techno-economic criteria, Public buildings, Decision making, TOPSIS

Abstract:
Retrofitting technologies have helped to manage energy consumptions in residential, public and industrial buildings. However, understanding of the technical and economic considerations for selection of appropriate retrofitting technology is still evolving and divergent. Thus, this study presents a framework that combines techno-economic requirements as a means for evaluating the important retrofitting criteria and suitable lighting retrofit technologies for building projects. The framework is hinged on the unique features of entropy fuzzy and TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) methods. The analysis of the lighting technology selection was performed from technical, economic and techno-economic perspectives. During the application of the proposed framework, four lighting technologies (CFL, T5, E-ballast and T8-electronic) and nine techno-economic criteria were considered. The most and least important techno-economic criteria for the case study were net present value and electricity saved, respectively. The least and most suitable retrofitting technologies were T8-electronic and CFL, respectively, from techno-economic perspective. T5 and T8-electronic were identified as the most suitable lighting technologies from an economic and technical perspectives, respectively. This discrepancy in the results justified the need for the techno-economic approach for the retrofitting technologies evaluation.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2018 | Volume: 3 | Issue: 4 | Views: 2133

 
4.

Application of TODIM (TOmada de Decisao Interativa Multicriterio) method for under-construction housing project selection in Kolkata Pages 207-216 PDF Download PDF

Authors: Shankar Chakraborty, Abkishek Chakraborty

doi 10.5267/j.jpm.2018.3.002

🔑 Keywords: Under-construction, Housing project, TODIM method, Risk, Rank

Abstract:
The paper focuses on the application of TODIM (TOmada de Decisao Interativa Multicriterio), which means in Portuguese ‘interactive and multi-criteria decision making’) method in identify-ing the most attractive and affordable under-construction housing project in the city of Kolkata in India. In this decision making problem, 14 under-construction housing projects spanning in and around Kolkata are evaluated with respect to ten important criteria. The deployment of TODIM method can well be validated with respect to its ability to deal with both qualitative and quantitative criteria in the presence of risk factors. This method is also acknowledged to be a robust tool being almost unaffected by the varying values of the attenuation factor of losses. Using TODIM method, an under-construction housing project at Rajarhat in the eastern fringes of Kolkata city is selected as the optimal choice while meeting the requirements of investors, inhabitants and other stakeholders.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2018 | Volume: 3 | Issue: 4 | Views: 4019

 

® 2010-2026 GrowingScience.Com