Processing, Please wait...

  • Publisher Home
  • Home
  • ๐Ÿ”™ Back
  • ๐Ÿ“š Journals
    • โš™๏ธ IJIEC - Industrial Engineering Computations
    • ๐ŸŒ IJDNS - Data and Network Science
    • ๐Ÿงช CCL - Current Chemistry Letters
    • ๐Ÿ’น AC - Accounting
    • ๐ŸŽฏ DSL - Decision Science Letters
    • ๐Ÿš› USCM - Uncertain Supply Chain Management
    • ๐Ÿ—๏ธ JPM - Journal of Project Management
    • ๐Ÿฅ HE - Healthcare Engineering
    • ๐Ÿ“ˆ SCI - Scientometrica
    • ๐Ÿ”ฉ ESM - Engineering Solid Mechanics
    • ๐ŸŒฟ JFS - Journal of Future Sustainability
    • ๐Ÿ’ผ MSL - Management Science Letters
  • ๐Ÿ“ Submit Article
  • ๐Ÿ“Š Statistics
  • ๐Ÿ“‹ About
    • ๐Ÿ“„ About Us
    • ๐Ÿ“ฐ Blog
    • ๐Ÿ“ข News
    • ๐Ÿ“ง Contact
  • ๐Ÿ“บ Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management

โญ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (54)
  • SCI (53)

JPM Volumes

    • โ–ผ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • โ–ผ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • โ–ผ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • โ–ผ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • โ–ผ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • โ–ผ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • โ–ผ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • โ–ผ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • โ–ผ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • โ–ผ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • โ–ผ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

๐Ÿ”‘ Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Social media(80)


» Show all keywords

โœ๏ธ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

๐ŸŒ Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: ๐Ÿ“– Volume | ๐Ÿ“… Date | โญ Most Rates | ๐Ÿ‘๏ธ Most Views | ๐Ÿš€ Rising Stars | ๐Ÿ”— Citations (Scopus) | ๐Ÿ”ฅ Hot Papers
1.

A modified earned value management using activity based costing Pages 41-54 PDF Download PDF

Authors: Vahid Aminian, Amir Rahimi Nejad, Seyyed Taha Hossein Hossein Mortaji, Morteza Bagherpour

doi 10.5267/j.jpm.2017.3.002

๐Ÿ”‘ Keywords: Earned value management, Activity based costing, Overhead cost, Revised schedule performance index, Revised cost performance index

Abstract:
Earned Value Management (EVM) has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project performance. This system relies on a set of often straightforward metrics to measure and evaluate the general health of a project. These metrics serve as early warning signals to timely detect project problems, or to exploit project opportunities. A key aspect of EVM is to estimate the completion cost of a project by considering both cost and schedule performance indices. However, good performance of cost and schedule performance indices does not necessarily guarantee cost effectiveness of the project regardless of the overhead costs. The reason is because, in most project-based organizations, overhead costs constitute a significant proportion of the total costs. However, EVM indices are usually calculated in the absence of the so-called overhead costs. This paper, first, seeks to remedy this problem by proposing a practical procedure of allocating overhead costs in project-based organizations. Then the traditional EVM indices are revised by consider-ing the allocated overhead costs. Finally, a case study demonstrates the applicability of the proposed method for a real-life project.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2016 | Volume: 1 | Issue: 2 | Views: 3698

 
2.

Application of multistage process control methodology for software quality management Pages 55-66 PDF Download PDF

Authors: Boby John, R. S. Kadadevaramath, I. A. Edinbarough

doi 10.5267/j.jpm.2017.2.001

๐Ÿ”‘ Keywords: Quantitative project manage-ment, Defect density, Classification and regression tree, Ridge regression, Multistage process control

Abstract:
As the need for software increased, the number of software firms and the competition among them also increased. The software companies in developing countries like India can no longer survive based on cost advantage alone. The firms need to deliver competitively priced quality software products on time. This can be achieved through quantitatively managing the different phases or sub processes in software development process. But quantitative management of a process consisting of a set of interlinked sub processes or stages with the output of one sub pro-cess influencing that of subsequent stages and final output is not easy. The process performance models developed for quantitative management of software development process often model the final outcome in terms of factors from various stages together or focuses only on quantitatively managing a particular sub process independently. In manufacturing and other engineering indus-tries, the processes with multiple sub process are monitored and controlled using multistage pro-cess control methodology. This paper is an application of multistage statistical process control for managing the software development process. The suggested methodology is a combination of process performance models and control charts. The proposed methodology can be easily im-plemented for controlling various types of software projects like development projects, incre-mental development projects, testing projects etc. The methodology also provides the project manager the opportunity to tighten or relax the control at various sub processes based on the pro-ject teamโ€™s strengths and still achieve the goal on the final outcome.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2016 | Volume: 1 | Issue: 2 | Views: 2148

 
3.

Implementation of multi-criteria decision making approach for the team leader selection in IT sector Pages 67-75 PDF Download PDF

Authors: Sandhya Sandhya, R. K. Garg, Rakesh Garg

doi 10.5267/j.jpm.2017.3.001

๐Ÿ”‘ Keywords: Team Leader, Multi-criteria decision making, EDBA

Abstract:
In the era of technology, the demand of the software development increases at a very high speed, as software has touched the humanโ€™s life in all aspects. The better quality software development acquiring minimum development time leads to the team work in which a group of people has been formed that work together in a team for the software development. One of the most significant issues in effective and efficient teamwork is the team leader selection because the team lead-er is the person in any team that is going to handle all types of managerial activities such as leadership, motivation to others, etc. The team leader selection process may be dependent on numerous conflicting selection indexes that make it a Multi-Criteria Decision Making (MCDM) problem. In the present research, an MCDM approach namely, Euclidean Distance Based Approximation (EDBA) which is based on the calculation of the composite distance value for each alter-native from a hypothetical optimal point is presented. The result of this study provides a comprehensive ranking of team leaders that leads to the right selection of team leader in information technology (IT) sector.

Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2016 | Volume: 1 | Issue: 2 | Views: 2174

 

® 2010-2026 GrowingScience.Com