Growing Science » Journal of Project Management » A modified earned value management using activity based costing

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1099)
  • ESM (428)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (37)
  • SCI (36)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • Volume 11 (46)
      • Issue 1 (24)
      • Issue 2 (22)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
Sustainability(87)
Artificial intelligence(87)
optimization(87)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Knowledge Management(79)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2198)
Indonesia(1311)
Jordan(815)
India(798)
Vietnam(510)
Saudi Arabia(478)
Malaysia(447)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(115)
Turkey(114)
Ukraine(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(87)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 1 Issue 2 pp. 41-54 , 2016

A modified earned value management using activity based costing Pages 41-54 Right click to download the paper Download PDF

Authors: Vahid Aminian, Amir Rahimi Nejad, Seyyed Taha Hossein Hossein Mortaji, Morteza Bagherpour

DOI: 10.5267/j.jpm.2017.3.002

Keywords: Earned value management, Activity based costing, Overhead cost, Revised schedule performance index, Revised cost performance index

Abstract: Earned Value Management (EVM) has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project performance. This system relies on a set of often straightforward metrics to measure and evaluate the general health of a project. These metrics serve as early warning signals to timely detect project problems, or to exploit project opportunities. A key aspect of EVM is to estimate the completion cost of a project by considering both cost and schedule performance indices. However, good performance of cost and schedule performance indices does not necessarily guarantee cost effectiveness of the project regardless of the overhead costs. The reason is because, in most project-based organizations, overhead costs constitute a significant proportion of the total costs. However, EVM indices are usually calculated in the absence of the so-called overhead costs. This paper, first, seeks to remedy this problem by proposing a practical procedure of allocating overhead costs in project-based organizations. Then the traditional EVM indices are revised by consider-ing the allocated overhead costs. Finally, a case study demonstrates the applicability of the proposed method for a real-life project.

How to cite this paper
Aminian, V., Nejad, A., Mortaji, S & Bagherpour, M. (2016). A modified earned value management using activity based costing.Journal of Project Management, 1(2), 41-54.

Refrences
Aliverdi, R., Moslemi Naeni, L., & Salehipour, A. (2013). Monitoring project duration and cost in a construction project by applying statistical quality control charts. International Journal of Project Management, 31(3), 411-423.
Anbari, F. T. (2003). Earned Value Project Management, Method and Extensions. Project Management Journal, 12-23.
Bagherpour, M., Zareei, A., Noori, S., & Heydari, M. (2010). Designing a control mechanism using earned value analysis: an application to production environment. The International Journal of Advanced Manufacturing Technology, 49(5-8), 419-429.
Benjaoran, V., Kaewsikhoa, A., & Tabyang, W. (2007). A Development of Practical Cost Control System for Small and Medium-sized Contractors. Suranaree Journal of Science and Technology, 15(1), 1-11.
Bogdănoiu, C. (2009). Activity Based Cost from the Perspective of Competitive Advantage. Journal of Applied Economic Sciences (JAES), 7, 5-11.
Charles, S., & Hansen, D. R. (2008). An evaluation of activity-based costing and functional-based costing: A game-theoretic approach. International Journal of Production Economics, 113(1), 282-296.
Cioffi, D. F. (2006). Designing project management: A scientific notation and an improved formalism for earned value calculations. International Journal of Project Management, 24(2), 136-144.
Cooper, R. (1987). Does your company need a new cost system. Journal of Cost Management, 1(1), 45-49.
Cooper, R. (1988). The rise of activity-based costing: part one: what is an activity-based cost system? Journal of Cost Management, 10(3), 45-54.
Cooper, R., & Kaplan, R. S. (1988). Measure costs right: make the right decisions. Harvard business review, 66(5), 96-103.
Drury, C. (1990). Drury, Colin. "Product Costing in the 1990s. Accountancy, 105, 122-130.
EunHong, K., Wells, W. G., & Duffey, M. R. (2003). A model for effective implementation of Earned Value Management methodology. International Journal of Project Management, 21(5), 375-382.
Fleming, Q. W., & Koppelman, J. M. (2010). Earned Value Project Management. Project Management Institute.
Henderson, K. (2003). Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data. The Measurable News, 3, 13-23.
Henderson, K. (2004). Further developments in earned schedule. The Measurable News, 1, 15-22.
Kaplan, R., & Anderson, S. R. (2007). Time-driven activity-based costing: a simpler and more powerful path to higher profits. Harvard business press.
Kuchta, D., & Troska, M. (2007). Activity-based costing and customer profitability. Cost Management, 21(3), 18-25.
Lipke, W. H. (1999). Applying Management Reserve to Software Project Management. Journal of Defense Software Engineering(3), 17-21.
Lipke, W. H. (2003). Schedule Is Different. The Measurable News, 31-34.
Lipke, W. H. (2009). Earned Schedule. Chicago: Lulu.
Lipke, W. H., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International journal of project management, 27(4), 400-407.
Mortaji, S., Bagherpour, M., & Mahdavi Mazdeh, M. (2013). Fuzzy Time-Driven Activity-Eased Costing. EMJ-ENGINEERING MANAGEMENT JOURNAL, 25(3), 63-73.
Mortaji, S., Bagherpour, M., & Noori, S. (2013). Fuzzy Earned Value Management Using L-R Fuzzy Numbers. Journal of Intelligent and Fuzzy Systems, 24(2), 323-332.
Moslemi Naeini, L., & Salehipour, A. (2011). Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert systems with Applications, 38(7), 8193-8199.
Naderpour, A., & Mofid, M. (2011). Improving Construction Management of an Educational Center by Applying Earned Value Technique. Procedia Engineering, 14, 1945-1952.
Pernot, E., Roodhooft, F., & Abbeele, A. (2007). Time-driven activity-based costing for inter-library services: a case study in a university. The Journal of Academic Librarianship, 33(5), 551-560.
PMI. (2013). A Guide for Project Management Body of Knowledge (4th ed.). Project Management Institute.
Ratnatunga, J., & Waldmann, E. (2010). Transparent Costing: Has the emperor got clothes? Accounting Forum, 34(3), 196-210.
Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 289-302.
Vanhoucke, M. (2009). Measuring Time: Improving Project Performance Using Earned Value Management. Springer.
Vanhoucke, M. (2012). Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis, and Project Control. Verlag Berlin Heidelberg: Springer.
Vitner, G., Rozenes, S., & Spraggett, S. (2006). Using data envelope analysis to compare project efficiency in a multi-project environment. International Journal of Project Management, 24(4), 323-329.
Warburton, R. D. (2011). A time-dependent earned value model for software projects. International Journal of Project Management, 29(8), 1082-1090.
Wi, H., Jungtae Mun, S., & Jung, M. (2009). Modeling and analysis of project team formation factors in a project-oriented virtual organization (ProVO). Expert Systems with Applications, 36(3), 5775-5783.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2016 | Volume: 1 | Issue: 2 | Views: 3496 | Reviews: 0

Related Articles:
  • Diagnosing the success of the construction projects during the initial phas ...
  • An ABC analysis for power generation project
  • Dynamic simulation for effective workforce management in new product develo ...
  • Determination and evaluation of the parameters influencing the virtual educ ...
  • A fuzzy neural network to estimate at completion costs of construction proj ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com