Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » A modified earned value management using activity based costing

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (55)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Knowledge Management(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Journal of Project Management
ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 1 Issue 2 pp. 41-54, 2016

A modified earned value management using activity based costing Pages 41-54 PDF Download PDF

Authors: Vahid Aminian, Amir Rahimi Nejad, Seyyed Taha Hossein Hossein Mortaji, Morteza Bagherpour

📋 Author Affiliations:
Vahid Aminian1, Amir Rahimi Nejad2, Seyyed Taha Hossein Mortaji1, Morteza Bagherpour ORCID 1
1 Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
2 Department of Management Business Administration, Sharif University of Technology, Tehran, Iran
doi 10.5267/j.jpm.2017.3.002
Crossref Source: CrossRef

🔑 Keywords: Earned value management, Activity based costing, Overhead cost, Revised schedule performance index, Revised cost performance index

Abstract: Earned Value Management (EVM) has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project performance. This system relies on a set of often straightforward metrics to measure and evaluate the general health of a project. These metrics serve as early warning signals to timely detect project problems, or to exploit project opportunities. A key aspect of EVM is to estimate the completion cost of a project by considering both cost and schedule performance indices. However, good performance of cost and schedule performance indices does not necessarily guarantee cost effectiveness of the project regardless of the overhead costs. The reason is because, in most project-based organizations, overhead costs constitute a significant proportion of the total costs. However, EVM indices are usually calculated in the absence of the so-called overhead costs. This paper, first, seeks to remedy this problem by proposing a practical procedure of allocating overhead costs in project-based organizations. Then the traditional EVM indices are revised by consider-ing the allocated overhead costs. Finally, a case study demonstrates the applicability of the proposed method for a real-life project.

How to cite this paper
APA: Aminian, V., Nejad, A., Mortaji, S & Bagherpour, M. (2016). A modified earned value management using activity based costing. Journal of Project Management, 1(2), 41-54.
Chicago/Turabian: Aminian, V., Nejad, A., Mortaji, S & Bagherpour, M. 2016. "A modified earned value management using activity based costing." Journal of Project Management 1, no. 2 (2016): 41-54.
AMA: Aminian, V., Nejad, A., Mortaji, S & Bagherpour, M. A modified earned value management using activity based costing. Journal of Project Management. 2016;1(2):41-54.

References
Aliverdi, R., Moslemi Naeni, L., & Salehipour, A. (2013). Monitoring project duration and cost in a construction project by applying statistical quality control charts. International Journal of Project Management, 31(3), 411-423.
Anbari, F. T. (2003). Earned Value Project Management, Method and Extensions. Project Management Journal, 12-23.
Bagherpour, M., Zareei, A., Noori, S., & Heydari, M. (2010). Designing a control mechanism using earned value analysis: an application to production environment. The International Journal of Advanced Manufacturing Technology, 49(5-8), 419-429.
Benjaoran, V., Kaewsikhoa, A., & Tabyang, W. (2007). A Development of Practical Cost Control System for Small and Medium-sized Contractors. Suranaree Journal of Science and Technology, 15(1), 1-11.
Bogdănoiu, C. (2009). Activity Based Cost from the Perspective of Competitive Advantage. Journal of Applied Economic Sciences (JAES), 7, 5-11.
Charles, S., & Hansen, D. R. (2008). An evaluation of activity-based costing and functional-based costing: A game-theoretic approach. International Journal of Production Economics, 113(1), 282-296.
Cioffi, D. F. (2006). Designing project management: A scientific notation and an improved formalism for earned value calculations. International Journal of Project Management, 24(2), 136-144.
Cooper, R. (1987). Does your company need a new cost system. Journal of Cost Management, 1(1), 45-49.
Cooper, R. (1988). The rise of activity-based costing: part one: what is an activity-based cost system? Journal of Cost Management, 10(3), 45-54.
Cooper, R., & Kaplan, R. S. (1988). Measure costs right: make the right decisions. Harvard business review, 66(5), 96-103.
Drury, C. (1990). Drury, Colin. "Product Costing in the 1990s. Accountancy, 105, 122-130.
EunHong, K., Wells, W. G., & Duffey, M. R. (2003). A model for effective implementation of Earned Value Management methodology. International Journal of Project Management, 21(5), 375-382.
Fleming, Q. W., & Koppelman, J. M. (2010). Earned Value Project Management. Project Management Institute.
Henderson, K. (2003). Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data. The Measurable News, 3, 13-23.
Henderson, K. (2004). Further developments in earned schedule. The Measurable News, 1, 15-22.
Kaplan, R., & Anderson, S. R. (2007). Time-driven activity-based costing: a simpler and more powerful path to higher profits. Harvard business press.
Kuchta, D., & Troska, M. (2007). Activity-based costing and customer profitability. Cost Management, 21(3), 18-25.
Lipke, W. H. (1999). Applying Management Reserve to Software Project Management. Journal of Defense Software Engineering(3), 17-21.
Lipke, W. H. (2003). Schedule Is Different. The Measurable News, 31-34.
Lipke, W. H. (2009). Earned Schedule. Chicago: Lulu.
Lipke, W. H., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International journal of project management, 27(4), 400-407.
Mortaji, S., Bagherpour, M., & Mahdavi Mazdeh, M. (2013). Fuzzy Time-Driven Activity-Eased Costing. EMJ-ENGINEERING MANAGEMENT JOURNAL, 25(3), 63-73.
Mortaji, S., Bagherpour, M., & Noori, S. (2013). Fuzzy Earned Value Management Using L-R Fuzzy Numbers. Journal of Intelligent and Fuzzy Systems, 24(2), 323-332.
Moslemi Naeini, L., & Salehipour, A. (2011). Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert systems with Applications, 38(7), 8193-8199.
Naderpour, A., & Mofid, M. (2011). Improving Construction Management of an Educational Center by Applying Earned Value Technique. Procedia Engineering, 14, 1945-1952.
Pernot, E., Roodhooft, F., & Abbeele, A. (2007). Time-driven activity-based costing for inter-library services: a case study in a university. The Journal of Academic Librarianship, 33(5), 551-560.
PMI. (2013). A Guide for Project Management Body of Knowledge (4th ed.). Project Management Institute.
Ratnatunga, J., & Waldmann, E. (2010). Transparent Costing: Has the emperor got clothes? Accounting Forum, 34(3), 196-210.
Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 289-302.
Vanhoucke, M. (2009). Measuring Time: Improving Project Performance Using Earned Value Management. Springer.
Vanhoucke, M. (2012). Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis, and Project Control. Verlag Berlin Heidelberg: Springer.
Vitner, G., Rozenes, S., & Spraggett, S. (2006). Using data envelope analysis to compare project efficiency in a multi-project environment. International Journal of Project Management, 24(4), 323-329.
Warburton, R. D. (2011). A time-dependent earned value model for software projects. International Journal of Project Management, 29(8), 1082-1090.
Wi, H., Jungtae Mun, S., & Jung, M. (2009). Modeling and analysis of project team formation factors in a project-oriented virtual organization (ProVO). Expert Systems with Applications, 36(3), 5775-5783.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Journal of Project Management | 📅 Year: 2016 | 📖 Volume: 1 | 📄 Issue: 2 | 👁️ Views: 3732 | 📊 Crossref:

Related Articles:
  • Diagnosing the success of the construction projects during the initial phases
  • An ABC analysis for power generation project
  • Dynamic simulation for effective workforce management in new product development
  • Determination and evaluation of the parameters influencing the virtual educational costs
  • A fuzzy neural network to estimate at completion costs of construction projects

📝 Ready to share your research?

Journal of Project Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com