Growing Science » Journal of Project Management » Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)
  • SCI (0)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)

Keywords

Jordan(161)
Supply chain management(160)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
Job satisfaction(79)
Social media(78)
Factor analysis(78)
TOPSIS(78)
Knowledge Management(77)
Genetic Algorithm(76)
Sustainability(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Ahmad Makui(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2162)
Indonesia(1276)
Jordan(783)
India(779)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(89)
Pakistan(84)
Peru(83)
United Kingdom(77)
Nigeria(77)
Morocco(73)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 8 Issue 1 pp. 37-44 , 2023

Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran Pages 37-44 Right click to download the paper Download PDF

Authors: Mohammad Reza Motallebi Zadeh, Amir Qayoumi

DOI: 10.5267/j.jpm.2022.8.003

Keywords: Delay, Construction Management, EPC Contracts, South Pars, Oil and Gas, Iran

Abstract: Delay is one of the most common causes of construction projects failure in Iran. The larger sizes of the projects, the more risks and costs of delays. In this paper, the causes of delays in EPC contracts of nonindustrial buildings were excavated from the related previous research and several interviews with experts of this subject, and adjusted by the brainstorming technique, Delphi and reconciling the nature of these projects. Then, a questionnaire was distributed among 52 experts working in the South Pars project, and the data were analyzed by descriptive and factor analysis methods. Descriptive analysis revealed that “Inflation and escalation of material prices and human resources salaries”, “Unrealistic contract duration and requirements imposed” and “Political situation” were the most significant delay factors. Meanwhile, factor analysis indicates that “Improper construction methods”, “Shortage of experienced and skilled labor” and “Long acceptance process (shop drawings, permits, tests and samples)” were the most important causes of delay.


How to cite this paper
Zadeh, M & Qayoumi, A. (2023). Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran.Journal of Project Management, 8(1), 37-44.

Refrences
Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International journal of project management, 18(1), 51-59.
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.
Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52(3), 387-406.
Chan, D. W., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of project management, 15(1), 55-63.
Du, L., Tang, W., Liu, C., Wang, S., Wang, T., Shen, W., . . . Zhou, Y. (2016). Enhancing engineer–procure–construct project performance by partnering in international markets: Perspective from Chinese construction companies. International Journal of Project Management, 34(1), 30-43.
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of project management, 21(5), 321-326.
Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., & Ani, A. C. (2011). Cause of construction delay-Theoretical framework. Procedia engineering, 20, 490-495.
Hung, M. S., & Wang, J. (2016). Research on delay risks of EPC hydropower construction projects in Vietnam. Journal of Power and Energy Engineering, 4(04), 9.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management & Economics, 15(1), 83-94.
Salama, M., El Hamid, M., & Keogh, B. (2008). Investigating the causes of delay within oil and gas projects in the UAE. 24th annual ARCOM conference,
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5), 517-526.
Senouci, A., Ismail, A., & Eldin, N. (2016). Time delay and cost overrun in Qatari public construction projects. Procedia engineering, 164, 368-375.
Sweis, R., Moarefi, A., Amiri, M. H., Moarefi, S., & Saleh, R. (2019). Causes of delay in Iranian oil and gas projects: a root cause analysis. International Journal of Energy Sector Management, 13(3), 630-650.

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2023 | Volume: 8 | Issue: 1 | Views: 985 | Reviews: 0

Related Articles:
  • Towards a sustainable construction industry: Delays and cost overrun causes ...
  • Analysis of delay factors and their effects on construction projects
  • Impact of supply chain risks on the completion for time of rural road proje ...
  • Factors causing mismanagement in public/private contracts: An Indonesian pe ...
  • Investigating different challenges in construction projects

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2025 GrowingScience.Com