Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Impact of supply chain risks on the completion for time of rural road projects in Bangladesh

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)

Keywords

Jordan(161)
Supply chain management(160)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
Job satisfaction(79)
Social media(78)
Factor analysis(78)
TOPSIS(78)
Knowledge Management(77)
Genetic Algorithm(76)
Sustainability(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Ahmad Makui(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2162)
Indonesia(1276)
Jordan(783)
India(779)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(89)
Pakistan(84)
Peru(83)
United Kingdom(77)
Nigeria(77)
Morocco(73)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 5 Issue 1 pp. 17-26 , 2020

Impact of supply chain risks on the completion for time of rural road projects in Bangladesh Pages 17-26 Right click to download the paper Download PDF

Authors: Fatima Tuz Johora Thakur, Ferdowi Easmin

DOI: 10.5267/j.jpm.2019.8.002

Keywords: Supply chain management, Supply chain risk, Rural road construction in Bangladesh, Completion time of rural roads project

Abstract: The volume of rural road construction projects has increased over the last decade in Bangladesh though these projects are experiencing failure in terms of time for completion. Therefore, this study focuses on nine risk factors specifically in case of Bangladesh. The objectives are to examine and quantify the contribution of supply chain risk factors on completion time of rural road projects and to assess the prioritization of iden-tified risks. An insignificant number of researches have been performed on the effect of supply chain risks on completion time of rural roads in Bangladesh. To the best of authors’ knowledge, the three factors such as, upper contract price, prolong rainy season and time of monitoring have not yet been used as independent variables in any re-search. A linear model has been drawn and the proposed model shows that upper contract price, delay of the site handover, delay of site materials mobilization, change of scope and prolong rainy season cause time overrun, whereas, time of monitoring, delay in payment and delay in submission of contract schedule did not have significant effect on time. These findings will help the government of Bangladesh take the necessary actions to complete the projects on time.

How to cite this paper
Thakur, F & Easmin, F. (2020). Impact of supply chain risks on the completion for time of rural road projects in Bangladesh.Journal of Project Management, 5(1), 17-26.

Refrences
Adam, A., Josephson, P. E., & Lindahl, G. (2015). Implications of cost overruns and time delays on ma-jor public construction projects. In Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate (pp. 747-758). Springer, Berlin, Heidelberg.
Ahmed, S. (2010). Problems of ADP implementation in Bangladesh: an analytical review (Doctoral dis-sertation, BRAC University).
Alam, K. (2015). Strategy for Infrastructure Sector Background Paper for the Seventh Five Year Plan.
Alaghbari, W. E., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing de-lay of building construction projects in Malaysia. Engineering, Construction and Architectural Man-agement, 14(2), 192-206.
Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International journal of project management, 18(1), 51-59.
Arthur, S., & Sheffrin, S. M. (2003). Economics: Principles in action’. Upper Saddle River, New Jersey 07458: Pearson Prentice Hall.
Anastasopoulos, P. C., Labi, S., Bhargava, A., & Mannering, F. L. (2011). Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), 390-398.
Chan, D. W., & Kumaraswamy, M. M. (2002). Compressing construction durations: lessons learned from Hong Kong building projects. International journal of project management, 20(1), 23-35.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International journal of project management, 30(4), 479-489.
Dutta, A., & Dutta, P. (2015). Causes of time and cost overruns in transportation sector projects in Bang-ladesh. International Journal of Economics and Management Studies, 2(4), 15-17.
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International journal of project management, 26(4), 431-438.
Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126-151.
Federal Ministry for Economic Cooperation and Development. (2013). Improving Rural Transport Infra-structure: experience from Bangladesh. Bonn: Federal Ministry for Economic Cooperation and Devel-opment.
Field, A. (2005). Discovering Statistics Using SPSS. 2nd edition. Sage Publication Ltd.: London.
Halwatura, R. U., & Ranasinghe, N. P. N. P. (2013). Causes of Variation Orders in Road Construction Projects in Sri Lanka. ISRN Construction Engineering, 1, 20-27.
Implementation Monitoring and Evaluation Division (IMED). ADP Progress Report 2014-15. Agargaon: IMED.
Jagtap, M., & Kamble, S. (2015). Evaluating the Modus Operandi of Construction Supply Chain using Organization Control Theory. International Journal of Construction Supply Chain Management, 5(1), 77-82.
Jeffrey, F. (2009). What in the world is infrastructure. PEI Infrastructure Investor (July/August), 30-32.
Kartam, N., & Kartam, S. (2001). Risk and its management in the Kuwaiti construction industry: A con-tractors’ perspective. International Journal of Project Management, 19(6), 325-335.
Lebo, J., & Schelling, D. (2001). Design and appraisal of rural transport infrastructure: ensuring basic access for rural communities (Vol. 23). World Bank Publications.
Mahamid, I. (2013). Common risks affecting time overrun in road construction projects in Palestine: Con-tractors’ perspective. Australasian Journal of Construction Economics and Building, 13(2), 45-53.
Mydin M.A.O., Sani, N. M., Taib, M., & Alias N. M. (2013). Imperative Causes of Delays in Construc-tion Projects from Developers’ Outlook. MATEC Web of Conferences.
Odeh, A. M., & Battaineh, H. T. (2002). Causes of Delay: traditional contract. International Journal of Project Management, 20(1), 67- 73.
Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996). Construction delays in a fast-growing econo-my: comparing Thailand with other economies. International Journal of Project Management, 14(1), 37-45.
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge. 5th ed. At-lanta: Project Management Institute Inc.
Project Management Institute. (2012). Study on Project Schedule and Cost Overrun. Retrieved from http://www.pmi.org.in/downloads/PMI_KPMG_2013.pdf [Accessed on 01 March, 2016].
Rajeswari, P. (2014). Land acquisition and rehabilitation – a great challenges to PPP projects. Interna-tional Journal of Commerce, Business and Management, 3(6), 858- 866.
US National Research Council. (1987). Infrastructure for the 21st Century. Washington D.C.: National Academy Press.
Wiguna, P. A. and Scott, S. (2005). Nature of the Critical Risk Factors Affecting Project Performance in Indonesian Building Contracts. In Proceedings of the 21st Annual ARCOM Conference, 2005, SOAS, University of London (pp. 225-35). London: Association of Researchers in Construction Management, London.
  • 68
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2020 | Volume: 5 | Issue: 1 | Views: 1454 | Reviews: 0

Related Articles:
  • Factors causing mismanagement in public/private contracts: An Indonesian pe ...
  • Impacts of change management on risk and cost management of a construction ...
  • Project scheduling and forecasting by laws of physical movement
  • Investigating different challenges in construction projects
  • An empirical study for ranking risk factors using linear assignment: A case ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2025 GrowingScience.Com