How to cite this paper
Thakur, F & Easmin, F. (2020). Impact of supply chain risks on the completion for time of rural road projects in Bangladesh.Journal of Project Management, 5(1), 17-26.
Refrences
Adam, A., Josephson, P. E., & Lindahl, G. (2015). Implications of cost overruns and time delays on ma-jor public construction projects. In Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate (pp. 747-758). Springer, Berlin, Heidelberg.
Ahmed, S. (2010). Problems of ADP implementation in Bangladesh: an analytical review (Doctoral dis-sertation, BRAC University).
Alam, K. (2015). Strategy for Infrastructure Sector Background Paper for the Seventh Five Year Plan.
Alaghbari, W. E., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing de-lay of building construction projects in Malaysia. Engineering, Construction and Architectural Man-agement, 14(2), 192-206.
Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International journal of project management, 18(1), 51-59.
Arthur, S., & Sheffrin, S. M. (2003). Economics: Principles in action’. Upper Saddle River, New Jersey 07458: Pearson Prentice Hall.
Anastasopoulos, P. C., Labi, S., Bhargava, A., & Mannering, F. L. (2011). Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), 390-398.
Chan, D. W., & Kumaraswamy, M. M. (2002). Compressing construction durations: lessons learned from Hong Kong building projects. International journal of project management, 20(1), 23-35.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International journal of project management, 30(4), 479-489.
Dutta, A., & Dutta, P. (2015). Causes of time and cost overruns in transportation sector projects in Bang-ladesh. International Journal of Economics and Management Studies, 2(4), 15-17.
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International journal of project management, 26(4), 431-438.
Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126-151.
Federal Ministry for Economic Cooperation and Development. (2013). Improving Rural Transport Infra-structure: experience from Bangladesh. Bonn: Federal Ministry for Economic Cooperation and Devel-opment.
Field, A. (2005). Discovering Statistics Using SPSS. 2nd edition. Sage Publication Ltd.: London.
Halwatura, R. U., & Ranasinghe, N. P. N. P. (2013). Causes of Variation Orders in Road Construction Projects in Sri Lanka. ISRN Construction Engineering, 1, 20-27.
Implementation Monitoring and Evaluation Division (IMED). ADP Progress Report 2014-15. Agargaon: IMED.
Jagtap, M., & Kamble, S. (2015). Evaluating the Modus Operandi of Construction Supply Chain using Organization Control Theory. International Journal of Construction Supply Chain Management, 5(1), 77-82.
Jeffrey, F. (2009). What in the world is infrastructure. PEI Infrastructure Investor (July/August), 30-32.
Kartam, N., & Kartam, S. (2001). Risk and its management in the Kuwaiti construction industry: A con-tractors’ perspective. International Journal of Project Management, 19(6), 325-335.
Lebo, J., & Schelling, D. (2001). Design and appraisal of rural transport infrastructure: ensuring basic access for rural communities (Vol. 23). World Bank Publications.
Mahamid, I. (2013). Common risks affecting time overrun in road construction projects in Palestine: Con-tractors’ perspective. Australasian Journal of Construction Economics and Building, 13(2), 45-53.
Mydin M.A.O., Sani, N. M., Taib, M., & Alias N. M. (2013). Imperative Causes of Delays in Construc-tion Projects from Developers’ Outlook. MATEC Web of Conferences.
Odeh, A. M., & Battaineh, H. T. (2002). Causes of Delay: traditional contract. International Journal of Project Management, 20(1), 67- 73.
Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996). Construction delays in a fast-growing econo-my: comparing Thailand with other economies. International Journal of Project Management, 14(1), 37-45.
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge. 5th ed. At-lanta: Project Management Institute Inc.
Project Management Institute. (2012). Study on Project Schedule and Cost Overrun. Retrieved from http://www.pmi.org.in/downloads/PMI_KPMG_2013.pdf [Accessed on 01 March, 2016].
Rajeswari, P. (2014). Land acquisition and rehabilitation – a great challenges to PPP projects. Interna-tional Journal of Commerce, Business and Management, 3(6), 858- 866.
US National Research Council. (1987). Infrastructure for the 21st Century. Washington D.C.: National Academy Press.
Wiguna, P. A. and Scott, S. (2005). Nature of the Critical Risk Factors Affecting Project Performance in Indonesian Building Contracts. In Proceedings of the 21st Annual ARCOM Conference, 2005, SOAS, University of London (pp. 225-35). London: Association of Researchers in Construction Management, London.
Ahmed, S. (2010). Problems of ADP implementation in Bangladesh: an analytical review (Doctoral dis-sertation, BRAC University).
Alam, K. (2015). Strategy for Infrastructure Sector Background Paper for the Seventh Five Year Plan.
Alaghbari, W. E., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing de-lay of building construction projects in Malaysia. Engineering, Construction and Architectural Man-agement, 14(2), 192-206.
Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International journal of project management, 18(1), 51-59.
Arthur, S., & Sheffrin, S. M. (2003). Economics: Principles in action’. Upper Saddle River, New Jersey 07458: Pearson Prentice Hall.
Anastasopoulos, P. C., Labi, S., Bhargava, A., & Mannering, F. L. (2011). Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), 390-398.
Chan, D. W., & Kumaraswamy, M. M. (2002). Compressing construction durations: lessons learned from Hong Kong building projects. International journal of project management, 20(1), 23-35.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International journal of project management, 30(4), 479-489.
Dutta, A., & Dutta, P. (2015). Causes of time and cost overruns in transportation sector projects in Bang-ladesh. International Journal of Economics and Management Studies, 2(4), 15-17.
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International journal of project management, 26(4), 431-438.
Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126-151.
Federal Ministry for Economic Cooperation and Development. (2013). Improving Rural Transport Infra-structure: experience from Bangladesh. Bonn: Federal Ministry for Economic Cooperation and Devel-opment.
Field, A. (2005). Discovering Statistics Using SPSS. 2nd edition. Sage Publication Ltd.: London.
Halwatura, R. U., & Ranasinghe, N. P. N. P. (2013). Causes of Variation Orders in Road Construction Projects in Sri Lanka. ISRN Construction Engineering, 1, 20-27.
Implementation Monitoring and Evaluation Division (IMED). ADP Progress Report 2014-15. Agargaon: IMED.
Jagtap, M., & Kamble, S. (2015). Evaluating the Modus Operandi of Construction Supply Chain using Organization Control Theory. International Journal of Construction Supply Chain Management, 5(1), 77-82.
Jeffrey, F. (2009). What in the world is infrastructure. PEI Infrastructure Investor (July/August), 30-32.
Kartam, N., & Kartam, S. (2001). Risk and its management in the Kuwaiti construction industry: A con-tractors’ perspective. International Journal of Project Management, 19(6), 325-335.
Lebo, J., & Schelling, D. (2001). Design and appraisal of rural transport infrastructure: ensuring basic access for rural communities (Vol. 23). World Bank Publications.
Mahamid, I. (2013). Common risks affecting time overrun in road construction projects in Palestine: Con-tractors’ perspective. Australasian Journal of Construction Economics and Building, 13(2), 45-53.
Mydin M.A.O., Sani, N. M., Taib, M., & Alias N. M. (2013). Imperative Causes of Delays in Construc-tion Projects from Developers’ Outlook. MATEC Web of Conferences.
Odeh, A. M., & Battaineh, H. T. (2002). Causes of Delay: traditional contract. International Journal of Project Management, 20(1), 67- 73.
Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996). Construction delays in a fast-growing econo-my: comparing Thailand with other economies. International Journal of Project Management, 14(1), 37-45.
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge. 5th ed. At-lanta: Project Management Institute Inc.
Project Management Institute. (2012). Study on Project Schedule and Cost Overrun. Retrieved from http://www.pmi.org.in/downloads/PMI_KPMG_2013.pdf [Accessed on 01 March, 2016].
Rajeswari, P. (2014). Land acquisition and rehabilitation – a great challenges to PPP projects. Interna-tional Journal of Commerce, Business and Management, 3(6), 858- 866.
US National Research Council. (1987). Infrastructure for the 21st Century. Washington D.C.: National Academy Press.
Wiguna, P. A. and Scott, S. (2005). Nature of the Critical Risk Factors Affecting Project Performance in Indonesian Building Contracts. In Proceedings of the 21st Annual ARCOM Conference, 2005, SOAS, University of London (pp. 225-35). London: Association of Researchers in Construction Management, London.