Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Tags cloud » Construction Management

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Sort articles by: 📖 Volume | 📅 Date | ⭐ Most Rates | 👁️ Most Views | 🚀 Rising Stars | 🔗 Citations (Scopus) | 🔥 Hot Papers
1.

The effect of permit approval efficiency on construction project schedule performance in the Saudi construction sector: the moderating role of contractor experience and the controlling role of legal complexity Pages 841-850 PDF Download PDF

Authors: Bashir Alrayah Hamed Mohammed

doi 10.5267/j.jpm.2026.4.008

🔑 Keywords: Permit approval efficiency, Contractor experience, Legal complexity, Schedule performance, Construction management

Abstract:
Construction project delays remain a persistent challenge globally, which may obstruct the economic development of a country. In Saudi Arabia, there has been a large investment in the construction sector as per Vision 2030. However, the drivers of Schedule Performance (SP) have never been investigated in the construction sector. Thus, this study aims to examine the moderating role of contractor experience on the association between Permit Approval Efficiency (PAE) and construction project SP by controlling legal complexity in the model. For this purpose, the data from a sample of 196 respondents has been collected from construction professionals by purposive sampling and analyzed through PLS-SEM. The results confirm that contractor experience improves SP. Legal complexity also positively enhances PAE. Moreover, PAE directly improves SP. However, contractor experience could not moderate the PAE and SP nexus. The findings suggest that Saudi regulators should further follow digitizing permit processes to improve efficient permitting benefits, which can support legal frameworks for PAE. So, both digital transformation and regulatory quality could enhance schedule improvements in Saudi construction projects simultaneously.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2026 | Volume: 11 | Issue: 3 | Views: 151

 
2.

Investigating the impact of lean construction principles on contractors’ project performance in Ethiopia using PLS-SEM Pages 227-238 PDF Download PDF

Authors: Achamyelew Maru, Wubshet Jekale, Belachew Asteray

doi 10.5267/j.jpm.2024.4.004

🔑 Keywords: Construction management, Lean principles, Project performance, Partial least squares structure equation modeling (PLS-SEM)

Abstract:
The construction industry faces challenges, such as schedule overruns, cost overruns, poor quality, and safety issues. Lean construction is a valuable concept for waste reduction and improving project performance. This study explored the impact of lean construction principles on contractors' project performance in Ethiopia. Using a quantitative method and simple random sampling technique, 159 respondents from construction companies were selected. This study introduced partial least squares structural equation modeling (PLS-SEM) in the study area. The results showed that process/technology lean principles, people/culture lean principles, and integrated project delivery variables had a direct positive impact on contractor performance. There was also a significant indirect relationship between process/technology-lean construction principles and project performance with a complementary partial mediation effect. However, no significant indirect associations were found between people/culture-lean construction principles and project performance through mediation of onsite construction waste management. The study used FIMIX-PLS to test robustness and detect hidden heterogeneity at non-critical levels. The findings provide researchers and practitioners to identify the influences that are critical for contractors’ projects performance improvement, and that results in the best possible outcome.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2024 | Volume: 9 | Issue: 3 | Views: 2533

 
3.

Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran Pages 37-44 PDF Download PDF

Authors: Mohammad Reza Motallebi Zadeh, Amir Qayoumi

doi 10.5267/j.jpm.2022.8.003

🔑 Keywords: Delay, Construction Management, EPC Contracts, South Pars, Oil and Gas, Iran

Abstract:
Delay is one of the most common causes of construction projects failure in Iran. The larger sizes of the projects, the more risks and costs of delays. In this paper, the causes of delays in EPC contracts of nonindustrial buildings were excavated from the related previous research and several interviews with experts of this subject, and adjusted by the brainstorming technique, Delphi and reconciling the nature of these projects. Then, a questionnaire was distributed among 52 experts working in the South Pars project, and the data were analyzed by descriptive and factor analysis methods. Descriptive analysis revealed that “Inflation and escalation of material prices and human resources salaries”, “Unrealistic contract duration and requirements imposed” and “Political situation” were the most significant delay factors. Meanwhile, factor analysis indicates that “Improper construction methods”, “Shortage of experienced and skilled labor” and “Long acceptance process (shop drawings, permits, tests and samples)” were the most important causes of delay.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2023 | Volume: 8 | Issue: 1 | Views: 1325

 
4.

Causes of government construction projects’ abandonment Pages 179-190 PDF Download PDF

Authors: Isaac Sakyi Damoah, Anthony Ayakwa, Desmond Kwadjo Kumi

doi 10.5267/j.jpm.2021.5.004

🔑 Keywords: Construction management, Construction sector, Culture, Developing country, Politics

Abstract:
Government construction projects are vital to the economic development of developing countries. However, although most of these projects suffer from abandonment, little evidence exists concerning the causes that account for this setback. This paper investigates the causes of government construction project abandonment in Ghana. We used a sequential data collection approach, in-depth semi-structured interviews, and questionnaire surveys to solicit the views of project management practitioners, contractors, and clients associated with Ghana government construction project implementation. Using factor analysis and structural equation modelling, we find that Ghanaian government construction project abandonment is influenced by five sets of causes: political leadership, culture, external forces, resources (including funding) and administrative/institutional bottlenecks. Three of these sets of causes – political leadership, cultural and external forces, are the primary causes, while resources (including funding) and administrative/institutional causes are secondary causes.
Details
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: JPM | Year: 2021 | Volume: 6 | Issue: 4 | Views: 3382

 

® 2010-2026 GrowingScience.Com