Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 3 Issue 5 pp. 703-720, 2012

An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors Pages 703-720 PDF Download PDF

Authors: J.T. Hsu, L.F. Hsu

📋 Author Affiliations:
J.T. Hsu1, L.F. Hsu2
1 Department of Computer Science and Information Engineering, Hungkuang University, Shalu, Taichung 43302, Taiwan, N/A
2 Department of Management, Baruch College, The City University of New York, New York, NY 10010, One Bernard Baruch Way, BOX B9-240, United States, N/A
doi 10.5267/j.ijiec.2012.04.004
57 Source: Scopus
Crossref 23 Source: CrossRef

🔑 Keywords: EOQ, Imperfect quality, Misclassification errors, Supply chain

Abstract: In this paper, we develop an integrated vendor-buyer production-inventory model for items with imperfect quality and inspection errors. The production process is imperfect and produces a certain number of defective items with a known probability density function. We consider the policy in which the delivery quantity to the buyer is identical at each shipment. Once the buyer receives the lot, a 100% screening process of the lot is conducted, and the screening process and demand proceed simultaneously. The screening process is not perfect. The inspector may incorrectly classify a non-defective item as defective, or incorrectly classify a defective item as non-defective. The expected integrated total annual cost of the vendor and the buyer is derived and a solution procedure is provided to find the optimal solution. Numerical examples show that the integrated model gives an impressive cost reduction in comparison to an independent decision by the buyer.

How to cite this paper
APA: Hsu, J & Hsu, L. (2012). An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations, 3(5), 703-720.
Chicago/Turabian: Hsu, J & Hsu, L. 2012. "An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors." International Journal of Industrial Engineering Computations 3, no. 5 (2012): 703-720.
AMA: Hsu, J & Hsu, L. An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations. 2012;3(5):703-720.

References
Aderohunmu, R., Mobolurin, A., & Bryson, N. (1995). Joint vendor–buyer policy in JIT manufacturing. Journal of the Operational Research Society, 46, 375–385.

Ben-Daya, M., & Hariga, M. (2000). Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 51, 875–881.

Ben-Daya, M., & Al-Nassar, A. (2008). An integrated inventory production system in a three- layer supply chain. Production Planning and Control, 19, 97-104.

Ben-Daya, M., Darwish, M., & Ertogral, K. (2008). The joint economic lot sizing problem: Review and extensions. European Journal of Operational Research, 185, 726-742.

Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292–311.

C?rdenas-Barr?n, L.E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57, 1105-1113.

Chan, C., & Kingsman, B. (2007). Coordination in a single-vendor multi-buyer supply chain by synchronizing delivery and production cycles. Transportation Research Part E, 43, 90-111.
Chang, H.C., Ouyang, L.Y., Wu, K.S., & Ho, C.H. (2006). Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research, 170, 481-495.

Chung, K.J. (2008). An improvement of an integrated single-vendor single-buyer inventory model with shortage. Production Planning and Control, 19, 275-277.

Chung, K.J.(2011). The economic production quantity with rework process in supply chain management. Computers and Mathematics with Applications, 62, 2547-2550.

Duffuaa, S.O., & Khan, M. (2002). An optimal repeat inspection plan with several classifications. Journal of the Operational Research Society, 53, 1016-1026.

Duffuaa, S.O., & Khan, M. (2005). Impact of inspection errors on the performance measures of a general repeat inspection plan. International Journal of Production Research, 43, 4945-4967.

Ertogral, K., Darwish, M., & Ben-Daya, M. (2007). Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost. European Journal of Operational Research, 176, 1592-1606.

Goyal, S.K.(1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 107-111.

Goyal, S.K.(1988). A joint economic-lot-size model for purchaser and vendor: a comment. Decision Sciences, 19, 236–241.

Goyal, S.K.(1995). A one-vendor multi-buyer integrated inventory model: a comment. European Journal of Operational Research, 82, 209–210.

Goyal, S.K., & C?rdenas-Barr?n, L.E. (2002). Note on: economic production quantity model for items with imperfect quality – a practical approach. International Journal of Production Economics, 77, 85–87.

Goyal, S.K., & Gupta, Y.P. (1989). Integrated inventory models: the buyer–vendor Coordination. European Journal of Operational Research, 41, 261–269.

Goyal, S.K., Huang, C.K., & Chen, K.C. (2003). A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning and Control 14 (7), 596-602.

Goyal, S.K., & Nebebe, F. (2000). Determination of economic production–shipment policy for a single-vendor single-buyer system. European Journal of Operational Research, 121, 175-178.

Goyal, S.K., & Szendrovits, A.Z. (1986). A constant lot size model with equal and unequal size batch shipments between production stages. Engineering Costs and Production Economics, 10, 203–210.

Ha, D., & Kim, S.L. (1997). Implementation of JIT purchasing: an integrated approach. Production Planning and Control, 8,152–157.

Hill, R.M. (1997). The single-vendor single-buyer integrated production–inventory model with a generalized policy. European Journal of Operational Research, 97, 493–499.

Hill, R.M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production– inventory model. International Journal of Production Research, 37, 2463-2475.

Hill, R.M., & Omar, M. (2006). Another look at the single-vendor single-buyer integrated production inventory problem. International Journal of Production Research, 44, 791-800.

Hoque, M.A., & Goyal, S.K. (2000). An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65, 305–315.

Hoque, M.A., & Goyal, S.K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102, 217-225.

Hsu, L.F. (2012) A note on "An economic order quantity (EOQ) for items with imperfect quality and inspection errors." International Journal of Industrial Engineering Computations, 3, 695-702.

Huang, C.K. (2002). An integrated vendor–buyer cooperative inventory model for items with imperfect quality. Production Planning and Control, 13, 355–361.

Huang, C.K. (2004). An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98.

Huang, C.K., Tsai, D.M., Wu, J.C., & Chung, K.J. (2010a). An integrated vendor–buyer inventory model with order-processing cost reduction and permissible delay in payments. European Journal of Operational Research, 202, 473-478.

Huang, C.K., Tsai, D.M., Wu, J.C., & Chung, K.J. (2010b). An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. International Journal of Production Economics, 128, 445-451.

Khan, M., Jaber, M.Y., Guiffrida, A.L., & Zolfaghari, S. (2011a). A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 132, 1-12.

Khan, M., Jaber, M.Y., & Maurice, B. (2011b). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133, 113-118.

Kok, A.G., & Shang, K.H. (2007). Inspection and replenishment policies for systems with inventory record inaccuracy. Manufacturing and Service Operations Management, 9, 185-205.

Lee, H.L., & Rosenblatt, M.J. (1987). Simultaneous determination of production cycles and inspection schedules in a production system. Management Science, 33, 1125–1137.

Liao, G.L., & Sheu, S.H. (2011). Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. International Journal of Production Economics, 130, 118-124.

Lin, T.Y. (2009). Optimal policy for a simple supply chain system with defective items and returned cost under screening errors. Journal of the Operations Research Society of Japan, 52, 307-320.

Lo, S.T., Wee, H.M., & Huang, W.C. (2007). An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation. International Journal of Production Economics, 106, 248-260.

Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.

Ouyang, L.Y., Wu, K.S., & Ho, C.H. (2004). Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics, 92, 255-266.

Porteus, E.L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137–144.

Raouf, A., Jain, J.K., & Sathe, P.T. (1983). A cost-minimization model for multicharacteristic component inspection. IIE Transactions, 15, 187-194.

Salameh, M.K., & Jaber, M.Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59-64.

Sana, S.S. (2010). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201, 158-170.

Sarmah, S.P., Acharya, D., & Goyal, S.K. (2006). Buyer vendor coordination models in supply chain management. European Journal of Operational Research, 175, 1-15.

Schwaller, R.L. (1988). EOQ under inspection costs. Production and Inventory Management, 29, 22–24.

Siajadi, H., Ibrahim, R., & Lochert, P. (2006). A single-vendor multiple-buyer inventory model with a multiple-shipment policy. International Journal of Advanced Manufacturing Technology, 27, 1030-1037.

Viswanathan, S. (1998). Optimal strategy for the integrated vendor–buyer inventory model. European Journal of Operational Research, 105, 38–42.

Wu, K.S., & Ouyang, L.Y. (2003). An integrated single-vendor single-buyer inventory system with shortage derived algebraically. Production Planning and Control, 14, 555-561.

Yoo, S.H., Kim, D., & Park, M.S.(2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121, 255-265.

Zhou, Y., & Wang, S. (2007). Optimal production and shipment models for a single-vendor-single-buyer integrated system. European Journal of Operational Research, 180, 309-328.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2012 | 📖 Volume: 3 | 📄 Issue: 5 | 👁️ Views: 10166 | 📊 Crossref: 23

Related Articles:
  • Stochastic integrated vendor–buyer model with unstable lead time and setup cost ,
  • Three stage supply chain model with two warehouse, imperfect production, variable demand rate and inflation
  • A note on "An economic order quantity (EOQ) for items with imperfect quality and inspection errors"
  • Genetic algorithm to optimize two-echelon inventory control system for perishable goods in terms of active packaging
  • Supply chain coordination for a deteriorating product under stock-dependent consumption rate and unreliable production process

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com