How to cite this paper
Rehman, M & Ishak, M. (2023). Moderation role of government acts, laws and policies between economic factors and risk management: A case study of Saudi Arabia contractors.Journal of Project Management, 8(4), 213-226.
Refrences
(SCA), S. C. (2021). Saudi Contractor Association. Muqawil: https://muqawil.org/
Aarons, H. (2021). A Practical introduction to survey design: A beginner's guide 1st edition. Sage.
Abd Karim, N. A., Rahman, I. A., Memon, A. H., Jamil, N., & Azis, A. A. A. (2012). Significant risk factors in construction projects: Contractor's perception. IEEE Colloquium on Humanities, Science and Engineering (CHUSER 2012), pp. 347-350. IEEE
Abusafiya, H. A., & Suliman, S. M. (2017). Causes and effects of cost overrun on construction project in Bahrain: Part I (Ranking of cost overrun factors and risk mapping). Modern Applied Science, 11(7), 20-27. https://doi.org/10.5539/mas.v11n7p20
Adeleke, A. Q., Bahaudin, A. Y., & Kamaruddeen, A. M. (2016). Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: A proposed framework. ICAST’16. 1761, pp. 020008-1-020008-6. AIP Publishing Ltd. https://doi.org/10.1063/1.4960848
Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W., & Sorooshian, S. (2018). The influence of organizational external factors on construction risk management among Nigerian construction companies. Safety and Health at Work, 9(1), 115-124. https://doi.org/10.1016/j.shaw.2017.05.004
Adeleke, A. Q., Nasidi, Y., & Bamgbade, J. A. (2016). Assessing the extent of effective construction risk management in Nigerian construction companies. Journal of Advanced Research in Business and Management Studies, 1-10.
Akanni, P. O., Oke, A. E., & Akpomiemie , O. A. (2015). Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal, 11(1), 91-97. https://www.doi.org/10.1016/j.hbrcj.2014.02.010
Algahtany, M., Alhammadi, Y., & Kashiwag, D. (2016). Introducing a new risk management model to the Saudi Arabian construction industry. International Conference on Sustainable Design, Engineering and Construction. 145, pp. 940-947. Procedia Engineering. https://doi.org/10.1016/j.proeng.2016.04.122
Andi, A. (2006). The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), 69–80. https://doi.org/10.1080/01446190500310338
Antón, A. J., Rodríguez, G. S., & López, Á. R. (2011). Financial risks in construction projects. African Journal of Business Management, 5(31), 12325-12328. https://www.doi.org/10.5897/AJBM11.1463
Apuke, O. D. (2017). Quantitative research methods a synopsis approach. Arabian Journal of Business and Management Review (Kuwait Chapter), 6(11), 40-47. https://www.doi.org/10.12816/0040336
Bachayo, A., Memon, A. H., Hussain, M., Rahman, I. A., & Ahmed, S. J. (2022). Risk level of design and procurement factors causing construction waste generation. Journal of Applied Engineering Sciences, 12(1). 11-16 https://doi.org/10.2478/jaes-2022-0002
Bajwa, I. A., & Syed, A. M. (2020). Identification of major construction sector risks in Saudi Arabia. World Transactions on Engineering and Technology Education, 18(2), 247-256.
Bakr, A. F., Hagla, K. E., & Rawash, A. N. (2012). Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management). Alexandria Engineering Journal, 51(4), 305-323. https://doi.org/10.1016/j.aej.2012.09.001
Becker, J.-M., Ringle, C. M., & Sarstedt, M. (2018). Estimating moderating effects in PLS-SEM and PLSc-SEM: Interaction Term Generation*Data Treatment. Journal of Applied Structural Equation Modeling, 2(2), 1-21. https://www.doi.org/10.47263/JASEM.2(2)01
Cheah, J.-H., Sarstedt, M., Ringle, C. M., Ramayah, T., & Ting, H. (2018). Convergent validity assessment of formatively measured constructs in PLS-SEM: On using single-item versus multi-item measures in redundancy analyses. International Journal of Contemporary Hospitality Management, 30(11), 3192-3210. https://doi.org/10.1108/IJCHM-10-2017-0649
Chin, W. W. (1998). The partial least squares approach to structural equation modeling. In G. A. Marcoulides, Modern Methods for Business Research (pp. 295-336). Lawrence Erlbaum Associates.
Chin, W. W. (2010). How to write up and report PLS analyses. In V. E. Vinzi, W. W. Chin, J. Henseler, & H. Wang, Handbook of Partial Least Squares: Concepts, Methods and Applications (Springer Handbooks of Computational Statistics) (pp. 655-690). Springer.
Cochran, W. G. (1963). Sampling Techniques 2nd ed., Wiley.
Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences Second Edition. Lawrence Erlbaum Associates Inc.
Crane, L., Gantz, G., Isaacs, S., Jose, D., & Sharp, R. (2013). Introduction to risk management 2nd edition. Extension Risk Management Education and Risk Management Agency.
Creswell, J. W., Fetters, M. D., & Ivankova, N. V. (2004). Designing a mixed methods study in primary care. The Annals of Family Medicine, 2(1), 7-12. https://www.doi.org/10.1370/afm.104
Devi, A. C., & Ananthanarayanan, K. (2017). Factors influencing cost over-run in Indian construction projects. International Conference on Advances in Sustainable Construction Materials and Civil Engineering Systems. 120, pp. 1-8. Sharjah: EDP Sciences. https://doi.org/10.1051/matecconf/201712002023
Dikmen, I., Birgonul, M. T., Anac, C., & Tah, J. G. (2008). Learning from risks: A tool for post-project risk assessment. Automation in Construction, 28(1), 42–50. https://doi.org/10.1016/j.autcon.2008.04.008
Dinu, A.-M. (2012). Modern methods of risk identification in risk management. International Journal of Academic Research in Economics and Management Sciences, 1(6), 67-71.
Dawson, J. F. (2014). Moderation in management research: What, why, when, and how. Journal of business and psy-chology, 29(1), 1-19. https://doi.org/10.1007/s10869-013-9308-7
El-Sayeg , S. M., & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6), 247-269. https://www.doi.org/10.1061/(ASCE)ME.1943-5479.0000365
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction company. International Journal of Project Management, 26(4), 431-438. https://doi.org/10.1016/j.ijproman.2007.07.004
Farid, W., Kureshi, N. I., Babar, S., & Mahmood, S. (2020). Critical risk factors of construction industry of Pakistan for improving project outcome. Mehran University Research Journal of Engineering & Technology, 39(1), 71-80. https://doi.org/10.22581/muet1982.2001.08
Fornell, C., & Larcker, D. F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1), 39-50. https://doi.org/10.1177/002224378101800104
Gao, J., Ren, H., & Cai, W. (2019). Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(9), 2147-2168. https://doi.org/10.1108/ECAM-01-2019-0029
Garrido, M. C., Ruot, M. C., Ribeiro, F. M., & Nake, H. A. (2011). Risk identification techniques knowledge and application in the Brazilian construction. Journal of Civil Engineering and Construction Technology, 242-242.
Geisser, S. (1974). A predictive approach to the random effect model. Biometrika, 61(1), 101-107. https://doi.org/10.2307/2334290
Gibb, K. (2011). Delivering new affordable housing in the age of austerity: housing policy in Scotland. International Journal of Housing Markets and Analysis, 4(4), 357-368. https://doi.org/10.1108/17538271111172157
Gopang, R. K. M., alias Imran, Q. B., & Nagapan, S. (2020). Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects. International Journal of Sustainable Construction Engineering and Technology, 11(2), 225-233. https://doi.org/10.30880/ijscet.2020.11.02.028
Hair Jr , J. F., Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). Partial least squares structural equation modeling (PLS-SEM) An emerging tool in business research. European Business Review, 106-121.
Hair Jr, J. F., Hult, G. T., Ringle, C. M., & Sarstedt, M. (2014). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM) Second Edition. Sage.
Hair, J. F., Babin, B. J., Anderson, R. E., & Black, W. C. (2018). Multivariate Data Analysis, 8th edition. Cengage.
Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2-24. https://doi.org/10.1108/EBR-11-2018-0203
Hameed, A., & Woo, S. (2007). Risk importance and allocation in the Pakistan construction industry. KSCE Journal of Civil Engineering, 11(2), 73-80. https://doi.org/10.1007/BF02823850
Hamilton, D. F., Ghert, M., & Simpson, A. H. (2015). Interpreting regression models in clinical outcome studies. Bone & Joint Research, 152–153.
Haughey, D. (2014). 21 Ways to Excel at Project Management. Project Smart.
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43, 115-135. https://doi.org/10.1007/s11747-014-0403-8
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009). The use of partial least squares path modeling in international marketing. In R. R. Sinkovics, & P. N. Ghauri, New Challenges to International Marketing-Advances in International Marketing (pp. 277–319). Emerald Publishing Limited.
Husein, A. T. (2014). Construction and projects in Saudi Arabia: Overview. Toronto: The construction and projects Multi-jurisdictional guide 2013/14.
International Trade Administration. (2020, 01 22). Saudi Arabia - Architecture, Engineering and Construction. Retrieved from International Trade Administration: https://www.export.gov/apex/article2?id=Saudi-Arabia-Architecture-Engineering-and-Construction
Ismail, F., Yusuwan, N. M., & Baharuddin, H. E. (2012). Management factors for successful IBS projects implementation. ASIA Pacific International Conference on Environment-Behaviour Studies. 68, pp. 99-107. Procedia - Social and Behavioral Sciences. https://doi.org/10.1016/j.sbspro.2012.12.210
Ismail, I., Memon, A. H., & Rahman, I. A. (2014). Expert opinion on risk level for factors affecting time and cost over-run along the project lifecycle in Malaysian construction projects. International Journal of Construction Technology and Management, 1(2), 10-15.
Jarkas, A. M., & Haup, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), 1-44. https://doi.org/10.1108/JEDT-03-2014-0012
Kansal, R. K., & Sharma, M. (2012). Risk assessment methods and application in the construction projects. International Journal of Modern Engineering Research (IJMER), 2(3), 1081-1085.
Kartama, N. A., & Kartamba, S. A. (2001). Risk and its management in the Kuwaiti construction industry:a contractors' perspective. International Journal of Project Management, 19(6), 325-335. https://doi.org/10.1016/S0263-7863(00)00014-4
Khahro, S. H., Memon, A. H., Memon, N. A., Memon, Z. A., & Naresh, R. (2023). Influence of social and economic fac-tors on construction project performance in Pakistan. Sustainability, 15(3), 2469. https://doi.org/10.3390/su15032469
Kowacka, M., Skorupka, D., Duchaczek, A., & Zagrodnik, P. (2019). Identification of geodetic risk factors occurring at the construction project preparation stage. Open Engineering De Gruyter, 9(1), 14-17. :https://doi.org/10.1515/eng-2019-0002
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610. https://doi.org/10.1177/001316447003000308
Larson, E. (2010). Project Management: The Managerial Process. McGraw Hill.
Lewis-Beck, C., & Lewis-Beck, M. (2016). Applied Regression: An Introduction 2nd Edition. Sage.
Ling, F. Y., & Hoi, L. (2006). Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24(3), 261-270. https://doi.org/10.1016/j.ijproman.2005.11.003
Littlejohn, S. W., & Foss, K. A. (2009). Encyclopedia of Communication Theory. Sage.
Liu, J., Jin, F., Xie, Q., & Skitm, M. (2017). Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective. International Journal of Project Management, 35(2), 204-211. https://doi.org/10.1016/j.ijproman.2016.11.004
Maina, C., & Gathenya, J. W. (2014). Influence of economic factors on performance of project management among petroleum marketing firms in Kenya. The International Journal of Academic Research in Business and Social Sciences, 146-173.
Maina, K. E., Geoffrey, M. G., Wanjau, K. L., & Mung’atu, J. K. (2017). Moderating effect of government regulations on the relationship between cost recovery and financing of water investments in Nairobi peri-urban markets in Kenya. International Academic Journal of Economics and Finance, 1(4), 14-31.
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. A. (2014). Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment, 1(1), 30-35.
Memon, A. H., Soomro, M. A., Memon, N. M., & Abassi, M. N. (2017). Factors causing health and safety hazards in construction projects in Pakistan. Mehran University Research Journal of Engineering & Technology, 36(3), 559-568. https://www.doi.org/10.22581/muet1982.1703.12
Memon, A. H., Memon, A. Q., Khahro, S. H., & Javed, Y. (2023). Investigation of Project Delays: Towards a Sustaina-ble Construction Industry. Sustainability, 15(2), 1457. https://doi.org/10.3390/su15021457
Memon, M. A., Cheah, J. H., Ramayah, T., Ting, H., Chuah, F., & Cham, T. H. (2019). Moderation analysis: issues and guidelines. Journal of Applied Structural Equation Modeling, 3(1), 1-11. https://www.doi.org/10.47263/JASEM.3(1)01
Mirkovic, M. (2018). The impact of failure types in construction production systems on economic risk assessments in the bidding phase. Complexity, 2018(3), 1-13. https://www.doi.org/10.1155/2018/5041803
Mora, M., Gelman, O., Steenkamp, A. L., & Raisinghani, M. (2012). Research Methodologies, Innovations and Philosophies in Software Systems Engineering and Information Systems. Hershey: IGI Global.
Moshood, T. D., Adeleke, A. Q., Nawanir, G., & Mahmud, F. (2020). Ranking of human factors affecting contractors’risk attitudes in the Malaysian construction industry. Social Sciences & Humanities, 1-12.
Nagapan, S., Rahman, I. A., & Asmi, A. (2012). Factors contributing to physical and non-physical waste generation in construction industry. International Journal of Advances in Applied Sciences, 1(1), 1-10. https://www.doi.org/10.11591/ijaas.v1i1.476
Niu, Y. (2008). The performance and problems of affordable housing policy in China: The estimations of benefits, costs and affordability. International Journal of Housing Markets and Analysis, 1(2), 125-146. https://doi.org/10.1108/17538270810877763
PMI. (2008). A Guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute.
PMI. (2017). PMBOK 6th Edition - A Guide to the Project Management Body of Knowledge. Newtown Square: Project Management Institute.
Rahman, I. A., Al Ameri, A. E. S., Memon, A. H., Al-Emad, N., & Alhammadi, A. S. M. (2022). Structural Relationship of Causes and Effects of Construction Changes: Case of UAE Construction. Sustainability, 14(2), 596. https://doi.org/10.3390/su14020596
Rehman, M. A., Iqbal, T., & Shakil, M. (2017). Identification of risk factors associated with Pakistan’s construction in-dustry-project manager perspective. International Journal of Business and Social Science, 8(3), 150-157.
Rehman, M. A., & Ishak, M. S. B. (2021). Moderating role of government Acts, laws and policies between team compe-tency and skills and construction risk management among KSA contractors. International Journal of Construction Supply Chain Management, 11(2), 144-165. https://www.doi.org/10.14424/ijcscm110221-144-165
Rehman, M. A., & Ishak, M. S. B. (2022). Moderation role of government policies, laws and Acts between cultural fac-tors and risk management among Saudi Arabian contractors. FWU Journal of Social Sciences, 16(1). http://doi.org/10.51709/19951272/Spring2022/5
Rigdon, E. E. (2012). Rethinking partial least squares path modeling: In praise of simple methods. Long Range Planning, 341-358.
Ripley, M. (2020). The Orange Book: Management of Risk – Principles and Concepts. HM Treasury and Government Finance Function.
Rönkkö, M., & Cho, E. (2022). An updated guideline for assessing discriminant validity. Organizational Research Methods, 25(1), 6–14. https://doi.org/10.1177/1094428120968614
Rostami, A. (2016). Tools and techniques in risk identification: A research within SMEs in the UK Construction Industry. Universal Journal of Management, 4(4), 203-210. https://doi.org/10.13189/ujm.2016.040406
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Sarstedt, M., Ringle, C. M., Smith, D., Reams, R., & Hair Jr., J. F. (2014). Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers. Journal of Family Business Strategy, 5(1), 105-115. https://doi.org/10.1016/j.jfbs.2014.01.002
Satistics, G. A. (2021). General Authority for statistics Kingdom of Saudi Arabia. Retrieved from https://www.stats.gov.sa/: https://www.stats.gov.sa/
Selya, A. S., Rose, J. S., Dierker, L. C., Hedeker, D., & Merme, R. J. (2012). A practical guide to calculating Cohen’s f2, a measure of local effect size, from PROC MIXED. Frontiers in Psychology, 3, 1-6. https://doi.org/10.3389/fpsyg.2012.00111
Sharaf, M. M., & Abdelwahab, H. T. (2015). Analysis of risk factors for highway construction projects in Egypt. Journal of Civil Engineering and Architecture, 9(5), 526-533. https://www.doi.org/10.17265/1934-7359/2015.05.004
Stephen, M., & Raftery, J. (1992). Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), 303-320. https://doi.org/10.1080/01446199200000028
Stone, M. (1974). Cross-validatory choice and assessment of statistical predictions. Journal of the Royal Statistical Society: Series B (Methodological), 36(2), 111-147.
Szymański, P. (2017). 2nd International Joint Conference on Innovative Solutions in Construction Engineering and Management. ORSDCE 2017 (pp. 174-182). Procedia Engineering.
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2007). Risk management in the Chinese construction company. Journal of Construction Engineering and Management, 133(12), 944-956. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(944)
Taofeeq, M. D., Adeleke, A. Q., & Lee, C. K. (2020). Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), 1543-1569. https://doi.org/10.1108/JEDT-08-2019-0192
Thuye, N. V., Ogunlana, S. O., & Dey, P. K. (2007). Risk management in oil and gas construction projects in Vietnam. International Journal of Energy Sector Management, 1(2), 175-194. https://doi.org/10.1108/17506220710761582
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction project in developing countries. Construction Management and Economics, 22(3), 237-252. https://doi.org/10.1080/0144619032000124689
Yamane, T. (1967). Statistics An Introductory Analysis. 2nd Edition. Harper & Row.
Zou, P. X., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(4), 601–614. https://doi.org/10.1016/j.ijproman.2007.03.001
Aarons, H. (2021). A Practical introduction to survey design: A beginner's guide 1st edition. Sage.
Abd Karim, N. A., Rahman, I. A., Memon, A. H., Jamil, N., & Azis, A. A. A. (2012). Significant risk factors in construction projects: Contractor's perception. IEEE Colloquium on Humanities, Science and Engineering (CHUSER 2012), pp. 347-350. IEEE
Abusafiya, H. A., & Suliman, S. M. (2017). Causes and effects of cost overrun on construction project in Bahrain: Part I (Ranking of cost overrun factors and risk mapping). Modern Applied Science, 11(7), 20-27. https://doi.org/10.5539/mas.v11n7p20
Adeleke, A. Q., Bahaudin, A. Y., & Kamaruddeen, A. M. (2016). Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: A proposed framework. ICAST’16. 1761, pp. 020008-1-020008-6. AIP Publishing Ltd. https://doi.org/10.1063/1.4960848
Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W., & Sorooshian, S. (2018). The influence of organizational external factors on construction risk management among Nigerian construction companies. Safety and Health at Work, 9(1), 115-124. https://doi.org/10.1016/j.shaw.2017.05.004
Adeleke, A. Q., Nasidi, Y., & Bamgbade, J. A. (2016). Assessing the extent of effective construction risk management in Nigerian construction companies. Journal of Advanced Research in Business and Management Studies, 1-10.
Akanni, P. O., Oke, A. E., & Akpomiemie , O. A. (2015). Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal, 11(1), 91-97. https://www.doi.org/10.1016/j.hbrcj.2014.02.010
Algahtany, M., Alhammadi, Y., & Kashiwag, D. (2016). Introducing a new risk management model to the Saudi Arabian construction industry. International Conference on Sustainable Design, Engineering and Construction. 145, pp. 940-947. Procedia Engineering. https://doi.org/10.1016/j.proeng.2016.04.122
Andi, A. (2006). The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), 69–80. https://doi.org/10.1080/01446190500310338
Antón, A. J., Rodríguez, G. S., & López, Á. R. (2011). Financial risks in construction projects. African Journal of Business Management, 5(31), 12325-12328. https://www.doi.org/10.5897/AJBM11.1463
Apuke, O. D. (2017). Quantitative research methods a synopsis approach. Arabian Journal of Business and Management Review (Kuwait Chapter), 6(11), 40-47. https://www.doi.org/10.12816/0040336
Bachayo, A., Memon, A. H., Hussain, M., Rahman, I. A., & Ahmed, S. J. (2022). Risk level of design and procurement factors causing construction waste generation. Journal of Applied Engineering Sciences, 12(1). 11-16 https://doi.org/10.2478/jaes-2022-0002
Bajwa, I. A., & Syed, A. M. (2020). Identification of major construction sector risks in Saudi Arabia. World Transactions on Engineering and Technology Education, 18(2), 247-256.
Bakr, A. F., Hagla, K. E., & Rawash, A. N. (2012). Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management). Alexandria Engineering Journal, 51(4), 305-323. https://doi.org/10.1016/j.aej.2012.09.001
Becker, J.-M., Ringle, C. M., & Sarstedt, M. (2018). Estimating moderating effects in PLS-SEM and PLSc-SEM: Interaction Term Generation*Data Treatment. Journal of Applied Structural Equation Modeling, 2(2), 1-21. https://www.doi.org/10.47263/JASEM.2(2)01
Cheah, J.-H., Sarstedt, M., Ringle, C. M., Ramayah, T., & Ting, H. (2018). Convergent validity assessment of formatively measured constructs in PLS-SEM: On using single-item versus multi-item measures in redundancy analyses. International Journal of Contemporary Hospitality Management, 30(11), 3192-3210. https://doi.org/10.1108/IJCHM-10-2017-0649
Chin, W. W. (1998). The partial least squares approach to structural equation modeling. In G. A. Marcoulides, Modern Methods for Business Research (pp. 295-336). Lawrence Erlbaum Associates.
Chin, W. W. (2010). How to write up and report PLS analyses. In V. E. Vinzi, W. W. Chin, J. Henseler, & H. Wang, Handbook of Partial Least Squares: Concepts, Methods and Applications (Springer Handbooks of Computational Statistics) (pp. 655-690). Springer.
Cochran, W. G. (1963). Sampling Techniques 2nd ed., Wiley.
Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences Second Edition. Lawrence Erlbaum Associates Inc.
Crane, L., Gantz, G., Isaacs, S., Jose, D., & Sharp, R. (2013). Introduction to risk management 2nd edition. Extension Risk Management Education and Risk Management Agency.
Creswell, J. W., Fetters, M. D., & Ivankova, N. V. (2004). Designing a mixed methods study in primary care. The Annals of Family Medicine, 2(1), 7-12. https://www.doi.org/10.1370/afm.104
Devi, A. C., & Ananthanarayanan, K. (2017). Factors influencing cost over-run in Indian construction projects. International Conference on Advances in Sustainable Construction Materials and Civil Engineering Systems. 120, pp. 1-8. Sharjah: EDP Sciences. https://doi.org/10.1051/matecconf/201712002023
Dikmen, I., Birgonul, M. T., Anac, C., & Tah, J. G. (2008). Learning from risks: A tool for post-project risk assessment. Automation in Construction, 28(1), 42–50. https://doi.org/10.1016/j.autcon.2008.04.008
Dinu, A.-M. (2012). Modern methods of risk identification in risk management. International Journal of Academic Research in Economics and Management Sciences, 1(6), 67-71.
Dawson, J. F. (2014). Moderation in management research: What, why, when, and how. Journal of business and psy-chology, 29(1), 1-19. https://doi.org/10.1007/s10869-013-9308-7
El-Sayeg , S. M., & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6), 247-269. https://www.doi.org/10.1061/(ASCE)ME.1943-5479.0000365
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction company. International Journal of Project Management, 26(4), 431-438. https://doi.org/10.1016/j.ijproman.2007.07.004
Farid, W., Kureshi, N. I., Babar, S., & Mahmood, S. (2020). Critical risk factors of construction industry of Pakistan for improving project outcome. Mehran University Research Journal of Engineering & Technology, 39(1), 71-80. https://doi.org/10.22581/muet1982.2001.08
Fornell, C., & Larcker, D. F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1), 39-50. https://doi.org/10.1177/002224378101800104
Gao, J., Ren, H., & Cai, W. (2019). Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(9), 2147-2168. https://doi.org/10.1108/ECAM-01-2019-0029
Garrido, M. C., Ruot, M. C., Ribeiro, F. M., & Nake, H. A. (2011). Risk identification techniques knowledge and application in the Brazilian construction. Journal of Civil Engineering and Construction Technology, 242-242.
Geisser, S. (1974). A predictive approach to the random effect model. Biometrika, 61(1), 101-107. https://doi.org/10.2307/2334290
Gibb, K. (2011). Delivering new affordable housing in the age of austerity: housing policy in Scotland. International Journal of Housing Markets and Analysis, 4(4), 357-368. https://doi.org/10.1108/17538271111172157
Gopang, R. K. M., alias Imran, Q. B., & Nagapan, S. (2020). Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects. International Journal of Sustainable Construction Engineering and Technology, 11(2), 225-233. https://doi.org/10.30880/ijscet.2020.11.02.028
Hair Jr , J. F., Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). Partial least squares structural equation modeling (PLS-SEM) An emerging tool in business research. European Business Review, 106-121.
Hair Jr, J. F., Hult, G. T., Ringle, C. M., & Sarstedt, M. (2014). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM) Second Edition. Sage.
Hair, J. F., Babin, B. J., Anderson, R. E., & Black, W. C. (2018). Multivariate Data Analysis, 8th edition. Cengage.
Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2-24. https://doi.org/10.1108/EBR-11-2018-0203
Hameed, A., & Woo, S. (2007). Risk importance and allocation in the Pakistan construction industry. KSCE Journal of Civil Engineering, 11(2), 73-80. https://doi.org/10.1007/BF02823850
Hamilton, D. F., Ghert, M., & Simpson, A. H. (2015). Interpreting regression models in clinical outcome studies. Bone & Joint Research, 152–153.
Haughey, D. (2014). 21 Ways to Excel at Project Management. Project Smart.
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43, 115-135. https://doi.org/10.1007/s11747-014-0403-8
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009). The use of partial least squares path modeling in international marketing. In R. R. Sinkovics, & P. N. Ghauri, New Challenges to International Marketing-Advances in International Marketing (pp. 277–319). Emerald Publishing Limited.
Husein, A. T. (2014). Construction and projects in Saudi Arabia: Overview. Toronto: The construction and projects Multi-jurisdictional guide 2013/14.
International Trade Administration. (2020, 01 22). Saudi Arabia - Architecture, Engineering and Construction. Retrieved from International Trade Administration: https://www.export.gov/apex/article2?id=Saudi-Arabia-Architecture-Engineering-and-Construction
Ismail, F., Yusuwan, N. M., & Baharuddin, H. E. (2012). Management factors for successful IBS projects implementation. ASIA Pacific International Conference on Environment-Behaviour Studies. 68, pp. 99-107. Procedia - Social and Behavioral Sciences. https://doi.org/10.1016/j.sbspro.2012.12.210
Ismail, I., Memon, A. H., & Rahman, I. A. (2014). Expert opinion on risk level for factors affecting time and cost over-run along the project lifecycle in Malaysian construction projects. International Journal of Construction Technology and Management, 1(2), 10-15.
Jarkas, A. M., & Haup, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), 1-44. https://doi.org/10.1108/JEDT-03-2014-0012
Kansal, R. K., & Sharma, M. (2012). Risk assessment methods and application in the construction projects. International Journal of Modern Engineering Research (IJMER), 2(3), 1081-1085.
Kartama, N. A., & Kartamba, S. A. (2001). Risk and its management in the Kuwaiti construction industry:a contractors' perspective. International Journal of Project Management, 19(6), 325-335. https://doi.org/10.1016/S0263-7863(00)00014-4
Khahro, S. H., Memon, A. H., Memon, N. A., Memon, Z. A., & Naresh, R. (2023). Influence of social and economic fac-tors on construction project performance in Pakistan. Sustainability, 15(3), 2469. https://doi.org/10.3390/su15032469
Kowacka, M., Skorupka, D., Duchaczek, A., & Zagrodnik, P. (2019). Identification of geodetic risk factors occurring at the construction project preparation stage. Open Engineering De Gruyter, 9(1), 14-17. :https://doi.org/10.1515/eng-2019-0002
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610. https://doi.org/10.1177/001316447003000308
Larson, E. (2010). Project Management: The Managerial Process. McGraw Hill.
Lewis-Beck, C., & Lewis-Beck, M. (2016). Applied Regression: An Introduction 2nd Edition. Sage.
Ling, F. Y., & Hoi, L. (2006). Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24(3), 261-270. https://doi.org/10.1016/j.ijproman.2005.11.003
Littlejohn, S. W., & Foss, K. A. (2009). Encyclopedia of Communication Theory. Sage.
Liu, J., Jin, F., Xie, Q., & Skitm, M. (2017). Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective. International Journal of Project Management, 35(2), 204-211. https://doi.org/10.1016/j.ijproman.2016.11.004
Maina, C., & Gathenya, J. W. (2014). Influence of economic factors on performance of project management among petroleum marketing firms in Kenya. The International Journal of Academic Research in Business and Social Sciences, 146-173.
Maina, K. E., Geoffrey, M. G., Wanjau, K. L., & Mung’atu, J. K. (2017). Moderating effect of government regulations on the relationship between cost recovery and financing of water investments in Nairobi peri-urban markets in Kenya. International Academic Journal of Economics and Finance, 1(4), 14-31.
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. A. (2014). Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment, 1(1), 30-35.
Memon, A. H., Soomro, M. A., Memon, N. M., & Abassi, M. N. (2017). Factors causing health and safety hazards in construction projects in Pakistan. Mehran University Research Journal of Engineering & Technology, 36(3), 559-568. https://www.doi.org/10.22581/muet1982.1703.12
Memon, A. H., Memon, A. Q., Khahro, S. H., & Javed, Y. (2023). Investigation of Project Delays: Towards a Sustaina-ble Construction Industry. Sustainability, 15(2), 1457. https://doi.org/10.3390/su15021457
Memon, M. A., Cheah, J. H., Ramayah, T., Ting, H., Chuah, F., & Cham, T. H. (2019). Moderation analysis: issues and guidelines. Journal of Applied Structural Equation Modeling, 3(1), 1-11. https://www.doi.org/10.47263/JASEM.3(1)01
Mirkovic, M. (2018). The impact of failure types in construction production systems on economic risk assessments in the bidding phase. Complexity, 2018(3), 1-13. https://www.doi.org/10.1155/2018/5041803
Mora, M., Gelman, O., Steenkamp, A. L., & Raisinghani, M. (2012). Research Methodologies, Innovations and Philosophies in Software Systems Engineering and Information Systems. Hershey: IGI Global.
Moshood, T. D., Adeleke, A. Q., Nawanir, G., & Mahmud, F. (2020). Ranking of human factors affecting contractors’risk attitudes in the Malaysian construction industry. Social Sciences & Humanities, 1-12.
Nagapan, S., Rahman, I. A., & Asmi, A. (2012). Factors contributing to physical and non-physical waste generation in construction industry. International Journal of Advances in Applied Sciences, 1(1), 1-10. https://www.doi.org/10.11591/ijaas.v1i1.476
Niu, Y. (2008). The performance and problems of affordable housing policy in China: The estimations of benefits, costs and affordability. International Journal of Housing Markets and Analysis, 1(2), 125-146. https://doi.org/10.1108/17538270810877763
PMI. (2008). A Guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute.
PMI. (2017). PMBOK 6th Edition - A Guide to the Project Management Body of Knowledge. Newtown Square: Project Management Institute.
Rahman, I. A., Al Ameri, A. E. S., Memon, A. H., Al-Emad, N., & Alhammadi, A. S. M. (2022). Structural Relationship of Causes and Effects of Construction Changes: Case of UAE Construction. Sustainability, 14(2), 596. https://doi.org/10.3390/su14020596
Rehman, M. A., Iqbal, T., & Shakil, M. (2017). Identification of risk factors associated with Pakistan’s construction in-dustry-project manager perspective. International Journal of Business and Social Science, 8(3), 150-157.
Rehman, M. A., & Ishak, M. S. B. (2021). Moderating role of government Acts, laws and policies between team compe-tency and skills and construction risk management among KSA contractors. International Journal of Construction Supply Chain Management, 11(2), 144-165. https://www.doi.org/10.14424/ijcscm110221-144-165
Rehman, M. A., & Ishak, M. S. B. (2022). Moderation role of government policies, laws and Acts between cultural fac-tors and risk management among Saudi Arabian contractors. FWU Journal of Social Sciences, 16(1). http://doi.org/10.51709/19951272/Spring2022/5
Rigdon, E. E. (2012). Rethinking partial least squares path modeling: In praise of simple methods. Long Range Planning, 341-358.
Ripley, M. (2020). The Orange Book: Management of Risk – Principles and Concepts. HM Treasury and Government Finance Function.
Rönkkö, M., & Cho, E. (2022). An updated guideline for assessing discriminant validity. Organizational Research Methods, 25(1), 6–14. https://doi.org/10.1177/1094428120968614
Rostami, A. (2016). Tools and techniques in risk identification: A research within SMEs in the UK Construction Industry. Universal Journal of Management, 4(4), 203-210. https://doi.org/10.13189/ujm.2016.040406
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Sarstedt, M., Ringle, C. M., Smith, D., Reams, R., & Hair Jr., J. F. (2014). Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers. Journal of Family Business Strategy, 5(1), 105-115. https://doi.org/10.1016/j.jfbs.2014.01.002
Satistics, G. A. (2021). General Authority for statistics Kingdom of Saudi Arabia. Retrieved from https://www.stats.gov.sa/: https://www.stats.gov.sa/
Selya, A. S., Rose, J. S., Dierker, L. C., Hedeker, D., & Merme, R. J. (2012). A practical guide to calculating Cohen’s f2, a measure of local effect size, from PROC MIXED. Frontiers in Psychology, 3, 1-6. https://doi.org/10.3389/fpsyg.2012.00111
Sharaf, M. M., & Abdelwahab, H. T. (2015). Analysis of risk factors for highway construction projects in Egypt. Journal of Civil Engineering and Architecture, 9(5), 526-533. https://www.doi.org/10.17265/1934-7359/2015.05.004
Stephen, M., & Raftery, J. (1992). Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), 303-320. https://doi.org/10.1080/01446199200000028
Stone, M. (1974). Cross-validatory choice and assessment of statistical predictions. Journal of the Royal Statistical Society: Series B (Methodological), 36(2), 111-147.
Szymański, P. (2017). 2nd International Joint Conference on Innovative Solutions in Construction Engineering and Management. ORSDCE 2017 (pp. 174-182). Procedia Engineering.
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2007). Risk management in the Chinese construction company. Journal of Construction Engineering and Management, 133(12), 944-956. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(944)
Taofeeq, M. D., Adeleke, A. Q., & Lee, C. K. (2020). Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), 1543-1569. https://doi.org/10.1108/JEDT-08-2019-0192
Thuye, N. V., Ogunlana, S. O., & Dey, P. K. (2007). Risk management in oil and gas construction projects in Vietnam. International Journal of Energy Sector Management, 1(2), 175-194. https://doi.org/10.1108/17506220710761582
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction project in developing countries. Construction Management and Economics, 22(3), 237-252. https://doi.org/10.1080/0144619032000124689
Yamane, T. (1967). Statistics An Introductory Analysis. 2nd Edition. Harper & Row.
Zou, P. X., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(4), 601–614. https://doi.org/10.1016/j.ijproman.2007.03.001