Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Moderation role of government acts, laws and policies between economic factors and risk management: A case study of Saudi Arabia contractors

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)

Keywords

Jordan(161)
Supply chain management(160)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
Job satisfaction(79)
Social media(78)
Factor analysis(78)
TOPSIS(78)
Knowledge Management(77)
Genetic Algorithm(76)
Sustainability(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Ahmad Makui(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2162)
Indonesia(1276)
Jordan(783)
India(779)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(89)
Pakistan(84)
Peru(83)
United Kingdom(77)
Nigeria(77)
Morocco(73)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 8 Issue 4 pp. 213-226 , 2023

Moderation role of government acts, laws and policies between economic factors and risk management: A case study of Saudi Arabia contractors Pages 213-226 Right click to download the paper Download PDF

Authors: Muhammad Abdul Rehman, Md Sayuti Bin Ishak

DOI: 10.5267/j.jpm.2023.8.001

Keywords: SmartPLS, Government Regulatory Procedures, Risk Management, Economic Factors

Abstract: In construction projects, contractors have prioritized risks due to abandonment of operations and events, interruptions, time, and cost overruns. Construction hazards are linked to the ambiguity and unpredictability of the timely delivery of a project, with standard quality and within an allowable budget. The bid process is heavily reliant on economic considerations which include the exchange market, rate of interest and cost inflation for equipment and workforce. Project failure takes place if economic considerations have not complied for effective management of risks in construction. The research framework is founded on Organization Control Theory and focused on the PLS-SEM approach which addresses the effect of economic factors with moderating government regulatory procedures on the management of risks in construction within 303 large (higher than 250 workers) Saudi Arabian contractors. In the PLS-SEM approach, complicated models are effectively analyzed with higher statistical power. The findings show that economic factors and government regulatory procedures have a favorable impact on the management of risks in the Saudi Arabian development industry. Additionally, moderating government regulatory procedures has a favorable correlation to the management of risks in the Saudi Arabian construction sector. By addressing economic considerations, this study enables practitioners, experts and stakeholders involved in construction industries to conduct effective management of risks in the construction sector.

How to cite this paper
Rehman, M & Ishak, M. (2023). Moderation role of government acts, laws and policies between economic factors and risk management: A case study of Saudi Arabia contractors.Journal of Project Management, 8(4), 213-226.

Refrences
(SCA), S. C. (2021). Saudi Contractor Association. Muqawil: https://muqawil.org/
Aarons, H. (2021). A Practical introduction to survey design: A beginner's guide 1st edition. Sage.
Abd Karim, N. A., Rahman, I. A., Memon, A. H., Jamil, N., & Azis, A. A. A. (2012). Significant risk factors in construction projects: Contractor's perception. IEEE Colloquium on Humanities, Science and Engineering (CHUSER 2012), pp. 347-350. IEEE
Abusafiya, H. A., & Suliman, S. M. (2017). Causes and effects of cost overrun on construction project in Bahrain: Part I (Ranking of cost overrun factors and risk mapping). Modern Applied Science, 11(7), 20-27. https://doi.org/10.5539/mas.v11n7p20
Adeleke, A. Q., Bahaudin, A. Y., & Kamaruddeen, A. M. (2016). Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: A proposed framework. ICAST’16. 1761, pp. 020008-1-020008-6. AIP Publishing Ltd. https://doi.org/10.1063/1.4960848
Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W., & Sorooshian, S. (2018). The influence of organizational external factors on construction risk management among Nigerian construction companies. Safety and Health at Work, 9(1), 115-124. https://doi.org/10.1016/j.shaw.2017.05.004
Adeleke, A. Q., Nasidi, Y., & Bamgbade, J. A. (2016). Assessing the extent of effective construction risk management in Nigerian construction companies. Journal of Advanced Research in Business and Management Studies, 1-10.
Akanni, P. O., Oke, A. E., & Akpomiemie , O. A. (2015). Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal, 11(1), 91-97. https://www.doi.org/10.1016/j.hbrcj.2014.02.010
Algahtany, M., Alhammadi, Y., & Kashiwag, D. (2016). Introducing a new risk management model to the Saudi Arabian construction industry. International Conference on Sustainable Design, Engineering and Construction. 145, pp. 940-947. Procedia Engineering. https://doi.org/10.1016/j.proeng.2016.04.122
Andi, A. (2006). The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), 69–80. https://doi.org/10.1080/01446190500310338
Antón, A. J., Rodríguez, G. S., & López, Á. R. (2011). Financial risks in construction projects. African Journal of Business Management, 5(31), 12325-12328. https://www.doi.org/10.5897/AJBM11.1463
Apuke, O. D. (2017). Quantitative research methods a synopsis approach. Arabian Journal of Business and Management Review (Kuwait Chapter), 6(11), 40-47. https://www.doi.org/10.12816/0040336
Bachayo, A., Memon, A. H., Hussain, M., Rahman, I. A., & Ahmed, S. J. (2022). Risk level of design and procurement factors causing construction waste generation. Journal of Applied Engineering Sciences, 12(1). 11-16 https://doi.org/10.2478/jaes-2022-0002
Bajwa, I. A., & Syed, A. M. (2020). Identification of major construction sector risks in Saudi Arabia. World Transactions on Engineering and Technology Education, 18(2), 247-256.
Bakr, A. F., Hagla, K. E., & Rawash, A. N. (2012). Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management). Alexandria Engineering Journal, 51(4), 305-323. https://doi.org/10.1016/j.aej.2012.09.001
Becker, J.-M., Ringle, C. M., & Sarstedt, M. (2018). Estimating moderating effects in PLS-SEM and PLSc-SEM: Interaction Term Generation*Data Treatment. Journal of Applied Structural Equation Modeling, 2(2), 1-21. https://www.doi.org/10.47263/JASEM.2(2)01
Cheah, J.-H., Sarstedt, M., Ringle, C. M., Ramayah, T., & Ting, H. (2018). Convergent validity assessment of formatively measured constructs in PLS-SEM: On using single-item versus multi-item measures in redundancy analyses. International Journal of Contemporary Hospitality Management, 30(11), 3192-3210. https://doi.org/10.1108/IJCHM-10-2017-0649
Chin, W. W. (1998). The partial least squares approach to structural equation modeling. In G. A. Marcoulides, Modern Methods for Business Research (pp. 295-336). Lawrence Erlbaum Associates.
Chin, W. W. (2010). How to write up and report PLS analyses. In V. E. Vinzi, W. W. Chin, J. Henseler, & H. Wang, Handbook of Partial Least Squares: Concepts, Methods and Applications (Springer Handbooks of Computational Statistics) (pp. 655-690). Springer.
Cochran, W. G. (1963). Sampling Techniques 2nd ed., Wiley.
Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences Second Edition. Lawrence Erlbaum Associates Inc.
Crane, L., Gantz, G., Isaacs, S., Jose, D., & Sharp, R. (2013). Introduction to risk management 2nd edition. Extension Risk Management Education and Risk Management Agency.
Creswell, J. W., Fetters, M. D., & Ivankova, N. V. (2004). Designing a mixed methods study in primary care. The Annals of Family Medicine, 2(1), 7-12. https://www.doi.org/10.1370/afm.104
Devi, A. C., & Ananthanarayanan, K. (2017). Factors influencing cost over-run in Indian construction projects. International Conference on Advances in Sustainable Construction Materials and Civil Engineering Systems. 120, pp. 1-8. Sharjah: EDP Sciences. https://doi.org/10.1051/matecconf/201712002023
Dikmen, I., Birgonul, M. T., Anac, C., & Tah, J. G. (2008). Learning from risks: A tool for post-project risk assessment. Automation in Construction, 28(1), 42–50. https://doi.org/10.1016/j.autcon.2008.04.008
Dinu, A.-M. (2012). Modern methods of risk identification in risk management. International Journal of Academic Research in Economics and Management Sciences, 1(6), 67-71.
Dawson, J. F. (2014). Moderation in management research: What, why, when, and how. Journal of business and psy-chology, 29(1), 1-19. https://doi.org/10.1007/s10869-013-9308-7
El-Sayeg , S. M., & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6), 247-269. https://www.doi.org/10.1061/(ASCE)ME.1943-5479.0000365
El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction company. International Journal of Project Management, 26(4), 431-438. https://doi.org/10.1016/j.ijproman.2007.07.004
Farid, W., Kureshi, N. I., Babar, S., & Mahmood, S. (2020). Critical risk factors of construction industry of Pakistan for improving project outcome. Mehran University Research Journal of Engineering & Technology, 39(1), 71-80. https://doi.org/10.22581/muet1982.2001.08
Fornell, C., & Larcker, D. F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1), 39-50. https://doi.org/10.1177/002224378101800104
Gao, J., Ren, H., & Cai, W. (2019). Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(9), 2147-2168. https://doi.org/10.1108/ECAM-01-2019-0029
Garrido, M. C., Ruot, M. C., Ribeiro, F. M., & Nake, H. A. (2011). Risk identification techniques knowledge and application in the Brazilian construction. Journal of Civil Engineering and Construction Technology, 242-242.
Geisser, S. (1974). A predictive approach to the random effect model. Biometrika, 61(1), 101-107. https://doi.org/10.2307/2334290
Gibb, K. (2011). Delivering new affordable housing in the age of austerity: housing policy in Scotland. International Journal of Housing Markets and Analysis, 4(4), 357-368. https://doi.org/10.1108/17538271111172157
Gopang, R. K. M., alias Imran, Q. B., & Nagapan, S. (2020). Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects. International Journal of Sustainable Construction Engineering and Technology, 11(2), 225-233. https://doi.org/10.30880/ijscet.2020.11.02.028
Hair Jr , J. F., Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). Partial least squares structural equation modeling (PLS-SEM) An emerging tool in business research. European Business Review, 106-121.
Hair Jr, J. F., Hult, G. T., Ringle, C. M., & Sarstedt, M. (2014). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM) Second Edition. Sage.
Hair, J. F., Babin, B. J., Anderson, R. E., & Black, W. C. (2018). Multivariate Data Analysis, 8th edition. Cengage.
Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2-24. https://doi.org/10.1108/EBR-11-2018-0203
Hameed, A., & Woo, S. (2007). Risk importance and allocation in the Pakistan construction industry. KSCE Journal of Civil Engineering, 11(2), 73-80. https://doi.org/10.1007/BF02823850
Hamilton, D. F., Ghert, M., & Simpson, A. H. (2015). Interpreting regression models in clinical outcome studies. Bone & Joint Research, 152–153.
Haughey, D. (2014). 21 Ways to Excel at Project Management. Project Smart.
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43, 115-135. https://doi.org/10.1007/s11747-014-0403-8
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009). The use of partial least squares path modeling in international marketing. In R. R. Sinkovics, & P. N. Ghauri, New Challenges to International Marketing-Advances in International Marketing (pp. 277–319). Emerald Publishing Limited.
Husein, A. T. (2014). Construction and projects in Saudi Arabia: Overview. Toronto: The construction and projects Multi-jurisdictional guide 2013/14.
International Trade Administration. (2020, 01 22). Saudi Arabia - Architecture, Engineering and Construction. Retrieved from International Trade Administration: https://www.export.gov/apex/article2?id=Saudi-Arabia-Architecture-Engineering-and-Construction
Ismail, F., Yusuwan, N. M., & Baharuddin, H. E. (2012). Management factors for successful IBS projects implementation. ASIA Pacific International Conference on Environment-Behaviour Studies. 68, pp. 99-107. Procedia - Social and Behavioral Sciences. https://doi.org/10.1016/j.sbspro.2012.12.210
Ismail, I., Memon, A. H., & Rahman, I. A. (2014). Expert opinion on risk level for factors affecting time and cost over-run along the project lifecycle in Malaysian construction projects. International Journal of Construction Technology and Management, 1(2), 10-15.
Jarkas, A. M., & Haup, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), 1-44. https://doi.org/10.1108/JEDT-03-2014-0012
Kansal, R. K., & Sharma, M. (2012). Risk assessment methods and application in the construction projects. International Journal of Modern Engineering Research (IJMER), 2(3), 1081-1085.
Kartama, N. A., & Kartamba, S. A. (2001). Risk and its management in the Kuwaiti construction industry:a contractors' perspective. International Journal of Project Management, 19(6), 325-335. https://doi.org/10.1016/S0263-7863(00)00014-4
Khahro, S. H., Memon, A. H., Memon, N. A., Memon, Z. A., & Naresh, R. (2023). Influence of social and economic fac-tors on construction project performance in Pakistan. Sustainability, 15(3), 2469. https://doi.org/10.3390/su15032469
Kowacka, M., Skorupka, D., Duchaczek, A., & Zagrodnik, P. (2019). Identification of geodetic risk factors occurring at the construction project preparation stage. Open Engineering De Gruyter, 9(1), 14-17. :https://doi.org/10.1515/eng-2019-0002
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610. https://doi.org/10.1177/001316447003000308
Larson, E. (2010). Project Management: The Managerial Process. McGraw Hill.
Lewis-Beck, C., & Lewis-Beck, M. (2016). Applied Regression: An Introduction 2nd Edition. Sage.
Ling, F. Y., & Hoi, L. (2006). Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24(3), 261-270. https://doi.org/10.1016/j.ijproman.2005.11.003
Littlejohn, S. W., & Foss, K. A. (2009). Encyclopedia of Communication Theory. Sage.
Liu, J., Jin, F., Xie, Q., & Skitm, M. (2017). Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective. International Journal of Project Management, 35(2), 204-211. https://doi.org/10.1016/j.ijproman.2016.11.004
Maina, C., & Gathenya, J. W. (2014). Influence of economic factors on performance of project management among petroleum marketing firms in Kenya. The International Journal of Academic Research in Business and Social Sciences, 146-173.
Maina, K. E., Geoffrey, M. G., Wanjau, K. L., & Mung’atu, J. K. (2017). Moderating effect of government regulations on the relationship between cost recovery and financing of water investments in Nairobi peri-urban markets in Kenya. International Academic Journal of Economics and Finance, 1(4), 14-31.
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. A. (2014). Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment, 1(1), 30-35.
Memon, A. H., Soomro, M. A., Memon, N. M., & Abassi, M. N. (2017). Factors causing health and safety hazards in construction projects in Pakistan. Mehran University Research Journal of Engineering & Technology, 36(3), 559-568. https://www.doi.org/10.22581/muet1982.1703.12
Memon, A. H., Memon, A. Q., Khahro, S. H., & Javed, Y. (2023). Investigation of Project Delays: Towards a Sustaina-ble Construction Industry. Sustainability, 15(2), 1457. https://doi.org/10.3390/su15021457
Memon, M. A., Cheah, J. H., Ramayah, T., Ting, H., Chuah, F., & Cham, T. H. (2019). Moderation analysis: issues and guidelines. Journal of Applied Structural Equation Modeling, 3(1), 1-11. https://www.doi.org/10.47263/JASEM.3(1)01
Mirkovic, M. (2018). The impact of failure types in construction production systems on economic risk assessments in the bidding phase. Complexity, 2018(3), 1-13. https://www.doi.org/10.1155/2018/5041803
Mora, M., Gelman, O., Steenkamp, A. L., & Raisinghani, M. (2012). Research Methodologies, Innovations and Philosophies in Software Systems Engineering and Information Systems. Hershey: IGI Global.
Moshood, T. D., Adeleke, A. Q., Nawanir, G., & Mahmud, F. (2020). Ranking of human factors affecting contractors’risk attitudes in the Malaysian construction industry. Social Sciences & Humanities, 1-12.
Nagapan, S., Rahman, I. A., & Asmi, A. (2012). Factors contributing to physical and non-physical waste generation in construction industry. International Journal of Advances in Applied Sciences, 1(1), 1-10. https://www.doi.org/10.11591/ijaas.v1i1.476
Niu, Y. (2008). The performance and problems of affordable housing policy in China: The estimations of benefits, costs and affordability. International Journal of Housing Markets and Analysis, 1(2), 125-146. https://doi.org/10.1108/17538270810877763
PMI. (2008). A Guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute.
PMI. (2017). PMBOK 6th Edition - A Guide to the Project Management Body of Knowledge. Newtown Square: Project Management Institute.
Rahman, I. A., Al Ameri, A. E. S., Memon, A. H., Al-Emad, N., & Alhammadi, A. S. M. (2022). Structural Relationship of Causes and Effects of Construction Changes: Case of UAE Construction. Sustainability, 14(2), 596. https://doi.org/10.3390/su14020596
Rehman, M. A., Iqbal, T., & Shakil, M. (2017). Identification of risk factors associated with Pakistan’s construction in-dustry-project manager perspective. International Journal of Business and Social Science, 8(3), 150-157.
Rehman, M. A., & Ishak, M. S. B. (2021). Moderating role of government Acts, laws and policies between team compe-tency and skills and construction risk management among KSA contractors. International Journal of Construction Supply Chain Management, 11(2), 144-165. https://www.doi.org/10.14424/ijcscm110221-144-165
Rehman, M. A., & Ishak, M. S. B. (2022). Moderation role of government policies, laws and Acts between cultural fac-tors and risk management among Saudi Arabian contractors. FWU Journal of Social Sciences, 16(1). http://doi.org/10.51709/19951272/Spring2022/5
Rigdon, E. E. (2012). Rethinking partial least squares path modeling: In praise of simple methods. Long Range Planning, 341-358.
Ripley, M. (2020). The Orange Book: Management of Risk – Principles and Concepts. HM Treasury and Government Finance Function.
Rönkkö, M., & Cho, E. (2022). An updated guideline for assessing discriminant validity. Organizational Research Methods, 25(1), 6–14. https://doi.org/10.1177/1094428120968614
Rostami, A. (2016). Tools and techniques in risk identification: A research within SMEs in the UK Construction Industry. Universal Journal of Management, 4(4), 203-210. https://doi.org/10.13189/ujm.2016.040406
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Sarstedt, M., Ringle, C. M., Smith, D., Reams, R., & Hair Jr., J. F. (2014). Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers. Journal of Family Business Strategy, 5(1), 105-115. https://doi.org/10.1016/j.jfbs.2014.01.002
Satistics, G. A. (2021). General Authority for statistics Kingdom of Saudi Arabia. Retrieved from https://www.stats.gov.sa/: https://www.stats.gov.sa/
Selya, A. S., Rose, J. S., Dierker, L. C., Hedeker, D., & Merme, R. J. (2012). A practical guide to calculating Cohen’s f2, a measure of local effect size, from PROC MIXED. Frontiers in Psychology, 3, 1-6. https://doi.org/10.3389/fpsyg.2012.00111
Sharaf, M. M., & Abdelwahab, H. T. (2015). Analysis of risk factors for highway construction projects in Egypt. Journal of Civil Engineering and Architecture, 9(5), 526-533. https://www.doi.org/10.17265/1934-7359/2015.05.004
Stephen, M., & Raftery, J. (1992). Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), 303-320. https://doi.org/10.1080/01446199200000028
Stone, M. (1974). Cross-validatory choice and assessment of statistical predictions. Journal of the Royal Statistical Society: Series B (Methodological), 36(2), 111-147.
Szymański, P. (2017). 2nd International Joint Conference on Innovative Solutions in Construction Engineering and Management. ORSDCE 2017 (pp. 174-182). Procedia Engineering.
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2007). Risk management in the Chinese construction company. Journal of Construction Engineering and Management, 133(12), 944-956. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(944)
Taofeeq, M. D., Adeleke, A. Q., & Lee, C. K. (2020). Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), 1543-1569. https://doi.org/10.1108/JEDT-08-2019-0192
Thuye, N. V., Ogunlana, S. O., & Dey, P. K. (2007). Risk management in oil and gas construction projects in Vietnam. International Journal of Energy Sector Management, 1(2), 175-194. https://doi.org/10.1108/17506220710761582
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction project in developing countries. Construction Management and Economics, 22(3), 237-252. https://doi.org/10.1080/0144619032000124689
Yamane, T. (1967). Statistics An Introductory Analysis. 2nd Edition. Harper & Row.
Zou, P. X., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(4), 601–614. https://doi.org/10.1016/j.ijproman.2007.03.001



  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2023 | Volume: 8 | Issue: 4 | Views: 1755 | Reviews: 0

Related Articles:
  • A risk management model for large projects in the construction phase in Egy ...
  • Factors affecting the competition of an irrigation construction project usi ...
  • Risk and its impacts on time and cost in construction projects
  • Investigating different challenges in construction projects
  • An empirical study for ranking risk factors using linear assignment: A case ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2025 GrowingScience.Com