How to cite this paper
Foroughi, A & Esfahani, M. (2002). An empirical study for ranking risk factors using linear assignment: A case study of road construction.Management Science Letters , 2(2), 615-622.
Refrences
Baccarini, D., & Archer, R. (2001).The risk ranking of projects: a methodology. International Journal of Project Management, 19(3), 139-145.
Chapman, R. J. (2001). The controlling influences on effective risk identification and assessment for construction design management. International Journal of Project Management, 19(3), 147-160.
Ghosh, S. & Jintanapakanont, J. (2004). Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach. International Journal of Project Management, 22(8), 633-643.
Haimes, Y. (2008). Risk modeling, Assessment, and management. 3rd ed., New York: John Wiley and Sons.
Klein, J.H., & Cork, R. B. (1998). An approach to technical risk assessment. International Journal of Project Management, 16(6), 345-351.
Isaksson, T., & Stille, H. (2005). Model for estimation of time and cost for tunnel projects based on risk evaluation. Rock Mechanic Rock Engineering, 38 (5), 373–398.
Jannadi, O.A. (2008). Risks associated with trenching works in Saudi Arabia. Journal of Building and Environment, 43(5), 776-781.
McDermott, R. E., Mikulak, R. J., & Beauregard, M. R. (1996). The Basics of FMEA, New York: Quality resources.
Ng, A., & Loosemore, M. (2007). Risk allocation in the private provision of public infrastructure. International Journal of Project Management, 25(1), 66-76.
PMI (Project Management Institute) (2004). A Guide to the Project Management Body of Knowledge (PMBOK Guide), Pennsylvania, USA: Newtown Square.
Thevendran, V., & Mawdesley, M.J. (2004). Perception of human risk factors in construction projects: an exploratory study. International Journal of Project Management, 22(2), 131-137.
Xu, L., & Liu, G. (2009). The study of a method of regional environmental risk assessment. Journal of Environmental Management, 90(11), 3290-3296.
Chapman, R. J. (2001). The controlling influences on effective risk identification and assessment for construction design management. International Journal of Project Management, 19(3), 147-160.
Ghosh, S. & Jintanapakanont, J. (2004). Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach. International Journal of Project Management, 22(8), 633-643.
Haimes, Y. (2008). Risk modeling, Assessment, and management. 3rd ed., New York: John Wiley and Sons.
Klein, J.H., & Cork, R. B. (1998). An approach to technical risk assessment. International Journal of Project Management, 16(6), 345-351.
Isaksson, T., & Stille, H. (2005). Model for estimation of time and cost for tunnel projects based on risk evaluation. Rock Mechanic Rock Engineering, 38 (5), 373–398.
Jannadi, O.A. (2008). Risks associated with trenching works in Saudi Arabia. Journal of Building and Environment, 43(5), 776-781.
McDermott, R. E., Mikulak, R. J., & Beauregard, M. R. (1996). The Basics of FMEA, New York: Quality resources.
Ng, A., & Loosemore, M. (2007). Risk allocation in the private provision of public infrastructure. International Journal of Project Management, 25(1), 66-76.
PMI (Project Management Institute) (2004). A Guide to the Project Management Body of Knowledge (PMBOK Guide), Pennsylvania, USA: Newtown Square.
Thevendran, V., & Mawdesley, M.J. (2004). Perception of human risk factors in construction projects: an exploratory study. International Journal of Project Management, 22(2), 131-137.
Xu, L., & Liu, G. (2009). The study of a method of regional environmental risk assessment. Journal of Environmental Management, 90(11), 3290-3296.